Misplaced Pages

Shuangqiao Road station

Article snapshot taken from[REDACTED] with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Metro station in Chengdu, China
Shuangqiao Road
双桥路Chengdu Metro
General information
LocationChenghua District, Chengdu, Sichuan
China
Operated byChengdu Metro Limited
Line(s)     Line 4
     Line 8
Platforms4 (2 island platforms)
History
Opened26 December 2015
Services
Preceding station Chengdu Metro Following station
Yushuang Roadtowards Wansheng Line 4 Wannianchangtowards Xihe
Wannian Roadtowards Guilong Road Line 8 Dongdalu Roadtowards Longgang

Shuangqiao Road station (Chinese: 双桥路站; pinyin: Shuāngqiáo Lù zhàn) is a station on Line 4 and Line 8 of the Chengdu Metro in China.

Station layout

G Entrances and Exits Exits A, C-G
B1 Concourse Faregates, Station Agent
B2 Westbound ←      Line 4 towards Wansheng (Yushuang Road)
Island platform, doors open on the left
Easthbound →      Line 4 towards Xihe (Wannianchang)
B3 Northbound ←      Line 8 towards Guilong Road (Wannian Road)
Island platform, doors open on the left
Southbound →      Line 8 towards Longgang (Dongdalu Road)

Gallery

  • Entrance D Entrance D
  • Concourse Concourse
  • Line 4 platform Line 4 platform
  • Line 8 platform Line 8 platform

References

  1. "成都地铁4号线一期运营筹备工作基本就绪" (in Chinese). Chengdu Metro. 2015-11-11. Archived from the original on 2015-12-22. Retrieved 31 August 2020.
  2. "Operated lines". Chengdu Metro. Retrieved 31 August 2020.
Chengdu Metro stations
Line 4
Line 8
Note: Stations in Italic are under construction.
※only interchange service available, no entrance/exit


This article is a stub. You can help Misplaced Pages by expanding it.

Categories:
Shuangqiao Road station Add topic