Revision as of 06:33, 23 August 2024 edit1.23.198.30 (talk) reference: Thirumangalm Metro station to Nehru park station opening date and station namesTag: Visual edit← Previous edit | Latest revision as of 03:55, 3 January 2025 edit undoAnomieBOT (talk | contribs)Bots6,573,680 edits Rescuing orphaned refs ("AR" from rev 1264797773) | ||
(21 intermediate revisions by 14 users not shown) | |||
Line 1: | Line 1: | ||
{{Short description|Rapid transit system in Chennai, India}} | {{Short description|Rapid transit system in Chennai, India}} | ||
{{good article}} | |||
{{for|the elevated railway line|Chennai Mass Rapid Transit System}} | {{for|the elevated railway line|Chennai Mass Rapid Transit System}} | ||
{{Use Indian English|date=April 2014}} | {{Use Indian English|date=April 2014}} | ||
Line 14: | Line 14: | ||
| imagesize2 = 300px | | imagesize2 = 300px | ||
| caption2 = A metro train at ] on the ] | | caption2 = A metro train at ] on the ] | ||
| native_name = | |||
| native_name = {{lang|ta|சென்னை மாநகரத் தொடரி}} | |||
| owner = ] (CMRL) | | owner = ] (CMRL) | ||
| area served = | | area served = | ||
Line 20: | Line 20: | ||
| transit_type = ] | | transit_type = ] | ||
| lines = 2 (operational) <br> 3 (under construction) | | lines = 2 (operational) <br> 3 (under construction) | ||
| line_number = Operational<br/>{{plainlist| | | line_number = '''Operational'''<br/>{{plainlist| | ||
* {{rcb|Chennai Metro|blue|croute}} | |||
* {{color box|#{{rail color|Chennai Metro|Blue}}; font-size:100%|]|}} | |||
* {{ |
* {{rcb|Chennai Metro|green|croute}} <br> '''Under construction''' | ||
* {{rcb|Chennai Metro|purple|croute}} | |||
* {{color box|#800080; font-size:100%|]|}} | |||
* {{rcb|Chennai Metro|orange|croute}} | |||
* {{color box|#ff6600; font-size:100%|]|}} | |||
* {{rcb|Chennai Metro|red|croute}} | |||
* {{color box|#ff0000; font-size:100%|]|}} | |||
}} | }} | ||
| stations = ] | | stations = ] | ||
Line 39: | Line 39: | ||
| track_gauge = {{Track gauge|sg|allk=on}} | | track_gauge = {{Track gauge|sg|allk=on}} | ||
| el = {{25 kV 50 Hz}} ]<ref>{{cite news|title=Metro Rail: power supply, overhead equipment contract given|url=https://chennaimetrorail.org/wp-content/uploads/2015/11/hindu23-2-11.pdf|publisher=]|date=2 November 2015|access-date=31 January 2023|archive-date=8 April 2023|archive-url=https://web.archive.org/web/20230408221113/https://chennaimetrorail.org/wp-content/uploads/2015/11/hindu23-2-11.pdf|url-status=live}}</ref> | | el = {{25 kV 50 Hz}} ]<ref>{{cite news|title=Metro Rail: power supply, overhead equipment contract given|url=https://chennaimetrorail.org/wp-content/uploads/2015/11/hindu23-2-11.pdf|publisher=]|date=2 November 2015|access-date=31 January 2023|archive-date=8 April 2023|archive-url=https://web.archive.org/web/20230408221113/https://chennaimetrorail.org/wp-content/uploads/2015/11/hindu23-2-11.pdf|url-status=live}}</ref> | ||
| daily_ridership = |
| daily_ridership = 288329 (2024)<ref>{{Cite web|title=10.52 crore passengers travelled in Chennai Metro Train in 2024|url=https://wcag.chennaimetrorail.org/wp-content/uploads/2025/01/Press-Release-02.01.2025-English.pdf}}</ref> | ||
| annual_ridership = 105.24 million (2024) <ref>{{Cite web|title=10.52 crore passengers travelled in Chennai Metro Train in 2024|url=https://wcag.chennaimetrorail.org/wp-content/uploads/2025/01/Press-Release-02.01.2025-English.pdf}}</ref> | |||
| annual_ridership = 70.7 million (2022-23)<ref name="AR"/> | |||
| top_speed = {{cvt|120|km/h}} | | top_speed = {{cvt|120|km/h}} | ||
| map = ] | | map = ] | ||
Line 47: | Line 47: | ||
}} | }} | ||
The '''Chennai Metro''' is a ] system serving the city of ], India. Operated by ] (CMRL) – a ] between the ] and the ], the network consists of two lines and spans {{cvt|54.1|km}}. The system uses ] and has 41 underground and elevated stations. | The '''Chennai Metro''' is a ] system serving the city of ], India. Operated by ] (CMRL) – a ] between the ] and the ], the network consists of two lines and spans {{cvt|54.1|km}}. The system uses ] and has 41 underground and elevated stations. | ||
Planning for the Metro started in 2007-08 with construction commencing in February 2009. After testing in 2014, the first segment of the metro between the ] and ] stations on the ] began operations on 29 June 2015. On 21 September 2016, operations on the ] commenced between ] and ]. The underground stretch from ] to ] of Blue Line opened on 10 February 2019, completing phase 1 of the Metro. |
Planning for the Metro started in 2007-08 with construction commencing in February 2009. After testing in 2014, the first segment of the metro between the ] and ] stations on the ] began operations on 29 June 2015. On 21 September 2016, operations on the ] commenced between ] and ]. The underground stretch from ] to ] of Blue Line opened on 10 February 2019, completing phase 1 of the Metro. | ||
Three more lines covering a length of {{cvt|118.9|km}} are under construction as part of the second phase. The ], operated by ], is planned to be incorporated into the Chennai Metro. A ] has been proposed to connect ] of the ] rail network with ] on the MRTS. Further extensions are also planned for the three lines under construction. |
Three more lines covering a length of {{cvt|118.9|km}} are under construction as part of the second phase. The ], operated by ], is planned to be incorporated into the Chennai Metro. A ] has been proposed to connect ] of the ] rail network with ] on the MRTS. Further extensions are also planned for the three lines under construction. | ||
== Background == | == Background == | ||
Line 59: | Line 59: | ||
=== Phase I === | === Phase I === | ||
{{Phase I, Chennai Metro|collapse=yes}} | {{Phase I, Chennai Metro|collapse=yes}} | ||
The ] (DMRC) was tasked to prepare a project report on the implementation of metro system in Chennai.<ref name="P1"/> The ] approved the first phase of the project in November 2007.<ref name="FAQ">{{cite news|url=https://chennaimetrorail.org/faq/|title=Chennai Metro Rail FAQ|publisher=]|access-date=16 February 2018|archive-date=27 February 2018|archive-url=https://web.archive.org/web/20180227110901/http://chennaimetrorail.org/faq/|url-status=live}}</ref> The first phase was planned with two lines covering {{cvt|45.1|km}} with {{cvt|25|km}} being underground. The first corridor would connect ] with ] extending for {{cvt|23.1|km}} with {{cvt|14.3|km}} being underground and the second corridor would connect ] with ] extending for {{cvt|22|km}} with {{cvt|9.7|km}} being underground.<ref name="P1"/> In December 2007, the ] (CMRL) was established as a ] between the ] and Tamil Nadu to execute the project.<ref name="FAQ"/> The ] gave in-principle approval for the project in April 2008 with the final approval by the Union Cabinet of Government of India in January 2009.<ref>{{cite news|url=http://timesofindia.indiatimes.com/Cities/Centres_nod_for_Metro_Rail_in_Chennai/articleshow/2955314.cms|title=Center nod for Metro Rail in Chennai|newspaper=]|date=16 April 2008|access-date=20 August 2010|archive-date=25 June 2008|archive-url=https://web.archive.org/web/20080625071526/http://timesofindia.indiatimes.com/Cities/Centres_nod_for_Metro_Rail_in_Chennai/articleshow/2955314.cms|url-status=live}}</ref |
The ] (DMRC) was tasked to prepare a project report on the implementation of metro system in Chennai.<ref name="P1"/> The ] approved the first phase of the project in November 2007.<ref name="FAQ">{{cite news|url=https://chennaimetrorail.org/faq/|title=Chennai Metro Rail FAQ|publisher=]|access-date=16 February 2018|archive-date=27 February 2018|archive-url=https://web.archive.org/web/20180227110901/http://chennaimetrorail.org/faq/|url-status=live}}</ref> The first phase was planned with two lines covering {{cvt|45.1|km}} with {{cvt|25|km|1}} being underground. The first corridor would connect ] with ] extending for {{cvt|23.1|km}} with {{cvt|14.3|km}} being underground and the second corridor would connect ] with ] extending for {{cvt|22|km|1}} with {{cvt|9.7|km}} being underground.<ref name="P1"/> In December 2007, the ] (CMRL) was established as a ] between the ] and Tamil Nadu to execute the project.<ref name="FAQ"/> The ] gave in-principle approval for the project in April 2008 with the final approval by the Union Cabinet of Government of India in January 2009.<ref name="FAQ"/><ref>{{cite news|url=http://timesofindia.indiatimes.com/Cities/Centres_nod_for_Metro_Rail_in_Chennai/articleshow/2955314.cms|title=Center nod for Metro Rail in Chennai|newspaper=]|date=16 April 2008|access-date=20 August 2010|archive-date=25 June 2008|archive-url=https://web.archive.org/web/20080625071526/http://timesofindia.indiatimes.com/Cities/Centres_nod_for_Metro_Rail_in_Chennai/articleshow/2955314.cms|url-status=live}}</ref> The estimated base cost of the first phase was {{INRconvert|146|b}} of which 59% was loaned by ] (JICA). The Government of India contributed 15% of the cost with the Government of Tamil Nadu financed the remaining 21% of the project.<ref name="P1"/> | ||
