Misplaced Pages

China Railway CR450BF

Article snapshot taken from[REDACTED] with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Chinese high-speed EMU
China Railway CR450BF
Stock typeElectric multiple unit
ManufacturerCRRC Changchun Railway Vehicles Co., Ltd.
Family nameFuxing
Constructed2024-
Number built1
Number in service0
Formation4M4T
Fleet numbersCR450BF-0501
Capacity552
OperatorsChinaChina Railway
ChinaChina Academy of Railway Sciences
Specifications
Train length211.4 metres (694 ft)
Width3.36 metres (11.0 ft)
Maximum speed
  • Service:
  • 400 km/h (250 mph)
  • Design:
  • 450 km/h (280 mph)
  • Record:
  • 453 km/h (280 mph)
Axle load14.5 tonnes (32,000 lb)
Electric system(s)25kV 50Hz AC
Current collector(s)Pantograph
UIC classification(2’2’)(Bo’Bo’)(2’2’)(Bo’Bo’)(Bo’Bo’)(2’2’)(Bo’Bo’)(2’2’)
Safety system(s)CTCS-400T, Vigilance
Coupling systemScharfenberg
Headlight typeLight Emitting Diode
SeatingLongitudinal
Track gauge1,435 mm (4 ft 8+1⁄2 in)

The CR450BF Fuxing (Chinese: 复兴号; pinyin: Fùxīng Hào) is a Chinese electric high-speed train manufactured by CRRC Changchun Railway Vehicles. As part of the China Standardized EMU, the CR450BF is designed to operate at speed of 400 km/h (250 mph) and a maximum test speed of 450km/h.

History

2020

Drafted between 26 and 29 October on the fifth plenum of the 19th Central Committee of the CCP, the project was announced as part of China’s 14th five-year plan, known as “Research and development plans for speedier bullet train”.

2023

On June 28, test runs were conducted on the Fuzhou-Xiamen high-speed railway using two trainsets: CR400AF-J-0002comprehensive inspection train (CIT) containing a CR450AF intermediate car, and CR400BF-J-0001 comprehensive inspection train (CIT) containing a CR450BF intermediate car. During these tests, a speed of 453 km/h (281 mph) was reached, and a relative speed of 891 km/h (554 mph) was reached, setting a new world record for the relative speed between two conventionally wheeled trains.

On June 29, the test trains ran in Haiwei tunnel and conducted a maximum speed of 420km/h for a single train a 840km/h of relative speed.

2024

On December 29, CRRC hold a media conference in Beijing, China, officially released the two prototypes of CR450 family EMUs, CR450AF-0201 and CR450BF-0501

2025

The CR450BF is expected to enter regular service in 2025, by the end of the 14th five-year plan.

Design

According to CRRC, compared to the CR400BF, the CR450BF :

  • Is 10% lighter
  • Has 22% lower drag
  • Consumes 20% less energy
  • Retains the same 6500m braking distance from 400 km/h as CR400BF from 350 km/h.

Frame

A standard CR450BF has 8 carriages, and is made of lightweight materials such as aluminum, carbon fiber and glass fiber, of which four (cars 2/4/5/7) are power-cars and four (cars 1/3/6/8) are trailers.

Each middle car has two pairs of door at the end of the carriage, except the dining car, which only has one pair. The two lead cars on both of its ends also have two pair of doors fitted but one of them serves as the exclusive access to the driver's cab.

Two sets of pantographs are installed on trailer cars 3 and 6 for collecting current from the overhead catenaries.

Each carriage on the CR450BF has a reduced height, compared to its predecessors, therefore reducing drag by reducing the body cross section area.

Electrical systems

According to CRRC, the CR450BF has a higher traction force by using permanent-magnet synchronous motor (PMSM), which enables at least 3% higher energy conversion efficiency.

The train uses pantograph to gain 25kV 50Hz AC from the overhead catenary, which is the only type of energy source used on the China Railway network all across China.

It also has a storage battery system which can provide the train with a 110V DC power source.

Mechanical systems

The CR450BF prototype has redesigned integrated bogies, which according to CRRC, is 20% lighter than previous generations of traditional externally mounted ones seen on other Chinese high-speed EMUs. Unlike other production models, they are hidden under the side skirt of the frame with a enclosure design for better aerodynamic performance and therefore reduce drag for a better energy efficiency, similar to those seen on the Japanese Shinkansen, or the end-car of German ICE 4.

Interior

There are four classes of seating on board the CR450BF: Second Class, First Class, Premium First class and Business Class. Second Class has 482 seats in a 2-3 layout, similar to other Chinese EMUs and carriages.

First Class has 28 seats in a 2-2 layout. Compared with second class, the seats are made of leather and offer improved comfort with more width and legroom.

Premium first class has 24 seats in a 2-2 layout, and debuted in 2023 on previous CR400 trainsets. Compared with first class, it offers greater legroom and features a footrest.

The business class cabin has undergone various redesigns, consisting of three different types of seating configurations: a 6-seat classic business class setup, a business suite that accommodates six individuals, and a multi-purpose suite that offers more privacy.

Variants

CR450BF (Prototype)

The first trainset built, CR450BF-0501, was first rolled out on November 26, 2024. It is designed for testing and qualification purposes.

Coach sequence of CR450BF-0501 prototype
No Model Type UIC number Class Capacity Length
1 ZYS Trailer car ZYS01xxxx Business/Premium First 30 28550mm
2 ZES Power car ZES02xxxx Second 85 25650mm
3 ZE Trailer car (with pantograph) ZE03xxxx Second 90 25650mm
4 ZE Power car ZE04xxxx Second 80 25650mm
5 ZEC Power car ZEC05xxxx Second/Dining car 63 25650mm
6 ZE Trailer car (with pantograph) ZE06xxxx Second 90 25650mm
7 ZES Power car ZES07xxxx Second 80 25650mm
8 ZYS Trailer car ZYS08xxxx Business/First 34 28550mm

See also

References

  1. ^ Tiwari, Sakshi (2023-07-03). "At 453 KM/H, China Tests World's Fastest, New-Gen High-Speed Train That Is Safer, Energy-Efficient & Intelligent". EURASIAN TIMES. Retrieved 2024-12-31.
  2. Paleja, Ameya. "At 281 miles an hour, China's new high-speed maglev train is the world's fastest". Interesting Engineering. Retrieved 2024-12-30.
  3. "FOCUS | China debuts prototype of fastest high-speed train in the world". english.news.cn. Retrieved 2024-12-29.
  4. ^ "全球最快高铁列车来了!CR450动车组样车发布". www.guancha.cn. Retrieved 2024-12-29.
  5. ^ "CR450AF(样车)动车组 - 动车组列车 - 记录高速动车组列车及城市轨道交通列车发展历程 —— 慧伊创新科技(北京)有限公司". www.china-emu.cn. Retrieved 2024-12-29.
  6. BATRAK, OLEKSANDR (2024-07-30). "CRRC Develops Innovative Bogie for High-Speed Trains". Railway Supply. Retrieved 2025-01-01.
  7. "China debuts prototype of fastest high-speed train in the world". english.www.gov.cn. Retrieved 2024-12-29.
  8. ^ sina_mobile (2024-12-29). "运营时速 400 公里全球最快,我国 CR450 动车组样车内饰、坐席等设计公布". finance.sina.cn. Retrieved 2024-12-29.
  9. "CR450AF departing factory". 2024-11-26.
High-speed rail in China
High-speed demonstrative maglev
National 8+8 high-speed corridors
Coastal
Hangshen
parallel
other branches
Beijing–Shanghai
West route
East route
branches
Beijing–Hong Kong (Taipei)§
To Hong Kong
To Taipei
Harbin–Hong Kong (Macau)§
Hohhot–Nanning
Beijing–KunmingBeijing–Xiong'an–Xinzhou–Xi'an–Chengdu–Yibin–Kunming
Branch lines
Baotou (Yinchuan)–Hainan
Lanzhou (Xining)–Guangzhou
Suifenhe–Manzhouli
Beijing–Lanzhou
Qingdao–Yinchuan
Eurasia Continental
Yangtze River
Old lineShanghai–Wuxi–Nanjing–Hefei–Wuhan–Yichang–Lichuan–Chongqing–Suining–Chengdu
Shanghai–Kunming
Xiamen–Chongqing
Guangzhou–KunmingGuangzhou–Nanning–Kunming
Other conventional high-speed railways (list)
Intercity and
long-distance
North China
Northeast China
East China
Central and South China
Northwest China
Southwest China
Intercity railway
networks
Upgraded lines with
operating speeds
≥ 200 km (120 mi)
Rolling stock
  • Italics: under construction or currently not operational
  • (-), Place A-: section under construction or currently not operational
  • §: in/related to Hong Kong, Macau, Taiwan
  • (Place A–Place B): share tracks with other lines
High-speed rail
Part of rail transport
Technologies
Proposed
High-speed trains
by service speed
or planned service speed
400 km/h
(249 mph)
or more
350–399 km/h
(217–248 mph)
300–349 km/h
(186–217 mph)
250–299 km/h
(155–186 mph)
200–249 km/h
(124–155 mph)
Experimental and prototype high-speed trains (category)
High-speed railway line
By countries and territories

planned networks in italics
Africa
Americas
Asia
Europe
Oceania
Multiple units of China Railway
Electric multiple unit
Centralized Power
Pre-CRH era
Fuxing EMU
Distributed Power
Pre-CRH era
CRH
200-250km/h
350-380km/h
Others
Intercity multiple units
CJ-series intercity units
CRH intercity EMU
Fuxing EMU
200-300km/h
300-400km/h
Diesel multiple unit
Centralized Power
Distributed Power
S = single set
Categories:
China Railway CR450BF Add topic