Misplaced Pages

Build to order (HDB): Difference between revisions

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Browse history interactively← Previous editContent deleted Content addedVisualWikitext
Revision as of 13:49, 15 November 2013 editTimothyhouse1 (talk | contribs)Extended confirmed users7,446 edits BTO Projects← Previous edit Latest revision as of 14:09, 19 December 2024 edit undoJudiciousGoat (talk | contribs)145 edits History: categorise history section; introduce new section on evolution of the schemeTag: Visual edit 
(52 intermediate revisions by 42 users not shown)
Line 1: Line 1:
{{Short description|Real estate development scheme}}
{{for|information on the Build-to-Order (BTO) production concept|Build to Order}}
]
'''Build To Order''' (]: '''BTO'''; ]: 预购组屋制度) is a ] (HDB) flat allocation system that offers flexibility in timing and location for owners buying a New HDB flats in ]. Eligible buyers planning to shift into a new HDB apartment in the near future, can apply for apartments in their preferred location from specific sites launched. Tender for construction will be called only when most of the apartments in a specific contract 65~70% or more have been booked, otherwise, the project will be aborted.


{{Multiple issues|
The waiting time for new flat applicants under the old '''Registration for Flats System''' (RFS) is relatively short, resulting in some applicants getting their flats earlier than they would like to. Hence flats built under the BTO would likely be completed in 4 years or lesser time. For eligible flat buyers in urgent need of accommodation, the new quarterly or half yearly sale system enables them to buy a new ready-flat in a relative short period.
{{Advert|date=April 2024}}
{{Refimprove|date=April 2024}}
{{Rewrite|date=April 2024}}
}}


{{for|information on the Build-to-Order (BTO) production concept|Build to Order}}
All BTO projects are designed by ]. Due to the success of BTO projects, HDB launched the ''']''' (DBSS) for private sector participation in public housing. The first pilot DBSS project at ] would be built by private developer but maintained under the HDB belt after construction.
] of ]]]
'''Build to order''' ('''BTO''') is a ] scheme enacted by the ] (HDB), a statutory board responsible for ]'s public housing. First introduced in 2001, it was a flat allocation system that offered flexibility in timing and location for owners buying new public housing in the country.


Under the scheme, Singaporeans select and apply for an apartment in their preferred location(s) from a list of launch sites. Originally, a tender for construction would be called only if the number of applicants is at least 70% of the number of apartments in a specific contract (50% since 2011), otherwise, the project would not be built. The scheme subsequently evolved, and the HDB now builds flats in advance of demand.
==BTO Unique Features==
*'''ASSURE 3''' <ref></ref> - New Extended ] Scheme Covering ] Leakage (5yrs), External Water ] (5yrs) and Spalling ] (10yrs) for New HDB Flats such as '''Tivela''' launched from March 2005. '''Defect Liability Period''' (DLP) - Previous HDB projects are offers a standard one-year to all purchasers of its new flats. During this period, any building defects are repaired at no cost to the lessees.


==History==
*'''Premium''' apartment for 4, 4A and 5 rooms/loft unit - Internal sqm (90–96 m², 101–103 m² and 110–114 m² / 111–120 m²)
BTO replaced the predecessor Registration for Flats System (RFS) scheme, whereby the waiting time for new flat applicants was relatively shorter because flats were built ahead of demand. In comparison, the new BTO system requires a waiting period of about 3–4 years instead as such a system removes the need for the government to make projections ahead of demand.
**Solid timber doors for all bedrooms
**Semi-solid timber doors for bathrooms
**Polished homogeneous/porcelain tiles & timber-strip for Living/Dining & Bedrooms