In February 2009, a {{INRconvert|1.99|b}} contract was awarded for the construction of a {{cvt|4.5|km}} long viaduct along the ] between ] and ] and construction started on 10 June.<ref>{{cite news|url=https://www.projectstoday.com/News/Soma-Enterprise-wins-Rs199-crore-Chennai-Metro-Rail-order|title=Soma Enterprise wins Rs.199 crore Chennai Metro Rail order|publisher=Projects Today|date=19 February 2009|access-date=16 August 2010|archive-date=28 April 2024|archive-url=https://web.archive.org/web/20240428064945/https://www.projectstoday.com/News/Soma-Enterprise-wins-Rs199-crore-Chennai-Metro-Rail-order|url-status=live}}</ref><ref>{{cite news|url=https://www.projectstoday.com/News/Work-commences-on-Chennai-metro|title=Work commences on Chennai Metro|publisher=Projects Today|date=11 June 2009|access-date=16 August 2010|archive-date=25 August 2017|archive-url=https://web.archive.org/web/20170825214006/http://www.projectstoday.com/News/Work-commences-on-Chennai-metro|url-status=live}}</ref> In March 2009, a US$30 million contract was awarded to a consortium of five companies headed by ] company ] for technical consultancy on the project.<ref>{{cite news|url=http://economictimes.indiatimes.com/News/News-By-Industry/Transportation/Another-Milestone-in-Chennai-metro-to-be-designed-French/articleshow/4250688.cms|title=Another milestone in Chennai metro to be designed by French|last=Ramesh|first=Niranjana|access-date=10 March 2009|newspaper=]|date=10 March 2009|archive-date=19 October 2016|archive-url=https://web.archive.org/web/20161019233341/http://economictimes.indiatimes.com/News/News-By-Industry/Transportation/Another-Milestone-in-Chennai-metro-to-be-designed-French/articleshow/4250688.cms|url-status=live}}</ref> In August 2010, the contract for supplying ] was awarded to ] for US$243 million.<ref>{{cite news|url=http://www.financialexpress.com/news/alstom-to-provide-2000-cars-for-chennais-metro/680434/|title=Alstom to provide 2000 cars for Chennai's metro|newspaper=]|date=11 September 2010|access-date=18 September 2010|archive-date=29 January 2023|archive-url=https://web.archive.org/web/20230129132421/http://www.financialexpress.com/news/alstom-to-provide-2000-cars-for-chennais-metro/680434/|url-status=live}}</ref><ref>{{cite press release|url= https://www.alstom.com/press-releases-news/2010/9/First-Metro-Rolling-Stock-contract-in-India-Alstom-to-provide-168-cars-for-Chennais-metro-for-243-million-20100909|title= First Metro Rolling Stock contract in India|publisher=Alstom Transport|date= 9 September 2010|access-date= 18 September 2010|archive-date= 15 April 2023|archive-url= https://web.archive.org/web/20230415155738/https://www.alstom.com/press-releases-news/2010/9/First-Metro-Rolling-Stock-contract-in-India-Alstom-to-provide-168-cars-for-Chennais-metro-for-243-million-20100909|url-status= live}}</ref> In January 2011, a joint venture between ] (L&T) and ] was awarded the contract for design and construction of track works and a depot at Koyambedu for {{INRconvert|4.49|b}}.<ref>{{cite news|url=https://www.business-standard.com/article/companies/l-t-alstom-jv-wins-chennai-metro-track-work-project-111012200037_1.html|title=L&T, Alstom JV bags Chennai Metro project|newspaper=]|access-date=14 February 2018|archive-date=10 February 2018|archive-url=https://web.archive.org/web/20180210060318/http://www.business-standard.com/article/companies/l-t-alstom-jv-wins-chennai-metro-track-work-project-111012200037_1.html|url-status=live}}</ref><ref>{{cite news|url=http://www.thehindubusinessline.in/2011/01/22/stories/2011012251870200.htm|title=L&T, Alstom venture bags Chennai Metro project|newspaper=]|date=22 January 2011|access-date=6 June 2016|archive-date=2 November 2013|archive-url=https://web.archive.org/web/20131102084444/http://www.thehindubusinessline.in/2011/01/22/stories/2011012251870200.htm|url-status=live}}</ref> |
In February 2009, a {{INRconvert|1.99|b}} contract was awarded for the construction of a {{cvt|4.5|km}} long viaduct along the ] between ] and ] and construction started on 10 June.<ref>{{cite news|url=https://www.projectstoday.com/News/Soma-Enterprise-wins-Rs199-crore-Chennai-Metro-Rail-order|title=Soma Enterprise wins Rs.199 crore Chennai Metro Rail order|publisher=Projects Today|date=19 February 2009|access-date=16 August 2010|archive-date=28 April 2024|archive-url=https://web.archive.org/web/20240428064945/https://www.projectstoday.com/News/Soma-Enterprise-wins-Rs199-crore-Chennai-Metro-Rail-order|url-status=live}}</ref><ref>{{cite news|url=https://www.projectstoday.com/News/Work-commences-on-Chennai-metro|title=Work commences on Chennai Metro|publisher=Projects Today|date=11 June 2009|access-date=16 August 2010|archive-date=25 August 2017|archive-url=https://web.archive.org/web/20170825214006/http://www.projectstoday.com/News/Work-commences-on-Chennai-metro|url-status=live}}</ref> In March 2009, a US$30 million contract was awarded to a consortium of five companies headed by ] company ] for technical consultancy on the project.<ref>{{cite news|url=http://economictimes.indiatimes.com/News/News-By-Industry/Transportation/Another-Milestone-in-Chennai-metro-to-be-designed-French/articleshow/4250688.cms|title=Another milestone in Chennai metro to be designed by French|last=Ramesh|first=Niranjana|access-date=10 March 2009|newspaper=]|date=10 March 2009|archive-date=19 October 2016|archive-url=https://web.archive.org/web/20161019233341/http://economictimes.indiatimes.com/News/News-By-Industry/Transportation/Another-Milestone-in-Chennai-metro-to-be-designed-French/articleshow/4250688.cms|url-status=live}}</ref> In August 2010, the contract for supplying ] was awarded to ] for US$243 million.<ref>{{cite news|url=http://www.financialexpress.com/news/alstom-to-provide-2000-cars-for-chennais-metro/680434/|title=Alstom to provide 2000 cars for Chennai's metro|newspaper=]|date=11 September 2010|access-date=18 September 2010|archive-date=29 January 2023|archive-url=https://web.archive.org/web/20230129132421/http://www.financialexpress.com/news/alstom-to-provide-2000-cars-for-chennais-metro/680434/|url-status=live}}</ref><ref>{{cite press release|url= https://www.alstom.com/press-releases-news/2010/9/First-Metro-Rolling-Stock-contract-in-India-Alstom-to-provide-168-cars-for-Chennais-metro-for-243-million-20100909|title= First Metro Rolling Stock contract in India|publisher=Alstom Transport|date= 9 September 2010|access-date= 18 September 2010|archive-date= 15 April 2023|archive-url= https://web.archive.org/web/20230415155738/https://www.alstom.com/press-releases-news/2010/9/First-Metro-Rolling-Stock-contract-in-India-Alstom-to-provide-168-cars-for-Chennais-metro-for-243-million-20100909|url-status= live}}</ref> In January 2011, a joint venture between ] (L&T) and ] was awarded the contract for design and construction of track works and a depot at Koyambedu for {{INRconvert|4.49|b}}.<ref>{{cite news|url=https://www.business-standard.com/article/companies/l-t-alstom-jv-wins-chennai-metro-track-work-project-111012200037_1.html|title=L&T, Alstom JV bags Chennai Metro project|newspaper=]|access-date=14 February 2018|archive-date=10 February 2018|archive-url=https://web.archive.org/web/20180210060318/http://www.business-standard.com/article/companies/l-t-alstom-jv-wins-chennai-metro-track-work-project-111012200037_1.html|url-status=live}}</ref><ref>{{cite news|url=http://www.thehindubusinessline.in/2011/01/22/stories/2011012251870200.htm|title=L&T, Alstom venture bags Chennai Metro project|newspaper=]|date=22 January 2011|access-date=6 June 2016|archive-date=2 November 2013|archive-url=https://web.archive.org/web/20131102084444/http://www.thehindubusinessline.in/2011/01/22/stories/2011012251870200.htm|url-status=live}}</ref> | ||
] | ] | ||
Contracts for the construction of underground sections of the first phase were awarded to ] and ] in February 2011.<ref>{{cite news |date=1 February 2011 |title=Two firms bag 12 underground tunnels & stations work |url=http://timesofindia.indiatimes.com/city/chennai/Two-firms-bag-12-underground-tunnels-stations-work/articleshow/7381968.cms |url-status=live |archive-url=https://web.archive.org/web/20161003062326/http://timesofindia.indiatimes.com/city/chennai/Two-firms-bag-12-underground-tunnels-stations-work/articleshow/7381968.cms |archive-date=3 October 2016 |access-date=6 June 2016 |newspaper=]}}</ref><ref>{{cite news |date=2 February 2011 |title=Gammon India bags two Chennai Metro orders worth Rs 19.47 billion |url=http://economictimes.indiatimes.com/news/news-by-industry/indl-goods-/-svs/construction/gammon-india-bags-two-chennai-metro-orders-worth-rs-3000-cr/articleshow/7555112.cms |url-status=live |archive-url=https://web.archive.org/web/20230129132418/https://economictimes.indiatimes.com/news/news-by-industry/indl-goods-/-svs/construction/gammon-india-bags-two-chennai-metro-orders-worth-rs-3000-cr/articleshow/7555112.cms |archive-date=29 January 2023 |access-date=6 June 2016 |newspaper=]}}</ref> Subsequently in June, tenders for the elevated stations of the first phase were awarded to Consolidated Construction Consortium.