Misplaced Pages

Chegongzhuang station

Article snapshot taken from[REDACTED] with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Beijing Subway interchange station
Chegongzhuang
车公庄[REDACTED]
Line 2 platform
General information
LocationWest 2nd Ring Road and Chegongzhuang Street (车公庄大街) / Ping'anli West Street (平安里西大街)
Chegongzhuang [zh], Xicheng District, Beijing
China
Coordinates39°55′56.45″N 116°21′20.62″E / 39.9323472°N 116.3557278°E / 39.9323472; 116.3557278
Operated byBeijing Mass Transit Railway Operation Corporation Limited
Line(s)
Platforms4 (1 split island platform and 1 island platform)
Tracks4
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code202 (line 2)
History
OpenedSeptember 20, 1984; 40 years ago (1984-09-20) (line 2)
December 30, 2012; 12 years ago (2012-12-30) (line 6)
Services
Preceding station [REDACTED] Beijing Subway Following station
Fuchengmenouter loop / anticlockwise Line 2 Xizhimeninner loop / clockwise
Chegongzhuangxitowards Jin'anqiao Line 6 Ping'anlitowards Lucheng
Location
Chegongzhuang is located in BeijingChegongzhuangChegongzhuangLocation in central Beijing

Chegongzhuang station (simplified Chinese: 车公庄站; traditional Chinese: 車公莊站; pinyin: Chēgōngzhuāng Zhàn) is an interchange station on Line 2 and Line 6 of the Beijing Subway. The station is on intersection of Chegongzhuang Street and the West 2nd Ring Road. It provides direct access to Guanyuan Park.

Station layout

Both the line 2 and 6 stations have underground island platforms. Line 6 has a split island platform, whilst line 2 has a normal island platform.

Exits

There are 5 exits, lettered A, B, C, E, and H. Exits C and H are accessible.

Future Development

It will be the Southern terminus of Line 13A. Construction of Chegongzhuang station on Line 13A started on 20 April 2024.

Gallery

  • Line 2 platform Line 2 platform
  • Line 2 platform in May 2010 Line 2 platform in May 2010
  • Line 2 platform Line 2 platform
  • Line 2 platform in December 2020 Line 2 platform in December 2020
  • Stairs to exit C Stairs to exit C
  • Line 2 exit Line 2 exit
  • Interchange to Line 6. Interchange to Line 6.
  • Passengers boarding a westbound line 6 train Passengers boarding a westbound line 6 train
  • Line 6 concourse Line 6 concourse
  • Line 6 platform Line 6 platform
  • Eastbound line 6 platform Eastbound line 6 platform
  • Eastbound line 6 platform with escalator to exits A, E, and H to the right Eastbound line 6 platform with escalator to exits A, E, and H to the right
  • Eastbound line 6 platform in November 2016 Eastbound line 6 platform in November 2016
  • Line 6 concourse Line 6 concourse
  • Line 6 train at Chegongzhuang station Line 6 train at Chegongzhuang station
  • Westbound line 6 platform facing east Westbound line 6 platform facing east
  • Corridor to the eastbound line 6 platform Corridor to the eastbound line 6 platform

Notes

  1. ^ "JPG格式线路图下载 北京地铁官方网站". Archived from the original on 2022-12-31.
  2. "车公庄站(6号线)".
  3. "车公庄站(2号线)".
  4. "中铁十六局集团一周要闻(2024.4.15-4.21)". 2024-04-22. Archived from the original on 2024-06-11. 4月20日,地铁公司承建的北京轨道交通扩能提升工程13号线01标项目正式破土动工,标志着该工程进入实质性施工阶段
Xicheng, Beijing
Former districts
Areas
Education
institutions
Higher
Secondary
Facility
Landmarks
Railway stations
Subway stations
History
This list is incomplete.
Beijing Subway stations
Line 2
Line 6
Stations that are proposed, under planning or under construction are shown in italics.


This article related to the Beijing Subway is a stub. You can help Misplaced Pages by expanding it.

Categories:
Chegongzhuang station Add topic