All BTO projects are designed by ], an infrastructure and urban development conglomerate owned by ]. To allow private sector a share of the public housing pie, HDB launched the ] (DBSS). The first pilot DBSS project at ] was built by private developer, Sim Lian Group, before subsequently being maintained by the HDB after construction. In 2011, then National Development Minister ] eventually ended the DBSS scheme indefinitely and all BTO projects are now strictly within the public sector.<ref>{{cite news|title=Khaw Boon Wan suspends DBSS land sale|url=https://sg.news.yahoo.com/blogs/singaporescene/khaw-boon-wan-suspends-dbss-land-sale-115432725.html|work=Yahoo Singapore|date=4 July 2011}}</ref>
*'''Standard''' apartment for 2, 3, 4 and 5 rooms - Internal sqm (35–45 m², 65 m², 90–94 m² and 110 m²)
**Semi-solid timber doors for all rooms
**Glazed ceramic tiles for Living/Dining & Bedrooms (optional)


=== Sale of balance ===
*'''Optional Component Scheme''' (OCS) - More flexibility and choices to have floor finishes and internal timber doors installed. The opt-in basic cost are usually about '''20~30%''' cheaper due to bulk purchases and less labour charges. But those who want variety of timber or bi-fold doors design, and better homogeneous tiles or tiles/timber skirting can opt-out the schemes.
HDB has introduced a scheme under which eligible flat buyers in urgent need of accommodation, can ballot for leftover units that are reintroduced into the market, known as Sales of Balance flats (SBF).


In February 2019, it was announced that starting from the middle of 2019, flat buyers will be able to apply for unsold BTO flats online anytime on a first-come, first-served basis, and book a flat by the next working day. This was intended to help citizens with an urgent need for housing.<ref>{{cite news |date=7 February 2019 |title=HDB home buyers can soon book unsold balance flats at any time |url=https://www.channelnewsasia.com/news/singapore/hdb-unsold-balance-flats-rof-book-any-time-bto-11208478 |work=Channel NewsAsia}}</ref>
* '''Universal Design''' (UD) - These include ramps at main entrance, levelled floors throughout the flat, wider internal corridors, bedroom and toilet doors, wheelchair-accessible common toilet, space provision for future installation of grab bars in all toilets, as well as easily accessible switch sockets, TV outlets and telephone outlets. New HDB Flats such as '''Fernvale Vista''' launched from July 2006.


=== Evolution of the scheme ===
* '''Ferrolite Wall''' <ref></ref> - HDB new patented wall using a material called ], which is similar to concrete but uses less sand as it contains a steel wire mesh. A ferrolite wall uses 20 per cent less sand than a concrete one. It is less susceptible to cracking and heat from the sun and have better sound-insulation capabilities. It is a piloted project launched from 2006 for selective '''Fernvale Court''', '''Treelodge''' and '''Kim Tian Green'''.
In recent years, the HDB has been commencing construction for housing projects in advance of public demand.


In October 2024, HDB chief executive Tan Meng Dui explained that construction work for project sites may begin months, and in some cases more than a year, before the actual launch of the project.<ref>{{Cite news |last=Yang |first=Wong |date=6 October 2024 |title=Over 2,000 BTO flats with waiting time of under 3 years to be launched in October |url=https://www.straitstimes.com/singapore/housing/over-2000-bto-flats-with-waiting-times-of-under-3-years-to-be-launched-in-october |archive-url=http://web.archive.org/web/20241124053550/https://www.straitstimes.com/singapore/housing/over-2000-bto-flats-with-waiting-times-of-under-3-years-to-be-launched-in-october |archive-date=2024-11-24 |access-date=2024-12-19 |work=The Straits Times |language=en}}</ref>
==BTO Projects==
{| class="wikitable" width="100%" style="font-size: 95%; text-align:left;"
|-
| align="center" width="9%"| '''Place'''
| align="center" width="14%"| '''BTO Precincts''' /<br> '''Block No'''
| align="center" width="6%"| '''Launched<br>Completion'''
| align="center" width="6%"| '''Type'''
| align="center" width="10%"| '''No of units<br>(Internal sqm)'''
| align="center" width="12%"| '''Initial launched<br>Price ranges'''
|-
| ''']'''
| ''']'''<br>Duxton<br>1A, 1B, 1C, 1D, 1E, 1F, 1G
| May 2004<br>May 2010
| Premium
| 1,232 (90–93 m²)<br>616 (101–103 m²)
| $288,400 - $392,100<br>$343,100 - $451,500
|-
| ''']'''
| Golden Jasmine<br>152B
| Sep 2006<br>Sep 2010
| Studio<br>UD<br><sup>Assure 3</sup>
| 58 (35 m²)<br>118 (45 m²)
| $62,000 - $65,000<br>$79,000 - $83,000
|-
| ''']
| Golden Kismis
| Mar 2012<br>Q3 2015
| Studio<br>UD<br><sup>Assure 3</sup>
| 58 (35 m²)<br>118 (45 m²)
| $62,000 - $65,000<br>$79,000 - $83,000
|}
===]===
*Buangkok Vale - blocks 987A to 988C
*Hougang Parkview (U/C) - blocks 470A to 471C
*Capeview (U/C) - blocks
*Dew Court (U/C) - blocks 376A to 376C
*Hougang ParkEdge (U/C) - blocks 473A to 475D
*Golden Mint (U/C) - blocks
*Hougang Crimson (U/C) - blocks 932 to 934C