<ref>{{cite news|url=http://timesofindia.indiatimes.com/city/chennai/Elevated-metro-stations-to-come-up-at-10-places/articleshow/6103582.cms|title=Elevated metro stations to come up at 100 places|newspaper=]|date=29 June 2010|access-date=16 August 2010|archive-date=5 July 2010|archive-url=https://web.archive.org/web/20100705141554/http://timesofindia.indiatimes.com/city/chennai/Elevated-metro-stations-to-come-up-at-10-places/articleshow/6103582.cms|url-status=live}}</ref><ref>{{cite news|url=http://www.thehindu.com/news/cities/Chennai/article490699.ece|title=Tenders awarded for 10 Metro Rail stations|newspaper=]|date=29 June 2010|access-date=16 August 2010|archive-date=14 August 2010|archive-url=https://web.archive.org/web/20100814150134/http://www.thehindu.com/news/cities/Chennai/article490699.ece|url-status=live}}</ref> The contract for supply of lifts and escalators was awarded to a joint venture of ] and SJEC Corporation.<ref>{{cite news|title=Metro Rail awards contract for lifts|url=http://www.thehindu.com/news/cities/Chennai/article1147579.ece|newspaper=]|access-date=6 June 2016|archive-date=14 January 2016|archive-url=https://web.archive.org/web/20160114064544/http://www.thehindu.com/news/cities/Chennai/article1147579.ece|url-status=live}}</ref> The contract for power supply and overhead electrification was awarded to ] for {{INRconvert|3.05|b}} and contracts for automatic fare collection (AFC), tunnel ventilation and air conditioning were awarded to Nippon Signal, ] and ] respectively.<ref>{{cite news|title=Siemens wins power supply contract for Chennai metro|url=https://www.business-standard.com/article/companies/siemens-wins-power-supply-contract-for-chennai-metro-111022300063_1.html|newspaper=]|date=12 February 2011|access-date=6 June 2016|archive-date=18 August 2016|archive-url=https://web.archive.org/web/20160818084653/http://www.business-standard.com/article/companies/siemens-wins-power-supply-contract-for-chennai-metro-111022300063_1.html|url-status=live}}</ref><ref>{{cite news|title=Work on 'double-decker' structure at Arcot Road|url=http://www.thehindu.com/todays-paper/tp-national/tp-tamilnadu/article2448588.ece|newspaper=]|date=12 September 2011|access-date=6 June 2016|archive-date=14 January 2016|archive-url=https://web.archive.org/web/20160114064544/http://www.thehindu.com/todays-paper/tp-national/tp-tamilnadu/article2448588.ece|url-status=live}}</ref><ref>{{cite news|url=http://www.thehindu.com/news/cities/chennai/article3281618.ece|title=Plea against razing part of heritage building for Metro Rail dismissed|last=Sangameswaran|first=K. T.|date=5 April 2012|newspaper=]|access-date=7 April 2012|archive-date=7 April 2012|archive-url=https://web.archive.org/web/20120407032120/http://www.thehindu.com/news/cities/chennai/article3281618.ece|url-status=live}}</ref> In July 2012, the first ] was launched and by October that year, eleven machines were commissioned to bore tunnels by three consortia – ]-Transtonnelstroy, L&T and SUCG.<ref>{{cite news|first=T. E.|last=Raja Simhan|url=http://www.thehindubusinessline.com/industry-and-economy/logistics/chennai-metro-rail-set-for-trial-runs-between-egmore-shenoy-nagar-by-middle-of-next-year/article6439234.ece|title=Chennai Metro Rail set for trial runs between Egmore, Shenoy Nagar by middle of next year|newspaper=]|date=24 September 2014|access-date=2 October 2014|archive-date=15 February 2016|archive-url=https://web.archive.org/web/20160215081045/http://www.thehindubusinessline.com/economy/logistics/chennai-metro-rail-set-for-trial-runs-between-egmore-shenoy-nagar-by-middle-of-next-year/article6439234.ece|url-status=live}}</ref> |
Contracts for the construction of underground sections of the first phase were awarded to ] and ] in February 2011.<ref>{{cite news |date=1 February 2011 |title=Two firms bag 12 underground tunnels & stations work |url=http://timesofindia.indiatimes.com/city/chennai/Two-firms-bag-12-underground-tunnels-stations-work/articleshow/7381968.cms |url-status=live |archive-url=https://web.archive.org/web/20161003062326/http://timesofindia.indiatimes.com/city/chennai/Two-firms-bag-12-underground-tunnels-stations-work/articleshow/7381968.cms |archive-date=3 October 2016 |access-date=6 June 2016 |newspaper=]}}</ref><ref>{{cite news |date=2 February 2011 |title=Gammon India bags two Chennai Metro orders worth Rs 19.47 billion |url=http://economictimes.indiatimes.com/news/news-by-industry/indl-goods-/-svs/construction/gammon-india-bags-two-chennai-metro-orders-worth-rs-3000-cr/articleshow/7555112.cms |url-status=live |archive-url=https://web.archive.org/web/20230129132418/https://economictimes.indiatimes.com/news/news-by-industry/indl-goods-/-svs/construction/gammon-india-bags-two-chennai-metro-orders-worth-rs-3000-cr/articleshow/7555112.cms |archive-date=29 January 2023 |access-date=6 June 2016 |newspaper=]}}</ref> Subsequently in June, tenders for the elevated stations of the first phase were awarded to Consolidated Construction Consortium.<ref>{{cite news|url=http://timesofindia.indiatimes.com/city/chennai/Elevated-metro-stations-to-come-up-at-10-places/articleshow/6103582.cms|title=Elevated metro stations to come up at 100 places|newspaper=]|date=29 June 2010|access-date=16 August 2010|archive-date=5 July 2010|archive-url=https://web.archive.org/web/20100705141554/http://timesofindia.indiatimes.com/city/chennai/Elevated-metro-stations-to-come-up-at-10-places/articleshow/6103582.cms|url-status=live}}</ref><ref>{{cite news|url=http://www.thehindu.com/news/cities/Chennai/article490699.ece|title=Tenders awarded for 10 Metro Rail stations|newspaper=]|date=29 June 2010|access-date=16 August 2010|archive-date=14 August 2010|archive-url=https://web.archive.org/web/20100814150134/http://www.thehindu.com/news/cities/Chennai/article490699.ece|url-status=live}}</ref> The contract for supply of lifts and escalators was awarded to a joint venture of ] and SJEC Corporation.<ref>{{cite news|title=Metro Rail awards contract for lifts|url=http://www.thehindu.com/news/cities/Chennai/article1147579.ece|newspaper=]|access-date=6 June 2016|archive-date=14 January 2016|archive-url=https://web.archive.org/web/20160114064544/http://www.thehindu.com/news/cities/Chennai/article1147579.ece|url-status=live}}</ref> The contract for power supply and overhead electrification was awarded to ] for {{INRconvert|3.05|b}} and contracts for automatic fare collection (AFC), tunnel ventilation and air conditioning were awarded to Nippon Signal, ] and ], respectively.<ref>{{cite news|title=Siemens wins power supply contract for Chennai metro|url=https://www.business-standard.com/article/companies/siemens-wins-power-supply-contract-for-chennai-metro-111022300063_1.html|newspaper=]|date=12 February 2011|access-date=6 June 2016|archive-date=18 August 2016|archive-url=https://web.archive.org/web/20160818084653/http://www.business-standard.com/article/companies/siemens-wins-power-supply-contract-for-chennai-metro-111022300063_1.html|url-status=live}}</ref><ref>{{cite news|title=Work on 'double-decker' structure at Arcot Road|url=http://www.thehindu.com/todays-paper/tp-national/tp-tamilnadu/article2448588.ece|newspaper=]|date=12 September 2011|access-date=6 June 2016|archive-date=14 January 2016|archive-url=https://web.archive.org/web/20160114064544/http://www.thehindu.com/todays-paper/tp-national/tp-tamilnadu/article2448588.ece|url-status=live}}</ref><ref>{{cite news|url=http://www.thehindu.com/news/cities/chennai/article3281618.ece|title=Plea against razing part of heritage building for Metro Rail dismissed|last=Sangameswaran|first=K. T.|date=5 April 2012|newspaper=]|access-date=7 April 2012|archive-date=7 April 2012|archive-url=https://web.archive.org/web/20120407032120/http://www.thehindu.com/news/cities/chennai/article3281618.ece|url-status=live}}</ref> In July 2012, the first ] was launched and by October that year, eleven machines were commissioned to bore tunnels by three consortia – ]-Transtonnelstroy, L&T and SUCG.<ref>{{cite news|first=T. E.|last=Raja Simhan|url=http://www.thehindubusinessline.com/industry-and-economy/logistics/chennai-metro-rail-set-for-trial-runs-between-egmore-shenoy-nagar-by-middle-of-next-year/article6439234.ece|title=Chennai Metro Rail set for trial runs between Egmore, Shenoy Nagar by middle of next year|newspaper=]|date=24 September 2014|access-date=2 October 2014|archive-date=15 February 2016|archive-url=https://web.archive.org/web/20160215081045/http://www.thehindubusinessline.com/economy/logistics/chennai-metro-rail-set-for-trial-runs-between-egmore-shenoy-nagar-by-middle-of-next-year/article6439234.ece|url-status=live}}</ref> | ||
