Misplaced Pages

Kedzie station (CTA Green Line)

Article snapshot taken from[REDACTED] with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Chicago "L" station For other 'L' stations on the Chicago Transit Authority named Kedzie, see Kedzie (CTA).
You can help expand this article with text translated from the corresponding article in French. (July 2015) Click for important translation instructions.
  • View a machine-translated version of the French article.
  • Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Misplaced Pages.
  • Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
  • You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing French Misplaced Pages article at ]; see its history for attribution.
  • You may also add the template {{Translated|fr|Kedzie (Ligne verte CTA)}} to the talk page.
  • For more guidance, see Misplaced Pages:Translation.
Kedzie 3200W
200N
Chicago 'L' rapid transit station
General information
Location3200 West Lake Street
Chicago, Illinois 60624
Coordinates41°53′04″N 87°42′22″W / 41.884321°N 87.706155°W / 41.884321; -87.706155
Owned byChicago Transit Authority
Line(s)Lake Branch
Platforms2 side platforms
Tracks2 tracks
ConnectionsCTA Buses
Construction
Structure typeElevated
Bicycle facilitiesyes
AccessibleYes
History
OpenedMarch 1894
Rebuilt1996
Passengers
2022196,613 Increase 21%
Services
Preceding station Chicago "L" Following station
Conservatory–Central Park Drivetoward Harlem/Lake Green Line Californiatoward Ashland/63rd or Cottage Grove
Former services
Preceding station Chicago "L" Following station
HomanClosed 1994toward Harlem/Lake Lake Street Elevated SacramentoClosed 1948toward Loop
(Randolph/Wells) or Market Terminal
Track layout
Legend
Green to Harlem/Lake
Kedzie Ave.
Green to
Ashland/63rd or
Cottage Grove
Location

Kedzie is a station on the Chicago Transit Authority's 'L' system, serving the Green Line and the East Garfield Park neighborhood. It opened in March 1894, and is three blocks south of Metra's Kedzie station on the Union Pacific West Line. It is also near the Chicago Center for Green Technology.

Station layout

The station consists of two side platforms. There is only one entrance to the station, adjacent to the eastbound platform. Access to the westbound platform is provided by a bridge over the platforms. However, each platform does have its own exit-only staircase.

History

The station was opened in March 1894, and is typical of the stations built in 1892-93 by the Lake Street Elevated Railroad, consisting of two rooms of windows on each side of the station. During the first fifty years of its existence, very little changed retaining its original Queen Anne style. Given the weakening of the number of passengers, the presence of an employee's desk was more assured as the hours from January 1, 1958. On January 5, 1964, outputs auxiliary were opened to prevent the crossing of the flow of passengers.

In 1974, the Chicago Transit Authority demolished the two rooms of the counters in order to replace them with a single utility room on the side Inbound to reduce the operating cost of Kedzie. This meant for passengers to Harlem going pay their ticket on the other platform before they can take their train. On January 9, 1994, The Green Line closed for a two-year renovation project. Like other stations of the line, Kedzie, was replaced by new modern equipment built on the model devised by architects Skidmore, Owings & Merrill. The Green Line and Kedzie reopened on May 12, 1996, in a temporary form until the station is fully completed and inaugurated on December 16, 1996.

Unlike previous incarnations of the station, a single pricing control area was built for both directions, it is always located at the level of the paths to the centre (Inbound) but an elevator allows traffic between channels. In December 2002, Kedzie was one of the four new project of Chicago Transit Authority monitoring pilot (with Roosevelt and 95/Dan Ryan on the Red Line and 35/Archer on the Orange Line). Kedzie is accessible to people with reduced mobility and 429.710 passengers have used it in 2008.

Bus and rail connections

CTA

  • 52 Kedzie

Metra

References

  1. "Annual Ridership Report – Calendar Year 2022" (PDF). Chicago Transit Authority, Ridership Analysis and Reporting. February 2, 2023. Retrieved June 20, 2023.

External links

Current Chicago "L" stations
Green Line
Ashland branch
East 63rd branch

This article relating to the Chicago Transit Authority is a stub. You can help Misplaced Pages by expanding it.

Stub icon

This Illinois train station-related article is a stub. You can help Misplaced Pages by expanding it.

Categories:
Kedzie station (CTA Green Line) Add topic