In December 2024, it was announced that HDB had commenced structural works on various projects in Clementi, Toa Payoh, and Bukit Merah, before the projects had been launched for sale.<ref>{{Cite news |last=Ng |first=Keng Gene |date=15 December 2024 |title=HDB starts work on flats not announced for sale yet in Clementi, Toa Payoh and Bukit Merah |url=https://www.straitstimes.com/singapore/housing/hdb-starts-work-on-flats-not-announced-for-sale-yet-in-clementi-toa-payoh-and-bukit-merah |access-date=19 December 2024 |work=]}}</ref>
===]===
*Segar Meadows - blocks 455 to 461
*Senja Green - blocks 632A to 633D
*Segar Grove (U/C) - blocks 485 to 488
*Senja Gateway (U/C) - blocks 634 to 635B
*Senja Parc View (U/C) - blocks 636 to 636D
*Segar Vale (U/C) - blocks 546 to 547D
* Segar Palmview (U/C) - blocks 548B to 550B
*Fajar Hills (U/C) - blocks 442 to 443B


===Choa Chu Kang=== ==Unique features==
*ASSURE 3<ref> {{webarchive |url=https://web.archive.org/web/20140513074542/http://www.hdb.gov.sg/fi10/fi10320p.nsf/w/AboutUsPublicHousing?OpenDocument#assure |date=May 13, 2014 }}</ref> – New Extended ] Scheme Covering ] Leakage (5yrs), External Water ] (5yrs) and Spalling ] (10yrs) for New HDB Flats such as Tivela launched from March 2005. Defect Liability Period (DLP) – Previous HDB projects are offers a standard one-year to all purchasers of its new flats. During this period, any building defects are repaired at no cost to the lessees.
*Sunshine Court
*Premium apartment for 4, 4A and 5 rooms/loft unit – Internal square metres (90–96&nbsp;m<sup>2</sup>, 101–103&nbsp;m<sup>2</sup> and 110–114&nbsp;m<sup>2</sup> / 111–120&nbsp;m<sup>2</sup>)
*Limbang Green
**Solid timber doors for all bedrooms
*Sunshine Gardens (U/C) - blocks 488 to 490C
**Semi-solid timber doors for bathrooms
*Keat Hong Pride (U/C) - blocks 803 to 805D
**Polished homogeneous/porcelain tiles & timber-strip for Living/Dining & Bedrooms
*Keat Hong Axis (U/C) - blocks 807 to 809C
*Standard apartment for 2, 3, 4 and 5 rooms - Internal square metres (40–55&nbsp;m<sup>2</sup>, 65&nbsp;m<sup>2</sup>, 90–94&nbsp;m<sup>2</sup> and 110–120&nbsp;m<sup>2</sup>)
*Keat Hong Quad (U/C) - blocks 814 to 815C
**Semi-solid timber doors for all rooms (OCS)
*Keat Hong Mirage (U/C) - blocks 816A to 818D
**Glazed ceramic tiles for Living/Dining & Bedrooms (OCS)
*Keat Hong Colours (U/C) - blocks 810 to 813B
*Optional Component Scheme (OCS) – More flexibility and choices to have floor finishes and internal timber doors installed. The opt-in basic cost are usually about 20~30% cheaper due to bulk purchases and less labour charges. But those who want variety of timber or bi-fold doors design, and better homogeneous/porcelain tiles or tiles/timber skirting can opt out of the schemes.
*Keat Hong Crest (U/C) - blocks 801 to 802B
* Universal Design (UD) – These include ramps at main entrance, levelled floors throughout the flat, wider internal corridors, bedroom and toilet doors, wheelchair-accessible common toilet, space provision for future installation of grab bars in all toilets, as well as easily accessible switch sockets, TV outlets and telephone outlets. New HDB Flats such as Fernvale Vista launched from July 2006.