In August 2012, a construction worker was killed with six others seriously injured due to a crane failure near ] and on 10 January 2013, a 22-year-old construction worker was killed with three others injured at a construction site between ] and ].<ref name="GC">{{cite news|first1=K.|last1=Manikandan|first2=Meera|last2=Srinivasan|title=Girder crash kills worker at Chennai Metro Rail site|newspaper=]|date=10 January 2013|access-date=6 June 2016|url=http://www.thehindu.com/news/cities/chennai/girder-crash-kills-worker-at-chennai-metro-rail-site/article4293605.ece|archive-date=19 April 2014|archive-url=https://web.archive.org/web/20140419050930/http://www.thehindu.com/news/cities/chennai/girder-crash-kills-worker-at-chennai-metro-rail-site/article4293605.ece|url-status=live}}</ref> On 6 November 2013, a test run was conducted along a stretch of {{cvt|1|km}} track.<ref>{{cite news|url=http://www.thehindu.com/news/national/tamil-nadu/jayalalithaa-flags-off-metro-rail-test-run/article5321219.ece|title=Chennai Metro Rail Test Run|access-date=6 November 2013|date=6 November 2013|newspaper=]|first=T.|last=Ramakrishnan|archive-date=10 November 2013|archive-url=https://web.archive.org/web/20131110053702/http://www.thehindu.com/news/national/tamil-nadu/jayalalithaa-flags-off-metro-rail-test-run/article5321219.ece?|url-status=live}}</ref> The project faced several delays and missed deadlines due to problems with land acquisition and cancellation of construction contracts.<ref>{{cite news|url=https://timesofindia.indiatimes.com/city/chennai/metro-phase-i-a-hard-but-gratifying-journey/articleshow/67920962.cms|title=Metro phase I: A hard, but gratifying journey|newspaper=]|date=10 February 2019|access-date=1 June 2024|archive-date=18 March 2020|archive-url=https://web.archive.org/web/20200318033856/https://timesofindia.indiatimes.com/city/chennai/metro-phase-i-a-hard-but-gratifying-journey/articleshow/67920962.cms|url-status=live}}</ref><ref>{{cite news|url=https://www.firstpost.com/india/after-several-delays-first-phase-of-chennai-metro-rail-service-inaugurated-by-jaya-2317706.html|title=After several delays, first phase of Chennai metro rail service inaugurated by Jaya|date=29 June 2015|access-date=1 June 2024|work=]|archive-date=14 June 2021|archive-url=https://web.archive.org/web/20210614002712/https://www.firstpost.com/india/after-several-delays-first-phase-of-chennai-metro-rail-service-inaugurated-by-jaya-2317706.html|url-status=live}}</ref> On 11 January 2014, a crane toppled over, killing a 20-year-old construction worker and seriously injuring another at ].<ref>{{cite news|first=Sunitha|last=Sekar|title=Metro Rail worker dies as crane topples|newspaper=]|date=11 January 2014|access-date=1 June 2023|url=https://www.thehindu.com/news/cities/chennai/metro-rail-worker-dies-as-crane-topples/article5565679.ece|archive-date=27 April 2023|archive-url=https://web.archive.org/web/20230427070642/https://www.thehindu.com/news/cities/chennai/metro-rail-worker-dies-as-crane-topples/article5565679.ece|url-status=live}}</ref> | In August 2012, a construction worker was killed with six others seriously injured due to a crane failure near ] and on 10 January 2013, a 22-year-old construction worker was killed with three others injured at a construction site between ] and ].<ref name="GC">{{cite news|first1=K.|last1=Manikandan|first2=Meera|last2=Srinivasan|title=Girder crash kills worker at Chennai Metro Rail site|newspaper=]|date=10 January 2013|access-date=6 June 2016|url=http://www.thehindu.com/news/cities/chennai/girder-crash-kills-worker-at-chennai-metro-rail-site/article4293605.ece|archive-date=19 April 2014|archive-url=https://web.archive.org/web/20140419050930/http://www.thehindu.com/news/cities/chennai/girder-crash-kills-worker-at-chennai-metro-rail-site/article4293605.ece|url-status=live}}</ref> On 6 November 2013, a test run was conducted along a stretch of {{cvt|1|km}} track.<ref>{{cite news|url=http://www.thehindu.com/news/national/tamil-nadu/jayalalithaa-flags-off-metro-rail-test-run/article5321219.ece|title=Chennai Metro Rail Test Run|access-date=6 November 2013|date=6 November 2013|newspaper=]|first=T.|last=Ramakrishnan|archive-date=10 November 2013|archive-url=https://web.archive.org/web/20131110053702/http://www.thehindu.com/news/national/tamil-nadu/jayalalithaa-flags-off-metro-rail-test-run/article5321219.ece?|url-status=live}}</ref> The project faced several delays and missed deadlines due to problems with land acquisition and cancellation of construction contracts.<ref>{{cite news|url=https://timesofindia.indiatimes.com/city/chennai/metro-phase-i-a-hard-but-gratifying-journey/articleshow/67920962.cms|title=Metro phase I: A hard, but gratifying journey|newspaper=]|date=10 February 2019|access-date=1 June 2024|archive-date=18 March 2020|archive-url=https://web.archive.org/web/20200318033856/https://timesofindia.indiatimes.com/city/chennai/metro-phase-i-a-hard-but-gratifying-journey/articleshow/67920962.cms|url-status=live}}</ref><ref>{{cite news|url=https://www.firstpost.com/india/after-several-delays-first-phase-of-chennai-metro-rail-service-inaugurated-by-jaya-2317706.html|title=After several delays, first phase of Chennai metro rail service inaugurated by Jaya|date=29 June 2015|access-date=1 June 2024|work=]|archive-date=14 June 2021|archive-url=https://web.archive.org/web/20210614002712/https://www.firstpost.com/india/after-several-delays-first-phase-of-chennai-metro-rail-service-inaugurated-by-jaya-2317706.html|url-status=live}}</ref> On 11 January 2014, a crane toppled over, killing a 20-year-old construction worker and seriously injuring another at ].<ref>{{cite news|first=Sunitha|last=Sekar|title=Metro Rail worker dies as crane topples|newspaper=]|date=11 January 2014|access-date=1 June 2023|url=https://www.thehindu.com/news/cities/chennai/metro-rail-worker-dies-as-crane-topples/article5565679.ece|archive-date=27 April 2023|archive-url=https://web.archive.org/web/20230427070642/https://www.thehindu.com/news/cities/chennai/metro-rail-worker-dies-as-crane-topples/article5565679.ece|url-status=live}}</ref> | ||
Line 94: | Line 94: | ||
|14 October 2016 | |14 October 2016 | ||
|- | |- | ||
|] | |||
|Thirumanglam | |||
|] | |] | ||
|style="text-align:center"|7 | |style="text-align:center"|7 | ||
Line 120: | Line 120: | ||
|10 February 2019 | |10 February 2019 | ||
|} | |} | ||
==== Phase I Extension ==== | ==== Phase I Extension ==== | ||
A {{cvt|9|km}} northern extension of the blue line was announced in 2014 by the Government of Tamil Nadu. The extension would run from Washermanpet to ] and consist of nine stations.<ref>{{cite news|url=https://www.thehindu.com/news/cities/chennai/chen-infra/chennai-metro-adds-a-station-to-phase1-extension/article6545625.ece|title=Chennai Metro adds a station to phase-1 extension|newspaper=]|date=30 October 2014|access-date=1 June 2024|archive-date=14 January 2016|archive-url=https://web.archive.org/web/20160114064544/http://www.thehindu.com/news/cities/chennai/chen-infra/chennai-metro-adds-a-station-to-phase1-extension/article6545625.ece|url-status=live}}</ref><ref>{{cite news|date=6 December 2018|title=Track work in Metro phase 1 extension to begin soon|newspaper=]|url=https://www.thehindu.com/news/cities/chennai/track-work-in-metro-phase-1-extension-to-begin-soon/article25675477.ece/amp/|access-date=6 November 2019|archive-date=26 February 2020|archive-url=https://web.archive.org/web/20200226001622/https://www.thehindu.com/news/cities/chennai/track-work-in-metro-phase-1-extension-to-begin-soon/article25675477.ece/amp/|url-status=live}}</ref><ref>{{cite news|date=19 October 2019|title=First set of trains for Chennai metro phase 1 extension flagged-off|newspaper=]|url=https://www.thehindubusinessline.com/economy/logistics/first-set-of-trains-for-chennai-metro-phase-1-extension-flagged-off/article29745129.ece/amp/|access-date=6 November 2019|archive-date=5 November 2019|archive-url=https://web.archive.org/web/20191105190355/https://www.thehindubusinessline.com/economy/logistics/first-set-of-trains-for-chennai-metro-phase-1-extension-flagged-off/article29745129.ece/amp/|url-status=live}}</ref> Construction started in July 2016 with trial runs in December 2020.<ref>{{cite news|title=Opening of phase-1 Chennai metro extension stretch to be delayed?|url=https://www.newindianexpress.com/cities/chennai/2021/jan/09/opening-of-phase-1-chennai-metro-extension-stretch-to-be-delayed-2247523.html|access-date=9 January 2021|newspaper=]|archive-date=9 January 2021|archive-url=https://web.archive.org/web/20210109074440/https://www.newindianexpress.com/cities/chennai/2021/jan/09/opening-of-phase-1-chennai-metro-extension-stretch-to-be-delayed-2247523.html|url-status=live}}</ref><ref>{{cite news|date=26 December 2020|title=Chennai: Trial run between Washermanpet and Wimco Nagar Metro stations successful, says CMRL|url=https://indianexpress.com/article/cities/chennai/chennai-trial-run-between-washermanpet-and-wimco-nagar-metro-stations-successful-says-cmrl-7121217/|access-date=26 December 2020|newspaper=]|language=en|archive-date=26 December 2020|archive-url=https://web.archive.org/web/20201226141406/https://indianexpress.com/article/cities/chennai/chennai-trial-run-between-washermanpet-and-wimco-nagar-metro-stations-successful-says-cmrl-7121217/|url-status=live}}</ref> The line opened for passenger traffic on 14 February 2021, increasing the length of the operational metro system to {{cvt|54.1|km|abbr=on|2}}.<ref name="Proj">{{cite web|url=https://chennaimetrorail.org/project-status/|title=Project status of Chennai Metro|publisher=]|access-date=16 August 2010|archive-date=26 September 2016|archive-url=https://web.archive.org/web/20160926171710/http://chennaimetrorail.org/project-status/|url-status=live}}</ref> The expansion costed {{INRconvert|37.7|b}} of which 57% was loaned by Japan.