Pucheng–Meizhou railway | |
---|---|
Overview | |
Native name | 浦梅铁路 |
Status | Partially open |
Termini | |
Service | |
Type | Heavy rail |
History | |
Opened | 30 September 2021 (Jianningxian–Guanzhishan) |
Technical | |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | 50 Hz 25,000 V |
Operating speed | 160 km/h (99 mph) |
The Pucheng–Meizhou railway (Chinese: 浦梅铁路) is a railway line in China. It has a maximum speed of 160 kilometres per hour (99 mph).
History
Tracklaying between Jianning and Guanzhishan was completed in December 2020. The line had been expected to open in June 2021. The 162-kilometre (101-mile) section between Jianningxian and Guanzhishan opened on 30 September 2021.
References
- ^ "刚刚!浦梅铁路建宁至冠豸山段正式开通" (in Chinese). 网易. 1 October 2021. Retrieved 1 October 2021.
- "浦梅铁路建宁至冠豸山段全线铺轨贯通-锦程国际物流". www.jc56.com. Retrieved 2 January 2021.
- "浦梅铁路建宁至冠豸山段今日在龙岩开工建设". 21 April 2016. Retrieved 1 October 2021.