* Ferrolite Wall <ref> {{webarchive |url=https://web.archive.org/web/20081009210904/http://www.engseng.com.sg/prod02.htm |date=October 9, 2008 }}</ref> – HDB new patented wall using a material called ], which is similar to concrete but uses less sand as it contains a steel wire mesh. A ferrolite wall uses 20 per cent less sand than a concrete one. It is less susceptible to cracking and heat from the sun and has better sound-insulation capabilities. It is a piloted project launched from 2006 for selective Fernvale Court, Treelodge and Kim Tian Green.
===] & ]===
*Boon Lay Meadow
*Boon Lay Grove
*Corporation Tiara
*Boon Lay Fields (U/C)
*Golden Orchid (U/C)
*Golden Peony (U/C)
*Spring Heaven @ Jurong (U/C)

===]===
*Edgedale Green
*Periwinkle
*<s>Sundial</s>
*<s>Anthias</s>
*Coralinus 1
* Coralinus 2
*Treelodge
*Punggol Vista
*Punggol Lodge
*Damai Grove
* Punggol Spring
*Punggol Sapphire
*Punggol Breeze
*Punggol Arcadia
*Punggol Regalia
*Punggol Naulitus
*Punggol Residences
*Punggol Spectra
*Punggol Ripples
*Punggol Sails
*Punggol Crest
*Punggol Emerald - blocks 264A to 265D
*Punggol Waves
*Waterway Terraces (U/C) - blocks 308A to 308C, 310A to 310C
*Punggol Topaz (U/C) - blocks 258A to 259D
*Punggol ParcVista (U/C) - blocks 312A to 313D
*Waterway Woodcress (U/C) - blocks 665A to 667B
*Waterway Brooks (U/C) - blocks 676A to 679D
*Waterway Ridges (U/C) - blocks 668A to 670C
*Waterway Banks (U/C) - blocks 671 to 673C
*Waterway Sunbeam (U/C) - blocks 663 to 664B
*Punggol Edge (U/C) - blocks 120A to 122D
*Waterway SunDew (U/C) - blocks 660 to 662C
*Punggol Opal (U/C) - blocks 256A to 257D, 260A to 261C
*Waterway Cascadia (U/C) - blocks 314 to 316B
*Matilda Portico (U/C) - blocks 217A to 218
*Matilda Edge (U/C) - blocks 220 to 224C
*The Verandah @ Matilda (U/C) - blocks 225A to 227D
*Waterway View (U/C) - blocks 682 to 683D

===]===
*SkyVille @ Dawson
*SkyTerrace @ Dawson

===]===
*<s>Flowing Greenery</s>
*River Edge
*<s>Spring Lodge</s>
*Sembawang Green
*Montreal Dale
*River Lodge
*Montreal Ville
*EastBank @ Canberra
*EastBrook @ Canberra
*EastVale @ Canberra

