This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed. Find sources: "Cheung Tsing Tunnel" – news · newspapers · books · scholar · JSTOR (April 2015) (Learn how and when to remove this message) |
Overview | |
---|---|
Coordinates | 22°20′56″N 114°06′43″E / 22.34877°N 114.11188°E / 22.34877; 114.11188 |
Status | Active |
System | Part of Route 3 |
Start | Cheung Tsing Bridge |
End | Cheung Tsing Highway |
Operation | |
Opened | 22 May 1997; 27 years ago (1997-05-22) |
Owner | Hong Kong Government |
Traffic | Vehicular |
Technical | |
Length | 1.6 km (0.99 mi) |
No. of lanes | 6 lanes (3 lanes per direction) |
Operating speed | 70 km/h (45 mph) |
Cheung Tsing Tunnel | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Traditional Chinese | 長青隧道 | ||||||||||
Simplified Chinese | 长青隧道 | ||||||||||
| |||||||||||
Cheung Tsing Tunnel, also spelled Cheung Ching Tunnel, is a dual tube 3-lane tunnel on Tsing Yi Island, Hong Kong. It is part of Route 3. Its east end connects to Cheung Tsing Bridge and west Cheung Tsing Highway. The tunnel was opened on 22 May 1997 and is the second toll-free tunnel in Hong Kong. Its length is about 1.6 kilometres.
Construction
The tunnel was given the name "Cheung Ching" (長青) because it is beneath Cheung Ching Estate, the first public housing estate on the island.
Construction through the granite of Tsing Yi Peak required explosives to get through the hardness of the hill. To prevent dislodging of rocks and buildings on the surface slopes the rocks were reinforced by concrete and steel. Although the tunnel used explosives in its construction, boring was more used as the primary digging procedure.
Construction commenced in May 1993 and was completed in January 1997.
Management
The tunnel was managed by Tsing Ma Management Limited under Tsing Ma Control Area, along with Tsing Ma Bridge, Kap Shui Mun Bridge, Ting Kau Bridge, Rambler Channel Bridge, North Lantau Highway and Tsing Kwai Highway.
The traffic of the tunnel is monitored in the buildings at both end, namely East Portal and West Portal Buildings.
References
- "CONSTRUCTION OF THE CHEUNG CHING TUNNEL". The National Academies of Sciences, Engineering, and Medicine. Retrieved 12 May 2021.
External links
Preceded by Cheung Tsing Bridge |
Hong Kong Route 3 Cheung Tsing Tunnel |
Succeeded by Cheung Tsing Highway |
Major road tunnels in Hong Kong | |
---|---|
On Hong Kong Island | |
Crossings of Victoria Harbour | |
In Kowloon and New Kowloon | |
Between New Kowloon and the New Territories | |
In the New Territories | |
α. ^ Entirely in the New Territories, but all access roads on one side pass through New Kowloon. Italics indicate that a tunnel is under construction. |
Hong Kong Strategic Route and Exit Number System | |
---|---|
Route 3 |