Misplaced Pages

Cheung Tsing Tunnel

Article snapshot taken from[REDACTED] with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Tunnel on Tsing Yi Island, Hong Kong

This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.
Find sources: "Cheung Tsing Tunnel" – news · newspapers · books · scholar · JSTOR (April 2015) (Learn how and when to remove this message)
Cheung Tsing Tunnel
Overview
Coordinates22°20′56″N 114°06′43″E / 22.34877°N 114.11188°E / 22.34877; 114.11188
StatusActive
SystemPart of Route 3
StartCheung Tsing Bridge
EndCheung Tsing Highway
Operation
Opened22 May 1997; 27 years ago (1997-05-22)
OwnerHong Kong Government
TrafficVehicular
Technical
Length1.6 km (0.99 mi)
No. of lanes6 lanes (3 lanes per direction)
Operating speed70 km/h (45 mph)
Cheung Tsing Tunnel
Traditional Chinese長青隧道
Simplified Chinese长青隧道
Transcriptions
Standard Mandarin
Hanyu PinyinChángqīng Suìdào
Yue: Cantonese
Yale Romanizationcheung4 ching1 seui6 dou6
Cheung Tsing Tunnel interior

Cheung Tsing Tunnel, also spelled Cheung Ching Tunnel, is a dual tube 3-lane tunnel on Tsing Yi Island, Hong Kong. It is part of Route 3. Its east end connects to Cheung Tsing Bridge and west Cheung Tsing Highway. The tunnel was opened on 22 May 1997 and is the second toll-free tunnel in Hong Kong. Its length is about 1.6 kilometres.

Construction

The tunnel was given the name "Cheung Ching" (長青) because it is beneath Cheung Ching Estate, the first public housing estate on the island.

Construction through the granite of Tsing Yi Peak required explosives to get through the hardness of the hill. To prevent dislodging of rocks and buildings on the surface slopes the rocks were reinforced by concrete and steel. Although the tunnel used explosives in its construction, boring was more used as the primary digging procedure.

Construction commenced in May 1993 and was completed in January 1997.

Management

The tunnel was managed by Tsing Ma Management Limited under Tsing Ma Control Area, along with Tsing Ma Bridge, Kap Shui Mun Bridge, Ting Kau Bridge, Rambler Channel Bridge, North Lantau Highway and Tsing Kwai Highway.

The traffic of the tunnel is monitored in the buildings at both end, namely East Portal and West Portal Buildings.

References

  1. "CONSTRUCTION OF THE CHEUNG CHING TUNNEL". The National Academies of Sciences, Engineering, and Medicine. Retrieved 12 May 2021.

External links

Preceded by
Cheung Tsing Bridge
Hong Kong Route 3

Cheung Tsing Tunnel
Succeeded by
Cheung Tsing Highway
Major road tunnels in Hong Kong
On Hong Kong Island
Crossings of
Victoria Harbour
In Kowloon and New Kowloon
Between New Kowloon and
the New Territories
In the New Territories
α. ^ Entirely in the New Territories, but all access roads on one side pass through New Kowloon.
Italics indicate that a tunnel is under construction.
Hong Kong Strategic Route and Exit Number System
Route 3
Categories:
Cheung Tsing Tunnel Add topic