===]===
*Arcadia
*Rivervale Green
*Coris 1
*Coris 2
*Aspella 1
*Aspella 2
*Atrina 1
*Atrina 2
*Fernvale Grove
*Coral Green
*Tivela
*Fernvale Court
*Fernvale Vista 1
*Fernvale Vista 2
*Coral Spring
*Compassvale Pearl
*Compassvale Beacon
*Fernvale Residence
*Compassvale View
*Fernvale Crest
*Fernvale Palms
*Fernvale Ridge
*Fernvale Foilage
*Rivervale Arch
*Anchorvale Horizon
*Fernvale Flora (U/C)
*Fernvale Gardens (U/C)
*Compassvale Ancilla (U/C)
*Anchorvale Grove (U/C)
*Anchorvale Isles (U/C)
*Anchorvale Harvest (U/C)
*Fernvale Riverbow (U/C)
*Fernvale Rivergrove (U/C)
*Fernvale Lea (U/C)
*Compassvale Boardwalk (U/C)
*Compassvale Mast (U/C)
*Rivervale Delta (U/C)
*Compassvale Cape (U/C)
*Compassvale Helm (U/C)
*Fernvale Riverwalk (U/C)

===]===
*Straits Vista
*Champions Court
*Treegrove (U/C)
*Woodlands Dew (U/C)
*Woodlands Meadow (U/C)
*Woodlands Peak (U/C)
*TreeTrail @ Woodlands (U/C)
*Golden Saffron (U/C)
*Woodlands Pasture I & II (U/C)


===]=== ==BTO projects==
The demand for BTO flats was low in the first years, resulting in the cancellation of 5 projects as they did not meet the requirement of minimum 70% application ratio. However, once the demand recovered, HDB has launched between 20 and 40 BTO projects annually since 2010, which consists of 15,000–28,000 units. By the end of 2015, HDB had launched 251 BTO projects, comprising 168,453 units.<ref>{{Cite web |last=Teoalida |date=2019-10-17 |title=List of BTO projects and brochures |url=https://www.teoalida.com/singapore/btolist/ |access-date=2024-04-22 |website=The world of Teoalida |language=en-US}}</ref>
*Yishun Jadespring - blocks 443 to 452
*Floral Spring @ Yishun - blocks 426A to 426D, 428 to 428B
*Yishun Greenwalk (U/C) - blocks 315 to 318C
*Yishun Riverwalk (U/C) - blocks 333A to 336C
*Orchid Spring @ Yishun (U/C) - blocks 429A to 430C
*Vista Spring @ Yishun (U/C) - blocks 431A to 432C
*Yishun Natura (U/C) - blocks 342A to 342D
*Acacia Breeze (U/C) - blocks 504A to 505C
*Oleander Breeze @ Yishun (U/C) - blocks 510 to 512C
*Angsana Breeze (U/C) - blocks 506 to 509C
*Vine Grove (U/C) - blocks 671A to 672C
*Khatib Court (U/C) - blocks 813 to 813B
*Palm Breeze @ Yishun (U/C) - blocks 501A to 503D
*Sacacia Breeze @ Yishun (U/C) - blocks 513A to 513D
===Tampines===
*Tampines Greenlace (U/C) - blocks 870A to 871B
*Tampines GreenForest (U/C) - blocks 878A to 879D
*Tampines GreenTerrace (U/C) - blocks 890A to 890E
*Tampines Alcoves (U/C) - blocks 494D to 494E
*Golden Carnation - block 117 and 117A
*Tampines GreenLeaf (U/C) - blocks 522A to 524C
*Tampines GreenWood (U/C) - blocks 868A to 869B
===Pasir Ris===
*Costa Ris (U/C) - blocks 524A to 528C
*Golden Lily (U/C) - block 212A
===Bedok===
*Ping Yi Greens (U/C) - blocks 807A to 808C
*Fengshan Greenville (U/C) - blocks 186 to 188D
===Geylang===
*Sri Geylang Serai - block 1 to 2D
*MacPherson Residency (U/C)
*Greentops @ Sims Place (U/C)
===Toa Payoh===
* Golden Clover (U/C) - block 196
*Joo Seng Green (U/C)
*Toa Payoh Crest (U/C) - blocks 130A to 131C
===Bukit Merah===
*Telok Blangah Towers
*Depot Heights (U/C)
*Telok Blangah Ridgeview (U/C)
*Telok Blangah ParcView (U/C)
===Bukit Batok===
*Skyline I @ Bukit Batok (U/C)
*Skyline II @ Bukit Batok (U/C)
*SkyPeak @ Bukit Batok (U/C)
===Ang Mo Kio===
* Yio Chu Kang Vista (U/C)
*Cheng San Court (U/C)
*Teck Ghee Parkview (U/C)
*Kebun Baru Court (U/C)
===Kallang/Whampoa===
*Bendemeer Light (U/C)
*McNair Towers (U/C)
*Whampoa Dew (U/C)
*Tenteram Peak (U/C)


