Misplaced Pages

Pabna railway station

Article snapshot taken from[REDACTED] with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Railway station in Bangladesh
Pabna Railway Station
পাবনা রেলওয়ে স্টেশন
Railway station in Bangladesh
Pabna Railway Station
General information
LocationPabna, Pabna Sadar Upazila, Pabna District
Bangladesh
Coordinates24°00′58″N 89°15′13″E / 24.0160727°N 89.2535493°E / 24.0160727; 89.2535493
Owned byBangladesh Railway
Line(s)Majhgram–Dhalarchar line
TracksDual Gauge
Construction
Structure typeStandard (on ground station)
Other information
StatusConstructing
Station codePUB
Zone(s) West Zone
Division(s) Paksey
History
Opened2018 (2018)
Services
Preceding station Bangladesh Railway Following station
Tebuniatowards Majhgram Junction Majhgram–Dhalarchar Raghabhpurtowards Dhalarchar
Route map
Iswardi–Sirajganj line
Legend
to
Narayanganj–
Bahadurabad Ghat line
Tarakandi
from Jagannathganj upper
to Joydebpur
Bhuapur
Bangabandhu Bridge East
Jagannathganj Ghat
Jamuna River ferry
(inactive)
Bangabandhu Bridge
Bangabandhu Bridge West
Shahid Mansur Ali
Sirajganj Ghat
Sirajganj Bazar
Raipur (Sirajganj)
Kalia Haripur
Jamtoil Junction
Salop
Ullapara
Mohishakhola
Lahiri Mohanpur
Dilpashar
Sharatnagar
Baralbridge
Bhangura
Guakhra
Chatmohar
Gafurabad
Muladuli
Dhalarchar
Badherhat
Kashinathpur
Chinakhora
Tatibondho
Dublia
Raghabhpur
Pabna
Tebunia
Dasuria
Majhgram Junction
Left arrow
Chilahati–Parbatipur–
Santahar–Darshana line
Left arrow
Chilahati–Parbatipur–
Santahar–Darshana line
Ishwardi Junction
Down arrow
Chilahati–Parbatipur–
Santahar–Darshana line
Source: Bangladesh Railway Route Map
Location

Pabna Railway Station is a railway station on the Majhgram–Dhalarchar branch of Ishwardi–Sirajganj line located in Pabna, Bangladesh. It is situated in Laskarpur area in the city.

History

In 1974, the project of constructing a railway line from Ishwardi to Nagarbari Ghat via Pabna was taken up. But the project was terminated in 1979. after three years of the assassination of the country's prime minister Sheikh Mujibur Rahman in a military coup. It was decided to resume the project in 2010 after Second Hasina ministry came to power. The route of the proposed railway was changed from the last station Nagarbari to Dhalarchar. In 2017, after the completion of the construction work of the Majhgram to Pabna section of the railway line, the train trail started in this section. On 14 July 2018, the Majhgram–Pabna section of the railway line was opened for train traffic. Pabna railway station started operation on the same day. After the complete construction of the railway line in 2019, trails were run in November.

See also

References

  1. ^ Morshed, Sarwar (11 August 2018). পাবনা স্টেশনে একবেলা. Prothom Alo (in Bengali). Retrieved 30 May 2023.
  2. ^ পাবনা-ঢালারচর নতুন রেলপথে প্রথমবারের মতো চলল ট্রেন. Kaler Kantho (in Bengali). 14 November 2019. Retrieved 30 May 2023.
  3. ^ Habib, Shipon (8 July 2018). ঈশ্বরদী-পাবনা রেলপথ চালু ১৪ জুলাই. Jugantor (in Bengali). Retrieved 30 May 2023.
  4. ^ পাবনা ঢালারচর রেলপথ নির্মাণ শেষ চলাচল করলো প্রথম পরীক্ষামুলক ট্রেন. Daily Inqilab (in Bengali). 14 December 2017. Retrieved 30 May 2023.
Categories:
Pabna railway station Add topic