<ref name="Proj"/> | A {{cvt|9|km}} northern extension of the blue line was announced in 2014 by the Government of Tamil Nadu. The extension would run from Washermanpet to ] and consist of nine stations.<ref>{{cite news|url=https://www.thehindu.com/news/cities/chennai/chen-infra/chennai-metro-adds-a-station-to-phase1-extension/article6545625.ece|title=Chennai Metro adds a station to phase-1 extension|newspaper=]|date=30 October 2014|access-date=1 June 2024|archive-date=14 January 2016|archive-url=https://web.archive.org/web/20160114064544/http://www.thehindu.com/news/cities/chennai/chen-infra/chennai-metro-adds-a-station-to-phase1-extension/article6545625.ece|url-status=live}}</ref><ref>{{cite news|date=6 December 2018|title=Track work in Metro phase 1 extension to begin soon|newspaper=]|url=https://www.thehindu.com/news/cities/chennai/track-work-in-metro-phase-1-extension-to-begin-soon/article25675477.ece/amp/|access-date=6 November 2019|archive-date=26 February 2020|archive-url=https://web.archive.org/web/20200226001622/https://www.thehindu.com/news/cities/chennai/track-work-in-metro-phase-1-extension-to-begin-soon/article25675477.ece/amp/|url-status=live}}</ref><ref>{{cite news|date=19 October 2019|title=First set of trains for Chennai metro phase 1 extension flagged-off|newspaper=]|url=https://www.thehindubusinessline.com/economy/logistics/first-set-of-trains-for-chennai-metro-phase-1-extension-flagged-off/article29745129.ece/amp/|access-date=6 November 2019|archive-date=5 November 2019|archive-url=https://web.archive.org/web/20191105190355/https://www.thehindubusinessline.com/economy/logistics/first-set-of-trains-for-chennai-metro-phase-1-extension-flagged-off/article29745129.ece/amp/|url-status=live}}</ref> Construction started in July 2016 with trial runs in December 2020.<ref>{{cite news|title=Opening of phase-1 Chennai metro extension stretch to be delayed?|url=https://www.newindianexpress.com/cities/chennai/2021/jan/09/opening-of-phase-1-chennai-metro-extension-stretch-to-be-delayed-2247523.html|access-date=9 January 2021|newspaper=]|archive-date=9 January 2021|archive-url=https://web.archive.org/web/20210109074440/https://www.newindianexpress.com/cities/chennai/2021/jan/09/opening-of-phase-1-chennai-metro-extension-stretch-to-be-delayed-2247523.html|url-status=live}}</ref><ref>{{cite news|date=26 December 2020|title=Chennai: Trial run between Washermanpet and Wimco Nagar Metro stations successful, says CMRL|url=https://indianexpress.com/article/cities/chennai/chennai-trial-run-between-washermanpet-and-wimco-nagar-metro-stations-successful-says-cmrl-7121217/|access-date=26 December 2020|newspaper=]|language=en|archive-date=26 December 2020|archive-url=https://web.archive.org/web/20201226141406/https://indianexpress.com/article/cities/chennai/chennai-trial-run-between-washermanpet-and-wimco-nagar-metro-stations-successful-says-cmrl-7121217/|url-status=live}}</ref> The line opened for passenger traffic on 14 February 2021, increasing the length of the operational metro system to {{cvt|54.1|km|abbr=on|2}}.<ref name="Proj">{{cite web|url=https://chennaimetrorail.org/project-status/|title=Project status of Chennai Metro|publisher=]|access-date=16 August 2010|archive-date=26 September 2016|archive-url=https://web.archive.org/web/20160926171710/http://chennaimetrorail.org/project-status/|url-status=live}}</ref> The expansion costed {{INRconvert|37.7|b}} of which 57% was loaned by Japan.<ref name="Proj"/> | ||
Line 201: | Line 201: | ||
==== Phase II Extension ==== | ==== Phase II Extension ==== | ||
In 2022, the state government proposed an extension plan spanning {{cvt|93|km}} for the three under construction lines of the second phase. The proposal involved extension of ] from Siruseri SIPCOT to Kilambakkam, ] from Poonamallee to ] and ] from Koyambedu to ].<ref name="P2">{{cite news|url=https://www.thehindu.com/news/cities/chennai/detailed-feasibility-report-for-chennai-metro-rails-phase-2-extension-to-be-ready-in-three-months/article66664484.ece|title=Detailed feasibility report for Chennai Metro Rail's Phase 2 extension to be ready in three months|date=26 March 2023|newspaper=]|access-date=1 December 2023|archive-date=28 April 2024|archive-url=https://web.archive.org/web/20240428075613/https://www.thehindu.com/news/cities/chennai/detailed-feasibility-report-for-chennai-metro-rails-phase-2-extension-to-be-ready-in-three-months/article66664484.ece|url-status=live}}</ref> The proposed extension of second phase lines from Siruseri to Kilambakkam, Poonamallee to Parandur, and Koyambedu to Avadi were projected to cost {{INRconvert|54.58|b}}, {{INRconvert|107.12|b}}, and {{INRconvert|67.36|b}} respectively.<ref name="FE"/><ref name="PP"/> Between late 2023 and early 2024, feasibility reports submitted by the CMRL suggested dropping the proposed extension of the purple line due to economic viability and going ahead with the planned extensions of the other two lines, spanning {{cvt|59.7|km}}.<ref name="FE">{{cite news|url=https://www.financialexpress.com/business/infrastructure-chennai-metro-cmrl-submits-detailed-feasibility-reports-for-phase-ii-project-extension-a-progress-report-3251256/|title=CMRL submits Detailed Feasibility Reports for Phase II project extension|newspaper=]|date=22 September 2023|access-date=30 April 2024|archive-date=29 April 2024|archive-url=https://web.archive.org/web/20240429192946/https://www.financialexpress.com/business/infrastructure-chennai-metro-cmrl-submits-detailed-feasibility-reports-for-phase-ii-project-extension-a-progress-report-3251256/|url-status=live}}</ref><ref name="PP">{{cite news|url=https://www.thehindu.com/news/cities/chennai/chennai-metro-rail-submits-report-to-extend-connectivity-all-the-way-to-second-airport-site-at-parandur/article67706729.ece|title=Chennai Metro Rail submits report to extend connectivity all the way to second airport site at Parandur|newspaper=]|date=4 January 2024|access-date=30 April 2024|archive-date=30 April 2024|archive-url=https://web.archive.org/web/20240430052229/https://www.thehindu.com/news/cities/chennai/chennai-metro-rail-submits-report-to-extend-connectivity-all-the-way-to-second-airport-site-at-parandur/article67706729.ece|url-status=live}}</ref><ref>{{cite news|url=https://www.timesnownews.com/chennai/chennai-siruseri-kilambakkam-bus-terminus-metro-plans-dropped-deemed-non-feasible-article-109979552|title=Metro from Siruseri- Kilambakkam Bus Terminus Metro Plans Dropped, deemed non-feasible|newspaper=]|date=9 May 2024|access-date=11 May 2024|archive-date=11 May 2024|archive-url=https://web.archive.org/web/20240511082443/https://www.timesnownews.com/chennai/chennai-siruseri-kilambakkam-bus-terminus-metro-plans-dropped-deemed-non-feasible-article-109979552|url-status=live}}</ref> In May 2024, the state government proposed a new {{cvt|16|km}} extension from Madhavaram to ].<ref name="En1"/><ref name="En2"/> In August 2024, another new extension from ] to Poonamallee was proposed by CMRL with the aim of connecting the existing airport with the upcoming new airport at Parandur by metro.<ref name="AP1">{{cite news|url=https://timesofindia.indiatimes.com/city/chennai/meenambakkam-to-parandur-airport-metro-connection/articleshow/112357915.cms|title=Meenambakkam to Parandur airport in 1 hour by metro|newspaper=]|date=8 August 2024|access-date=9 August 2024 |
In 2022, the state government proposed an extension plan spanning {{cvt|93|km}} for the three under construction lines of the second phase. The proposal involved extension of ] from Siruseri SIPCOT to Kilambakkam, ] from Poonamallee to ] and ] from Koyambedu to ].<ref name="P2">{{cite news|url=https://www.thehindu.com/news/cities/chennai/detailed-feasibility-report-for-chennai-metro-rails-phase-2-extension-to-be-ready-in-three-months/article66664484.ece|title=Detailed feasibility report for Chennai Metro Rail's Phase 2 extension to be ready in three months|date=26 March 2023|newspaper=]|access-date=1 December 2023|archive-date=28 April 2024|archive-url=https://web.archive.org/web/20240428075613/https://www.thehindu.com/news/cities/chennai/detailed-feasibility-report-for-chennai-metro-rails-phase-2-extension-to-be-ready-in-three-months/article66664484.ece|url-status=live}}</ref> The proposed extension of second phase lines from Siruseri to Kilambakkam, Poonamallee to Parandur, and Koyambedu to Avadi were projected to cost {{INRconvert|54.58|b}}, {{INRconvert|107.12|b}}, and {{INRconvert|67.36|b}}, respectively.<ref name="FE"/><ref name="PP"/> Between late 2023 and early 2024, feasibility reports submitted by the CMRL suggested dropping the proposed extension of the purple line due to economic viability and going ahead with the planned extensions of the other two lines, spanning {{cvt|59.7|km}}.