Construction costs for 5-room, 4-room, 3-room & 2-room units respectively averaged about $160,000, $120,000, $80,000 & $40,000 (based on 2004 cost). This also include the cost of sub-contractors and construction of ]s, ]s, electrical ]s (ESS), child-care centres, playgrounds, fitness corners, linkway shelters and general landscaping.
===Clementi===
*Clementi Ridges (U/C) - blocks 312A to 312D
*Clementi Gateway (U/C)


==Notes== ==References==
{{reflist}} {{reflist}}


==External links== ==External links==
*
*


{{Public housing in Singapore}} {{Public housing in Singapore}}


] ]
]

Latest revision as of 14:09, 19 December 2024

Real estate development scheme
This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these messages)
This article contains promotional content. Please help improve it by removing promotional language and inappropriate external links, and by adding encyclopedic text written from a neutral point of view. (April 2024) (Learn how and when to remove this message)
This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.
Find sources: "Build to order" HDB – news · newspapers · books · scholar · JSTOR (April 2024) (Learn how and when to remove this message)
This article may need to be rewritten to comply with Misplaced Pages's quality standards. You can help. The talk page may contain suggestions. (April 2024)
(Learn how and when to remove this message)
For information on the Build-to-Order (BTO) production concept, see Build to Order.
BTO residences in the North-East Region of Punggol

Build to order (BTO) is a real estate development scheme enacted by the Housing and Development Board (HDB), a statutory board responsible for Singapore's public housing. First introduced in 2001, it was a flat allocation system that offered flexibility in timing and location for owners buying new public housing in the country.

Under the scheme, Singaporeans select and apply for an apartment in their preferred location(s) from a list of launch sites. Originally, a tender for construction would be called only if the number of applicants is at least 70% of the number of apartments in a specific contract (50% since 2011), otherwise, the project would not be built. The scheme subsequently evolved, and the HDB now builds flats in advance of demand.

History

BTO replaced the predecessor Registration for Flats System (RFS) scheme, whereby the waiting time for new flat applicants was relatively shorter because flats were built ahead of demand. In comparison, the new BTO system requires a waiting period of about 3–4 years instead as such a system removes the need for the government to make projections ahead of demand.

All BTO projects are designed by Surbana Corporation, an infrastructure and urban development conglomerate owned by Temasek Holdings. To allow private sector a share of the public housing pie, HDB launched the Design, Build and Sell Scheme (DBSS). The first pilot DBSS project at Tampines was built by private developer, Sim Lian Group, before subsequently being maintained by the HDB after construction. In 2011, then National Development Minister Khaw Boon Wan eventually ended the DBSS scheme indefinitely and all BTO projects are now strictly within the public sector.

Sale of balance

HDB has introduced a scheme under which eligible flat buyers in urgent need of accommodation, can ballot for leftover units that are reintroduced into the market, known as Sales of Balance flats (SBF).

In February 2019, it was announced that starting from the middle of 2019, flat buyers will be able to apply for unsold BTO flats online anytime on a first-come, first-served basis, and book a flat by the next working day. This was intended to help citizens with an urgent need for housing.

Evolution of the scheme

In recent years, the HDB has been commencing construction for housing projects in advance of public demand.

In October 2024, HDB chief executive Tan Meng Dui explained that construction work for project sites may begin months, and in some cases more than a year, before the actual launch of the project.

In December 2024, it was announced that HDB had commenced structural works on various projects in Clementi, Toa Payoh, and Bukit Merah, before the projects had been launched for sale.

