Three60 | |
---|---|
Three60 nearing completion, with Elizabeth Tower in the background (July 2023) | |
Former names | The Cylinder Great Jackson Street Plot C5-6 |
General information | |
Status | Completed |
Type | Residential skyscraper |
Location | Manchester, Greater Manchester, England, United Kingdom |
Address | Manchester, M15 4ZD |
Coordinates | 53°28′17″N 2°15′17″W / 53.47151°N 2.25470°W / 53.47151; -2.25470 |
Construction started | 2021 |
Completed | 2024 |
Owner | Renaker and Select Property Group |
Height | 154 m (505 ft) |
Technical details | |
Floor count | 51 |
Design and construction | |
Architect(s) | SimpsonHaugh |
Developer | Renaker |
Other information | |
Number of units | 441 |
Website | |
three60newjackson |
Three60 is a cylindrical residential skyscraper in Manchester, England. The building is part of the second phase of the Crown Street development area at the southern end of Deansgate in the city centre, behind the Deansgate Square skyscraper cluster. It was designed by SimpsonHaugh architects. At 154 m (505 ft) tall, the 51-storey tower is the joint fourth-tallest building in Greater Manchester alongside its sister tower The Blade.
History
Planning
The planning application was submitted to Manchester City Council in April 2020 for two adjacent towers, The Cylinder (subsequently renamed Three60) and The Blade, to form the second phase of developer Renaker's Crown Street development, consisting of a combined total of 855 apartments across 950,000 sq ft (88,000 m) of residential space. Three60 will contain 441 apartments. The towers are to be connected at the lower levels by a podium containing 5,200 sq ft (480 m) of commercial space.
Planning approval was obtained in July 2020.
Construction
Construction of the building commenced in 2021. In March 2022, the Greater Manchester Combined Authority approved a £62.3 million loan to Renaker for the development project. Three60 was expected to be completed by spring 2024, and confirmation of its completion was announced in May of that year.
The site of the two towers covers 2.7 acres (1.1 ha) and is next to Chester Road roundabout and the Mancunian Way.
See also
- Elizabeth Tower, adjacent tower which comprises the first phase of the Crown Street development area
- List of tallest buildings in the United Kingdom
- List of tallest buildings and structures in Greater Manchester
References
- ^ "Crown Street Phase 2". SimpsonHaugh. Retrieved 25 February 2023.
- "Renaker unveils second phase of Manchester's Crown Street". Place North West. 28 November 2019. Retrieved 25 February 2023.
- "Six new towers, 3,554 flats, a school and park for the city". Confidentials Manchester. 8 December 2021. Retrieved 25 February 2023.
- "Renaker unveils plans for Manchester's first 70-storey skyscraper". Place North West. 30 January 2023. Retrieved 25 February 2023.
- "Three60". Three60-manchester.com. Retrieved 25 February 2023.
- ^ "Renaker submits plans for pair of 51-storey towers". Place North West. 24 April 2020. Retrieved 25 February 2023.
- "Renaker wins on mixed day for Manchester developers". Place North West. 21 July 2020. Retrieved 25 February 2023.
- "Three60". Skyscraper Center. Retrieved 25 February 2023.
- Whelan, Dan (21 March 2022). "GMCA to pump £62m into Renaker skyscraper". Place North West. Retrieved 22 July 2023.
- "Decision details". Greater Manchester Combined Authority. 29 March 2022. Retrieved 22 July 2023.
- Clyde-Smith, Imogen (25 October 2023). "Incredible first-look pictures from new huge 51-storey skyscraper in Manchester city centre". Manchester Evening News. Retrieved 16 February 2024.
- "Three60, Manchester's First Residential Cylindrical Skyscraper Completes". Renaker. 13 May 2024. Retrieved 12 January 2025.