<ref name="FE">{{cite news|url=https://www.financialexpress.com/business/infrastructure-chennai-metro-cmrl-submits-detailed-feasibility-reports-for-phase-ii-project-extension-a-progress-report-3251256/|title=CMRL submits Detailed Feasibility Reports for Phase II project extension|newspaper=]|date=22 September 2023|access-date=30 April 2024|archive-date=29 April 2024|archive-url=https://web.archive.org/web/20240429192946/https://www.financialexpress.com/business/infrastructure-chennai-metro-cmrl-submits-detailed-feasibility-reports-for-phase-ii-project-extension-a-progress-report-3251256/|url-status=live}}</ref><ref name="PP">{{cite news|url=https://www.thehindu.com/news/cities/chennai/chennai-metro-rail-submits-report-to-extend-connectivity-all-the-way-to-second-airport-site-at-parandur/article67706729.ece|title=Chennai Metro Rail submits report to extend connectivity all the way to second airport site at Parandur|newspaper=]|date=4 January 2024|access-date=30 April 2024|archive-date=30 April 2024|archive-url=https://web.archive.org/web/20240430052229/https://www.thehindu.com/news/cities/chennai/chennai-metro-rail-submits-report-to-extend-connectivity-all-the-way-to-second-airport-site-at-parandur/article67706729.ece|url-status=live}}</ref><ref>{{cite news|url=https://www.timesnownews.com/chennai/chennai-siruseri-kilambakkam-bus-terminus-metro-plans-dropped-deemed-non-feasible-article-109979552|title=Metro from Siruseri- Kilambakkam Bus Terminus Metro Plans Dropped, deemed non-feasible|newspaper=]|date=9 May 2024|access-date=11 May 2024|archive-date=11 May 2024|archive-url=https://web.archive.org/web/20240511082443/https://www.timesnownews.com/chennai/chennai-siruseri-kilambakkam-bus-terminus-metro-plans-dropped-deemed-non-feasible-article-109979552|url-status=live}}</ref> In May 2024, the state government proposed a new {{cvt|16|km}} extension from Madhavaram to ].<ref name="En1"/><ref name="En2"/> In August 2024, another new extension from ] to Poonamallee was proposed by CMRL with the aim of connecting the existing airport with the upcoming new airport at Parandur by metro.<ref name="AP1">{{cite news|url=https://timesofindia.indiatimes.com/city/chennai/meenambakkam-to-parandur-airport-metro-connection/articleshow/112357915.cms|title=Meenambakkam to Parandur airport in 1 hour by metro|newspaper=]|date=8 August 2024|access-date=9 August 2024}}</ref><ref name="AP2">{{cite news|url=https://www.timesnownews.com/chennai/chennai-metro-to-cut-travel-time-from-meenambakkam-to-parandur-airport-to-just-1-hour-details-article-112367681|title=Chennai Metro to cut travel time from Meenambakkam to Parandur airport to just 1 hour|newspaper=]|date=8 August 2024|access-date=9 August 2024}}</ref> | ||
{|class="wikitable sortable" style="text-align:left; font-size:90%;" | {|class="wikitable sortable" style="text-align:left; font-size:90%;" | ||
Line 214: | Line 214: | ||
! Reference | ! Reference | ||
|- | |- | ||
|style="background:#ff6600;|] |
|style="background:#ff6600;|] | ||
|{{stl|Chennai Metro|Poonamallee Bypass}} | |{{stl|Chennai Metro|Poonamallee Bypass}} | ||
|] | |] | ||
Line 221: | Line 221: | ||
|style="text-align:center;"|19 | |style="text-align:center;"|19 | ||
|rowspan="2"|{{tooltip|DPR|Detailed Project Report}} under preparation | |rowspan="2"|{{tooltip|DPR|Detailed Project Report}} under preparation | ||
|<ref name="P2"/><ref name="PP"/><ref>{{cite news|url=https://timesofindia.indiatimes.com/city/chennai/dpr-for-parandur-metro-line-to-be-ready-by-nov/articleshow/112047292.cms|title=DPR for Parandur metro line to be ready by November|work=]|date=26 July 2024|access-date=9 August 2024 |
|<ref name="P2"/><ref name="PP"/><ref>{{cite news|url=https://timesofindia.indiatimes.com/city/chennai/dpr-for-parandur-metro-line-to-be-ready-by-nov/articleshow/112047292.cms|title=DPR for Parandur metro line to be ready by November|work=]|date=26 July 2024|access-date=9 August 2024}}</ref> | ||
|- | |- | ||
|style="background:#ff0000;|] |
|style="background:#ff0000;|] | ||
|{{stl|Chennai Metro|Koyambedu}} | |{{stl|Chennai Metro|Koyambedu}} | ||
|] | |] | ||
|Mogappair, Ambattur |
|Mogappair, Ambattur | ||
|style="text-align:center;"|{{cvt|16.1|km}} | |style="text-align:center;"|{{cvt|16.1|km}} | ||
|style="text-align:center;"|15 | |style="text-align:center;"|15 | ||
|<ref name="P2"/><ref name="FE"/><ref>{{cite news|url=https://timesofindia.indiatimes.com/city/chennai/koyambedu-to-avadi-metro-project-report-by-nov/articleshow/112179121.cms|title=Koyambedu to Avadi Metro project report by November|newspaper=]|date=1 August 2024|access-date=9 August 2024 |
|<ref name="P2"/><ref name="FE"/><ref>{{cite news|url=https://timesofindia.indiatimes.com/city/chennai/koyambedu-to-avadi-metro-project-report-by-nov/articleshow/112179121.cms|title=Koyambedu to Avadi Metro project report by November|newspaper=]|date=1 August 2024|access-date=9 August 2024}}</ref> | ||
|- | |- | ||
|TBD | |TBD | ||
Line 272: | Line 272: | ||
|rowspan="2"|] | |rowspan="2"|] | ||
|] | |] | ||
|] |
|] | ||
|style="text-align:center;"|{{cvt|20|km}} | |style="text-align:center;"|{{cvt|20|km}} | ||
|style="text-align:center;" rowspan="2"|TBD | |style="text-align:center;" rowspan="2"|TBD | ||
|rowspan="2"|{{tooltip|DFR|Detailed Feasibility Report}} to be re-assessed and prepared |
|rowspan="2"|{{tooltip|DFR|Detailed Feasibility Report}} to be re-assessed and prepared | ||
|rowspan="2"|<ref name="MR"/><ref name="ML"/> | |rowspan="2"|<ref name="MR"/><ref name="ML"/> | ||
|- | |- | ||
|] | |] | ||
|] |
|] | ||
|style="text-align:center;"|{{cvt|3|km}} | |style="text-align:center;"|{{cvt|3|km}} | ||
|} | |} | ||
Line 288: | Line 288: | ||
== Infrastructure == | == Infrastructure == | ||
=== Network and lines === | === Network and lines === | ||
{{Rapid transit OSM map|system_qid=Q1639576|frame-align=right|single_line=y|stations=y|stations_qid=Q1639576|zoom=11|frame-width=300|frame-height=350}} | |||
Chennai Metro runs on {{Railgauge|standard|allk=on}} and the lines are double-tracked.<ref>{{cite news|last=Srinivasan|first=Meera|title=Countdown to Chennai Metro begins|newspaper=]|date=3 February 2013|url=http://www.thehindu.com/news/cities/chennai/countdown-to-chennai-metro-begins/article4373153.ece|access-date=3 February 2013|archive-date=5 February 2013|archive-url=https://web.archive.org/web/20130205052657/http://www.thehindu.com/news/cities/chennai/countdown-to-chennai-metro-begins/article4373153.ece?|url-status=live}}</ref> The average operational speed is {{cvt|85|km/h}} with a maximum speed of {{cvt|120|km/h}}.<ref>{{cite news|url=http://www.thehindu.com/news/cities/chennai/metro-rail-train-zips-over-city-roads/article5690361.ece|title=Metro rail train zips over city roads|newspaper=]|access-date=1 December 2023|date=6 June 2016|archive-date=26 October 2023|archive-url=https://web.archive.org/web/20231026221155/https://www.thehindu.com/news/cities/chennai/metro-rail-train-zips-over-city-roads/article5690361.ece|url-status=live}}</ref> | Chennai Metro runs on {{Railgauge|standard|allk=on}} and the lines are double-tracked.<ref>{{cite news|last=Srinivasan|first=Meera|title=Countdown to Chennai Metro begins|newspaper=]|date=3 February 2013|url=http://www.thehindu.com/news/cities/chennai/countdown-to-chennai-metro-begins/article4373153.ece|access-date=3 February 2013|archive-date=5 February 2013|archive-url=https://web.archive.org/web/20130205052657/http://www.thehindu.com/news/cities/chennai/countdown-to-chennai-metro-begins/article4373153.ece?|url-status=live}}</ref> The average operational speed is {{cvt|85|km/h}} with a maximum speed of {{cvt|120|km/h}}.<ref>{{cite news|url=http://www.thehindu.com/news/cities/chennai/metro-rail-train-zips-over-city-roads/article5690361.ece|title=Metro rail train zips over city roads|newspaper=]|access-date=1 December 2023|date=6 June 2016|archive-date=26 October 2023|archive-url=https://web.archive.org/web/20231026221155/https://www.thehindu.com/news/cities/chennai/metro-rail-train-zips-over-city-roads/article5690361.ece|url-status=live}}</ref> | ||
As of March 2024, the operational network consists of two colour-coded lines covering a length of 54.1 km (33.6 mi).<ref name="Proj"/><ref>{{cite news|date=5 November 2016|title=CMRL Phase 1 extension Washermanpet and Wimco nagar|url=https://chennaimetrorail.org/part-1-ecv-103-cmrl-phase-1-extension-washermanpet-and-wimco-nagar/|access-date=7 July 2021|publisher=]|archive-date=25 July 2021|archive-url=https://web.archive.org/web/20210725082803/https://chennaimetrorail.org/part-1-ecv-103-cmrl-phase-1-extension-washermanpet-and-wimco-nagar/|url-status=live}}</ref> |
As of March 2024, the operational network consists of two colour-coded lines covering a length of 54.1 km (33.6 mi).<ref name="Proj"/><ref>{{cite news|date=5 November 2016|title=CMRL Phase 1 extension Washermanpet and Wimco nagar|url=https://chennaimetrorail.org/part-1-ecv-103-cmrl-phase-1-extension-washermanpet-and-wimco-nagar/|access-date=7 July 2021|publisher=]|archive-date=25 July 2021|archive-url=https://web.archive.org/web/20210725082803/https://chennaimetrorail.org/part-1-ecv-103-cmrl-phase-1-extension-washermanpet-and-wimco-nagar/|url-status=live}}</ref> | ||
{|class="wikitable sortable" style="text-align:left; font-size:90%;" | {|class="wikitable sortable" style="text-align:left; font-size:90%;" | ||
Line 330: | Line 331: | ||
