"Riverview Station" redirects here. For station in Queensland, Australia, see Riverview railway station.
Riverview | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Ottawa Transitway station | ||||||||||||||||
General information | ||||||||||||||||
Location | Earl Armstrong Road, Ottawa, Ontario Canada | |||||||||||||||
Coordinates | 45°16′07″N 75°41′41″W / 45.26861°N 75.69472°W / 45.26861; -75.69472 | |||||||||||||||
Owned by | OC Transpo | |||||||||||||||
Construction | ||||||||||||||||
Parking | 160 spaces | |||||||||||||||
History | ||||||||||||||||
Opened | 2009 | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
Riverview is an OC Transpo transit station located in the Riverside South community in Ottawa, Ontario. The station is located south of Earl Armstrong Road east of River Road.
Riverview was officially designated as a Transitway station in the 2009 system map and was part of an eventual rapid transit corridor that would link with the existing Southeast Transitway that ends at Hunt Club Road and South Keys Shopping Centre. The corridor was intended for a previous light-rail extension towards Riverside South which was cancelled in 2006.
The station is located just across from the Vimy Memorial Bridge which was completed in July 2014 and connects Riverside South with Barrhaven across the Rideau River. A rapid transit corridor along Strandherd Drive and Earl Armstrong Road is planned and would eventually connect to the Southwest Transitway near Greenbank Road and Strandherd Drive. Route 74, which previously started and ended at Nepean Woods station, was extended to/from Riverview station via the Vimy Memorial Bridge, and extended again to/from Limebank station in 2024, providing connections to Line 2. Route 99 was also extended to Barrhaven Centre station (and later CitiGate on select trips) from its previous southwest terminus at Riverview.
A park and ride facility with 155 parking spaces is operational at this station. A temporary park and ride area was built in the northwest corridor of River and Earl Armstrong until the completion of the permanent facility.
A dedicated rapid transit corridor is currently zoned and protected by the City of Ottawa in its Ultimate Concept Transportation Master Plan which would connect Riverview through residential areas south of Earl Armstrong Road to the Trillium Line terminus at Limebank station.
The station is not to be confused with the neighbourhood of Riverview, which is located in another part of the city.
Service
See also: OC Transpo routesThe following routes currently serve Riverview:
Riverview station service | |
---|---|
Rapid routes | 74 99 |
Local limited service routes | 198 |
Connexion routes | 278 |
Event routes | 406 |
School routes | 80 99 676 680 |
- In April 2025, Route 99 will be replaced by Route 110 between Limebank and CitiGate. Service between Limebank and Greenboro will be replaced by the O-Train Line 2. Additionally, route 70 (currently 170) will serve this station.
- Only one school trip from Route 80 serves this station during PM hours only.
- Route 299 is available at the intersection of Brian Good Avenue and Earl Armstrong Road but does not serve this station.
- School route 699 is available at the intersection of Brian Good Avenue and Earl Armstrong Road but does not serve this station.
References
- Steve Desroches (1 June 2009). "Increased OC Transpo Service Planned for Riverside South and Leitrim". Riverside South Community Association. Retrieved 15 April 2010.
- "Riverview" (PDF). Station Layout. OC Transpo. December 2015. Retrieved 12 March 2016.
- "Report to Transit Committee and Council". 12 May 2009. Retrieved 6 May 2020.
- "Archived copy". Archived from the original on 17 June 2009. Retrieved 5 September 2009.
{{cite web}}
: CS1 maint: archived copy as title (link)
OC Transpo services in Ottawa | |||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||
| |||||||||||||||||||
|