This article is an orphan, as no other articles link to it. Please introduce links to this page from related articles; try the Find link tool for suggestions. (June 2016) |
This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed. Find sources: "CESMM3" – news · newspapers · books · scholar · JSTOR (April 2018) (Learn how and when to remove this message) |
The Civil Engineering Standard Method of Measurement (commonly known as CESMM3) sets out a procedure for the preparation of a bill of quantities for civil engineering works, for pricing and for expression and measurement of quantities of work.
CESMM3 includes 26 main clauses of work:
Class | Description |
---|---|
A | General Items |
B | Ground Investigation |
C | Geotechnical & other specialist process |
D | Demolition and Site Clearance |
E | Earthworks |
F | In situ Concrete |
G | Concrete ancillaries |
H | Precast Concrete |
I | Pipework - Pipes |
J | Pipework - Fittings and valves |
K | Pipework - Manholes and pipework ancillaries |
L | Pipework - Supports and protection, ancillary to laying and excavation |
M | Structural Metal works |
N | Miscellaneous Metal works |
O | Timber |
P | Piles |
Q | Piling ancillaries |
R | Roads and pavings |
S | Rail Track |
T | Tunnels |
U | Brickwork, block work and masonry |
V | Painting |
W | Waterproofing |
X | Miscellaneous works |
Y | Sewer and water main renovation and ancillary works |
Z | Simple building works incidental to civil engineering works |
References
- "CESMM3". www.designingbuildings.co.uk. Retrieved 2022-07-25.
This article about a civil engineering topic is a stub. You can help Misplaced Pages by expanding it. |