] installed in Chennai Metro's underground ]]] | ] installed in Chennai Metro's underground ]]] | ||
A total of 40 stations, 22 of which are underground, are operational on the two existing lines of Phase 1. In the underground sections, a walkway runs along the length with cross passages every {{cvt|250|m}} for the maintenance and emergency evacuation.<ref>{{cite news|last=Sekar|first=Sunitha|title=First underground Metro network by December 2015|newspaper=]|date=10 August 2014|url=http://www.thehindu.com/news/cities/chennai/first-underground-metro-network-by-dec-2015/article6299711.ece|access-date=4 October 2014|archive-date=15 February 2016|archive-url=https://web.archive.org/web/20160215081044/http://www.thehindu.com/news/cities/chennai/first-underground-metro-network-by-dec-2015/article6299711.ece|url-status=live}}</ref> The underground stations have an average width of {{cvt|200|m}} and average depth of {{cvt|20|ft|order=flip}} from the ground level.<ref>{{cite web|url=https://chennaimetrorail.org/wp-content/uploads/2015/11/TimesofIndia20-09-2013.pdf|title=Metro's underground frame|publisher=]|date=20 September 2013|access-date=1 December 2023|archive-date=26 December 2023|archive-url=https://web.archive.org/web/20231226092603/https://chennaimetrorail.org/wp-content/uploads/2015/11/TimesofIndia20-09-2013.pdf|url-status=live}}</ref> The length of the stations in Phase 1 extension is {{cvt|180|m}}.<ref>{{cite news|title=Metro Phase 1 extension tunneling nears completion|newspaper=]|access-date=29 September 2017|date=25 September 2017|url=http://www.thehindu.com/news/cities/chennai/metro-phase-1-extension-tunnelling-nears-completion/article19748619.ece|archive-date=26 February 2020|archive-url=https://web.archive.org/web/20200226060704/http://www.thehindu.com/news/cities/chennai/metro-phase-1-extension-tunnelling-nears-completion/article19748619.ece|url-status=live}}</ref><ref>{{cite news|title=CMRL's compact stations have their own fan club|newspaper=]|location=Chennai|date=29 June 2018|url=https://www.thehindu.com/news/cities/chennai/cmrls-compact-stations-have-their-own-fan-club/article24283329.ece|access-date=15 July 2018|archive-date=30 January 2020|archive-url=https://web.archive.org/web/20200130025132/https://www.thehindu.com/news/cities/chennai/cmrls-compact-stations-have-their-own-fan-club/article24283329.ece|url-status=live}}</ref> |
A total of 40 stations, 22 of which are underground, are operational on the two existing lines of Phase 1. In the underground sections, a walkway runs along the length with cross passages every {{cvt|250|m}} for the maintenance and emergency evacuation.<ref>{{cite news|last=Sekar|first=Sunitha|title=First underground Metro network by December 2015|newspaper=]|date=10 August 2014|url=http://www.thehindu.com/news/cities/chennai/first-underground-metro-network-by-dec-2015/article6299711.ece|access-date=4 October 2014|archive-date=15 February 2016|archive-url=https://web.archive.org/web/20160215081044/http://www.thehindu.com/news/cities/chennai/first-underground-metro-network-by-dec-2015/article6299711.ece|url-status=live}}</ref> The underground stations have an average width of {{cvt|200|m}} and average depth of {{cvt|20|ft|order=flip}} from the ground level.<ref>{{cite web|url=https://chennaimetrorail.org/wp-content/uploads/2015/11/TimesofIndia20-09-2013.pdf|title=Metro's underground frame|publisher=]|date=20 September 2013|access-date=1 December 2023|archive-date=26 December 2023|archive-url=https://web.archive.org/web/20231226092603/https://chennaimetrorail.org/wp-content/uploads/2015/11/TimesofIndia20-09-2013.pdf|url-status=live}}</ref> The length of the stations in Phase 1 extension is {{cvt|180|m}}.<ref>{{cite news|title=Metro Phase 1 extension tunneling nears completion|newspaper=]|access-date=29 September 2017|date=25 September 2017|url=http://www.thehindu.com/news/cities/chennai/metro-phase-1-extension-tunnelling-nears-completion/article19748619.ece|archive-date=26 February 2020|archive-url=https://web.archive.org/web/20200226060704/http://www.thehindu.com/news/cities/chennai/metro-phase-1-extension-tunnelling-nears-completion/article19748619.ece|url-status=live}}</ref><ref>{{cite news|title=CMRL's compact stations have their own fan club|newspaper=]|location=Chennai|date=29 June 2018|url=https://www.thehindu.com/news/cities/chennai/cmrls-compact-stations-have-their-own-fan-club/article24283329.ece|access-date=15 July 2018|archive-date=30 January 2020|archive-url=https://web.archive.org/web/20200130025132/https://www.thehindu.com/news/cities/chennai/cmrls-compact-stations-have-their-own-fan-club/article24283329.ece|url-status=live}}</ref> | ||
The elevated stations have three levels with the concourse level at a minimum height of {{cvt|5.5|m}} above the ground level and platform level above the concourse while the underground stations have two levels with ].<ref>{{cite report|title=Chennai Metro Investment Project|publisher=]|access-date=30 August 2023|url=https://www.adb.org/sites/default/files/project-documents/52234/52234-001-eia-en_5.pdf|archive-date=4 June 2023|archive-url=https://web.archive.org/web/20230604155819/https://www.adb.org/sites/default/files/project-documents/52234/52234-001-eia-en_5.pdf|url-status=live}}</ref> The stations are air-conditioned and are equipped to be disabled and elderly friendly, with automated fare collection, public announcement system, electronic display boards, escalators and lifts.<ref>{{cite news|last=Sekar|first=Sunitha|title=No clarity on access at Chennai Metro stations yet, say disabled|newspaper=]|access-date=6 June 2016|date=20 January 2014|url=http://www.thehindu.com/news/cities/chennai/no-clarity-on-access-at-chennai-metro-stations-yet-say-disabled/article5594316.ece?ref=sliderNews|archive-date=4 February 2014|archive-url=https://web.archive.org/web/20140204020014/http://www.thehindu.com/news/cities/chennai/no-clarity-on-access-at-chennai-metro-stations-yet-say-disabled/article5594316.ece?ref=sliderNews|url-status=live}}</ref> Paid parking facilities are available for two wheelers in most stations and four wheelers in select stations.<ref>{{cite report|url=https://chennaimetrorail.org/wp-content/uploads/2018/06/Parking_Facilities_Availability_2018.pdf|title=Parking Facilities Availability 2018|publisher=]|access-date=16 August 2010|archive-date=8 June 2019|archive-url=https://web.archive.org/web/20190608150016/https://chennaimetrorail.org/wp-content/uploads/2018/06/Parking_Facilities_Availability_2018.pdf|url-status=live}}</ref> | The elevated stations have three levels with the concourse level at a minimum height of {{cvt|5.5|m}} above the ground level and platform level above the concourse while the underground stations have two levels with ].<ref>{{cite report|title=Chennai Metro Investment Project|publisher=]|access-date=30 August 2023|url=https://www.adb.org/sites/default/files/project-documents/52234/52234-001-eia-en_5.pdf|archive-date=4 June 2023|archive-url=https://web.archive.org/web/20230604155819/https://www.adb.org/sites/default/files/project-documents/52234/52234-001-eia-en_5.pdf|url-status=live}}</ref> The stations are air-conditioned and are equipped to be disabled and elderly friendly, with automated fare collection, public announcement system, electronic display boards, escalators and lifts.<ref>{{cite news|last=Sekar|first=Sunitha|title=No clarity on access at Chennai Metro stations yet, say disabled|newspaper=]|access-date=6 June 2016|date=20 January 2014|url=http://www.thehindu.com/news/cities/chennai/no-clarity-on-access-at-chennai-metro-stations-yet-say-disabled/article5594316.ece?ref=sliderNews|archive-date=4 February 2014|archive-url=https://web.archive.org/web/20140204020014/http://www.thehindu.com/news/cities/chennai/no-clarity-on-access-at-chennai-metro-stations-yet-say-disabled/article5594316.ece?ref=sliderNews|url-status=live}}</ref> Paid parking facilities are available for two wheelers in most stations and four wheelers in select stations.<ref>{{cite report|url=https://chennaimetrorail.org/wp-content/uploads/2018/06/Parking_Facilities_Availability_2018.pdf|title=Parking Facilities Availability 2018|publisher=]|access-date=16 August 2010|archive-date=8 June 2019|archive-url=https://web.archive.org/web/20190608150016/https://chennaimetrorail.org/wp-content/uploads/2018/06/Parking_Facilities_Availability_2018.pdf|url-status=live}}</ref> | ||
=== Depots === | === Depots === | ||
