Gren Klaipėda Combined Heat and Power Plant | |
---|---|
Official name | Gren Klaipėda termofikacinė elektrinė |
Country | Lithuania |
Location | Klaipėda |
Coordinates | 55°41′2″N 21°12′1.67″E / 55.68389°N 21.2004639°E / 55.68389; 21.2004639 |
Status | Operational |
Construction began | 2011 |
Commission date | 2013 |
Construction cost | 126 mil. EUR |
Operator | Fortum Heat Lietuva |
Thermal power station | |
Primary fuel | Biomass |
Power generation | |
Nameplate capacity | 20 MW |
Annual net output | 140 GWh (power) 400 GWh (heat) |
External links | |
Website | gren |
[edit on Wikidata] |
Gren Klaipėda, formerly Fortum Klaipėda, is combined heat and power plant in Klaipėda, Lithuania and it uses biomass and waste to produce energy. Originally built in Klaipėda Free Economic Zone by Fortum Heat Lithuania which belongs to Finnish energy company Fortum.
Lithuanian president Dalia Grybauskaitė and Finnish president Sauli Niinistö both participated in the opening ceremony of the plant in 2013.
See also
References
- Klaipėdoje jau gamina energiją iš šiukšlių
- „Fortum Klaipėda“ į jėgainę nori atsivežti atliekų iš kitų šalies regionų
- Klaipėdoje atidaryta termofikacinė elektrinė už 126 mln. EUR
This article about a power station is a stub. You can help Misplaced Pages by expanding it. |
This article about a Lithuanian building or structure is a stub. You can help Misplaced Pages by expanding it. |