Unique features

  • ASSURE 3 – New Extended Warranty Scheme Covering Ceiling Leakage (5yrs), External Water Seepage (5yrs) and Spalling Concrete (10yrs) for New HDB Flats such as Tivela launched from March 2005. Defect Liability Period (DLP) – Previous HDB projects are offers a standard one-year to all purchasers of its new flats. During this period, any building defects are repaired at no cost to the lessees.
  • Premium apartment for 4, 4A and 5 rooms/loft unit – Internal square metres (90–96 m, 101–103 m and 110–114 m / 111–120 m)
    • Solid timber doors for all bedrooms
    • Semi-solid timber doors for bathrooms
    • Polished homogeneous/porcelain tiles & timber-strip for Living/Dining & Bedrooms
  • Standard apartment for 2, 3, 4 and 5 rooms - Internal square metres (40–55 m, 65 m, 90–94 m and 110–120 m)
    • Semi-solid timber doors for all rooms (OCS)
    • Glazed ceramic tiles for Living/Dining & Bedrooms (OCS)
  • Optional Component Scheme (OCS) – More flexibility and choices to have floor finishes and internal timber doors installed. The opt-in basic cost are usually about 20~30% cheaper due to bulk purchases and less labour charges. But those who want variety of timber or bi-fold doors design, and better homogeneous/porcelain tiles or tiles/timber skirting can opt out of the schemes.
  • Universal Design (UD) – These include ramps at main entrance, levelled floors throughout the flat, wider internal corridors, bedroom and toilet doors, wheelchair-accessible common toilet, space provision for future installation of grab bars in all toilets, as well as easily accessible switch sockets, TV outlets and telephone outlets. New HDB Flats such as Fernvale Vista launched from July 2006.
  • Ferrolite Wall – HDB new patented wall using a material called ferrocement, which is similar to concrete but uses less sand as it contains a steel wire mesh. A ferrolite wall uses 20 per cent less sand than a concrete one. It is less susceptible to cracking and heat from the sun and has better sound-insulation capabilities. It is a piloted project launched from 2006 for selective Fernvale Court, Treelodge and Kim Tian Green.

BTO projects

The demand for BTO flats was low in the first years, resulting in the cancellation of 5 projects as they did not meet the requirement of minimum 70% application ratio. However, once the demand recovered, HDB has launched between 20 and 40 BTO projects annually since 2010, which consists of 15,000–28,000 units. By the end of 2015, HDB had launched 251 BTO projects, comprising 168,453 units.

Construction costs for 5-room, 4-room, 3-room & 2-room units respectively averaged about $160,000, $120,000, $80,000 & $40,000 (based on 2004 cost). This also include the cost of sub-contractors and construction of multistorey car parks, lifts, electrical substations (ESS), child-care centres, playgrounds, fitness corners, linkway shelters and general landscaping.

References

  1. "Khaw Boon Wan suspends DBSS land sale". Yahoo Singapore. 4 July 2011.
  2. "HDB home buyers can soon book unsold balance flats at any time". Channel NewsAsia. 7 February 2019.
  3. Yang, Wong (6 October 2024). "Over 2,000 BTO flats with waiting time of under 3 years to be launched in October". The Straits Times. Archived from the original on 2024-11-24. Retrieved 2024-12-19.
  4. Ng, Keng Gene (15 December 2024). "HDB starts work on flats not announced for sale yet in Clementi, Toa Payoh and Bukit Merah". The Straits Times. Retrieved 19 December 2024.
  5. ASSURE 3: New Extended Warranty Scheme Covering Ceiling Leakage, External Water Seepage And Spalling Concrete For New HDB Flats Archived May 13, 2014, at the Wayback Machine
  6. Ferrolite Partition Wall Panels Archived October 9, 2008, at the Wayback Machine
  7. Teoalida (2019-10-17). "List of BTO projects and brochures". The world of Teoalida. Retrieved 2024-04-22.

External links

Public housing in Singapore
Organisations
Building programmes
Upgrading programmes
New towns
Estates
Other
Categories: