Article snapshot taken from[REDACTED] with creative commons attribution-sharealike license.
Give it a read and then ask your questions in the chat.
We can research this topic together.
Class of Chinese diesel locomotives
You can help expand this article with text translated from the corresponding article in Chinese. (March 2024) Click for important translation instructions.
View a machine-translated version of the Chinese article.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Misplaced Pages.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Chinese Misplaced Pages article at ]; see its history for attribution.
You may also add the template {{Translated|zh|东风9型柴油机车}} to the talk page.
The DF9 (Chinese: 东风9) was the first Chinesesemi-high-speeddiesel locomotive with a top speed of 160 km/h (99.4 mph), which was successfully developed by Qishuyan Locomotive and Rolling Stock Works in 1990. As part of China's Eighth Five-Year Plan scientific and technological project, the DF9 diesel locomotive adopts wheel-to-hollow shaft traction motor full suspension drive system, high-flexibility second-series round springs, lightweight body and other technologies. Although the only two DF9s produced were scrapped in 2011, it laid the foundation for the development of DF11 diesel locomotives.
In 1991, Qishuyan unveiled the DF9, and in that February, number 0001 was allocated to Zhengzhou Locomotive Depot for a 30,000 km (19,000 mi) endurance trial between Zhengzhou and Wuchang on the Beijing-Guangzhou Railway.
High-speed trials
In the late 1980s, China Railway faced competition from other modes of transport, so they sought to increase train speeds. The Ministry of Railways first decided to upgrade the existing Guangzhou-Shenzhen Railway to 160 km/h (99 mph) operation, in order to gain experience in developing high-speed railways.
On 29 March 1992, DF9 0002, the second locomotive produced, was sent to the Beijing Ring Railway, where extreme wind conditions occurred before the tests. While the locomotive reached 160 km/h (99 mph) during trials, setting a new rail speed record in China, one of its brake pipes failed due to the wind pressure of 600–800 kPa (87–116 psi). In the following 15 days, the DF9 conducted gradual acceleration tests, eventually being pushed to 170 km/h (110 mph) on another speed test.
Service history
Although the DF9, as an experimental class, was never put into serial production, Qishuyan would go on to develop the design into the DF11 in 1993. In 2005, both DF9s were returned to Qishuyan for overhaul, where they would receive several modifications. These included a standardised oil and water piping arrangement, replacement of the original aluminum intercooler with a copper one, modified cabs with air-conditioning and ventilation, and other features present on the DF11s. After overhaul, both locomotives performed similarly to the DF11s.
In the second half of 2010, DF9 0001 was placed into storage at Guangzhou Locomotive Depot, followed by 0002 in the same year. In December 2010, both locomotives were sold through online bidding, and were scrapped in May 2011.
^ Shao, Guangzu (1988). "鐵道部大功率客運內燃機車的研制招標 我廠中標" [The Ministry of Railways issued a tender for the development of high-power passenger diesel locomotives and our factory won the bid.]. 中国铁路 (in Chinese). Dalian: Dalian Diesel Locomotive Research Institute: 72+51. ISSN1003-1820.
Shi, Baoshan (1994). "东风9型内燃机车" [Dongfeng 9 diesel locomotive]. 内燃机车 (in Chinese). Dalian: Dalian Diesel Locomotive Research Institute: 1–7. ISSN1003-1820.
Gong, Shendi (1990). "铁道部通过广深线旅客列车最高时速160km的实施方案" [The Ministry of Railways has approved the implementation plan for the maximum speed of passenger trains on the Guangzhou-Shenzhen line to 160 km/h]. 内燃机车 (in Chinese). Beijing: Institute of Science and Technology Information of the Ministry of Railways. ISSN1001-683X.
Yin, Jian (1992). "环行线160km/h准高速试验噪声测量简介" [Brief Introduction to Noise Measurement of 160km/h Quasi-High-Speed Test on Loop Line]. 科技情报动态 (in Chinese). Technical Center of the Fourth Railway Institute: 4–8.
Yu, Hongliu; Zhu, Chunyong; Jiang, Weiwei (2006). "DF9型内燃机车的改造" [Reconstruction of DF9 diesel locomotive]. 内燃机车 (in Chinese). 394 (12). Dalian: Dalian Locomotive Research Institute: 18–23. ISSN1003-1820.