Chennai Metro maintains a major depot at ] covering an area of {{cvt|26|ha|abbr=on}} which houses maintenance workshops, stabling lines, test tracks and a washing plant for the trains.<ref>{{cite news|last=Sekar|first=Sunitha|date=5 September 2017|title=CMRL takes the fight to birds|newspaper=]|url=http://www.thehindu.com/news/cities/chennai/cmrl-takes-the-fight-to-birds/article19621926.ece|access-date=30 September 2017|archive-date=6 September 2017|archive-url=https://web.archive.org/web/20170906213230/http://www.thehindu.com/news/cities/chennai/cmrl-takes-the-fight-to-birds/article19621926.ece|url-status=live}}</ref><ref>{{cite news|last=Sekar|first=Sunitha|date=16 July 2014|title=Chennai Metro to get a second depot|newspaper=]|url=http://www.thehindu.com/todays-paper/tp-national/tp-tamilnadu/chennai-metro-to-get-a-second-depot/article6215042.ece|access-date=4 October 2014|archive-date=15 February 2016|archive-url=https://web.archive.org/web/20160215081044/http://www.thehindu.com/todays-paper/tp-national/tp-tamilnadu/chennai-metro-to-get-a-second-depot/article6215042.ece|url-status=live}}</ref> In 2022, an elevated depot at Wimco Nagar, covering an area of {{cvt|3.5|ha}}, commenced operations with facilities for inspection, emergency repair, and a washing plant.<ref>{{cite news|last=Sekar|first=Sunitha|date=5 May 2018|title=Metro Rail extension gathers pace|newspaper=]|url=http://www.thehindu.com/todays-paper/tp-national/tp-tamilnadu/metro-rail-extension-gathers-pace/article23778585.ece|access-date=12 May 2018|archive-date=26 February 2020|archive-url=https://web.archive.org/web/20200226061426/http://www.thehindu.com/todays-paper/tp-national/tp-tamilnadu/metro-rail-extension-gathers-pace/article23778585.ece|url-status=live}}</ref> A new depot is planned at Madhavaram a part of the second phase.<ref>{{cite press release|url=https://chennaimetrorail.org/wp-content/uploads/2023/07/Press-Release-20.07.2023-English.pdf|title=Contract Agreement Signed for construction of Operation Control Centre at Madhavaram Depot of CMRL Phase II|date=20 July 2023|access-date=1 May 2024|publisher=]}}</ref> | Chennai Metro maintains a major depot at ] covering an area of {{cvt|26|ha|abbr=on}} which houses maintenance workshops, stabling lines, test tracks and a washing plant for the trains.<ref>{{cite news|last=Sekar|first=Sunitha|date=5 September 2017|title=CMRL takes the fight to birds|newspaper=]|url=http://www.thehindu.com/news/cities/chennai/cmrl-takes-the-fight-to-birds/article19621926.ece|access-date=30 September 2017|archive-date=6 September 2017|archive-url=https://web.archive.org/web/20170906213230/http://www.thehindu.com/news/cities/chennai/cmrl-takes-the-fight-to-birds/article19621926.ece|url-status=live}}</ref><ref>{{cite news|last=Sekar|first=Sunitha|date=16 July 2014|title=Chennai Metro to get a second depot|newspaper=]|url=http://www.thehindu.com/todays-paper/tp-national/tp-tamilnadu/chennai-metro-to-get-a-second-depot/article6215042.ece|access-date=4 October 2014|archive-date=15 February 2016|archive-url=https://web.archive.org/web/20160215081044/http://www.thehindu.com/todays-paper/tp-national/tp-tamilnadu/chennai-metro-to-get-a-second-depot/article6215042.ece|url-status=live}}</ref> In 2022, an elevated depot at Wimco Nagar, covering an area of {{cvt|3.5|ha}}, commenced operations with facilities for inspection, emergency repair, and a washing plant.<ref>{{cite news|last=Sekar|first=Sunitha|date=5 May 2018|title=Metro Rail extension gathers pace|newspaper=]|url=http://www.thehindu.com/todays-paper/tp-national/tp-tamilnadu/metro-rail-extension-gathers-pace/article23778585.ece|access-date=12 May 2018|archive-date=26 February 2020|archive-url=https://web.archive.org/web/20200226061426/http://www.thehindu.com/todays-paper/tp-national/tp-tamilnadu/metro-rail-extension-gathers-pace/article23778585.ece|url-status=live}}</ref> A new depot is planned at Madhavaram a part of the second phase.<ref>{{cite press release|url=https://chennaimetrorail.org/wp-content/uploads/2023/07/Press-Release-20.07.2023-English.pdf|title=Contract Agreement Signed for construction of Operation Control Centre at Madhavaram Depot of CMRL Phase II|date=20 July 2023|access-date=1 May 2024|publisher=]}}</ref> And also a depot is planned at Poonamallee which is part of phase II.{{citation needed|date=December 2024}} | ||
== Operations == | == Operations == | ||
{{As of|2022}}, the metro operates trains from 5:00{{nbsp}}am to 11:00{{nbsp}}pm. The blue line has an average frequency of every 6 minutes during peak hours and every 12 minutes during off-peak hours. On the green line, the average frequency is 12 minutes during peak hours and 18 minutes during off-peak hours.<ref>{{cite news|title=Single train trip to equal 160 buses, 3000 cars and 6000 bikes|newspaper=]|date=29 August 2012|url=http://www.thehindu.com/news/cities/chennai/article3832896.ece|archive-url=https://web.archive.org/web/20120830014100/http://www.thehindu.com/news/cities/chennai/article3832896.ece|archive-date=2012-08-30|access-date=1 December 2023}}</ref><ref>{{cite report|title=Timings of Chennai Metro Rail As of January 2022|url=https://chennaimetrorail.org/wp-content/uploads/2022/01/first-and-last-train-timings_terminal_NP10_P5_2300_WK2-NP10_SUN_2200-NP10_2300_FEST.pdf|url-status=live|archive-url=https://web.archive.org/web/20220125040226/https://chennaimetrorail.org/wp-content/uploads/2022/01/first-and-last-train-timings_terminal_NP10_P5_2300_WK2-NP10_SUN_2200-NP10_2300_FEST.pdf|archive-date=25 January 2022|website=Chennai Metro Rail}}</ref> The main operational control center (OCC) is located in Koyambedu where the movement of trains and real-time CCTV footage obtained is monitored.<ref>{{cite news|last=Karthikeyan|first=K.|date=26 July 2014|title=High tech control room for Chennai metro|newspaper=]|url=https://www.deccanchronicle.com/140726/nation-current-affairs/article/high-tech-control-room-chennai-metro|access-date=4 October 2014|archive-date=4 October 2014|archive-url=https://web.archive.org/web/20141004225518/http://www.deccanchronicle.com/140726/nation-current-affairs/article/high-tech-control-room-chennai-metro|url-status=live}}</ref> In 2022-23, the average daily ridership was 0.25 million.<ref name="AR"/> | {{As of|2022}}, the metro operates trains from 5:00{{nbsp}}am to 11:00{{nbsp}}pm. The blue line has an average frequency of every 6 minutes during peak hours and every 12 minutes during off-peak hours. On the green line, the average frequency is 12 minutes during peak hours and 18 minutes during off-peak hours.<ref>{{cite news|title=Single train trip to equal 160 buses, 3000 cars and 6000 bikes|newspaper=]|date=29 August 2012|url=http://www.thehindu.com/news/cities/chennai/article3832896.ece|archive-url=https://web.archive.org/web/20120830014100/http://www.thehindu.com/news/cities/chennai/article3832896.ece|archive-date=2012-08-30|access-date=1 December 2023}}</ref><ref>{{cite report|title=Timings of Chennai Metro Rail As of January 2022|url=https://chennaimetrorail.org/wp-content/uploads/2022/01/first-and-last-train-timings_terminal_NP10_P5_2300_WK2-NP10_SUN_2200-NP10_2300_FEST.pdf|url-status=live|archive-url=https://web.archive.org/web/20220125040226/https://chennaimetrorail.org/wp-content/uploads/2022/01/first-and-last-train-timings_terminal_NP10_P5_2300_WK2-NP10_SUN_2200-NP10_2300_FEST.pdf|archive-date=25 January 2022|website=Chennai Metro Rail}}</ref> The main operational control center (OCC) is located in Koyambedu where the movement of trains and real-time CCTV footage obtained is monitored.<ref>{{cite news|last=Karthikeyan|first=K.|date=26 July 2014|title=High tech control room for Chennai metro|newspaper=]|url=https://www.deccanchronicle.com/140726/nation-current-affairs/article/high-tech-control-room-chennai-metro|access-date=4 October 2014|archive-date=4 October 2014|archive-url=https://web.archive.org/web/20141004225518/http://www.deccanchronicle.com/140726/nation-current-affairs/article/high-tech-control-room-chennai-metro|url-status=live}}</ref> In 2022-23, the average daily ridership was 0.25 million.<ref name="AR">https://chennaimetrorail.org/wp-content/uploads/2024/01/Press-Release-02.01.2024-English.pdf</ref> | ||
=== Fare and ticketing === | === Fare and ticketing === | ||
Line 345: | Line 346: | ||
The minimum fare is {{INR}}10 and the maximum fare is {{INR}}50.<ref>{{cite news|url=https://www.thehindu.com/news/cities/chennai/now-ride-from-washermanpet-to-airport-takes-just-40-minutes/article26232236.ece|title=Chennai Metro: Now, ride from Washermanpet to airport takes just 40 minutes|last=Sekar|first=Sunitha|date=11 February 2019|newspaper=]|access-date=11 February 2019|archive-date=27 March 2019|archive-url=https://web.archive.org/web/20190327112038/https://www.thehindu.com/news/cities/chennai/now-ride-from-washermanpet-to-airport-takes-just-40-minutes/article26232236.ece|url-status=live}}</ref><ref>{{cite report|url=https://chennaimetrorail.org/wp-content/uploads/2021/02/Fare-chart-for-all-stns.pdf|title=Chennai Metro fare table|publisher=]|access-date=6 November 2023|archive-date=16 December 2023|archive-url=https://web.archive.org/web/20231216132211/https://chennaimetrorail.org/wp-content/uploads/2021/02/Fare-chart-for-all-stns.pdf|url-status=live}}</ref> | The minimum fare is {{INR}}10 and the maximum fare is {{INR}}50.<ref>{{cite news|url=https://www.thehindu.com/news/cities/chennai/now-ride-from-washermanpet-to-airport-takes-just-40-minutes/article26232236.ece|title=Chennai Metro: Now, ride from Washermanpet to airport takes just 40 minutes|last=Sekar|first=Sunitha|date=11 February 2019|newspaper=]|access-date=11 February 2019|archive-date=27 March 2019|archive-url=https://web.archive.org/web/20190327112038/https://www.thehindu.com/news/cities/chennai/now-ride-from-washermanpet-to-airport-takes-just-40-minutes/article26232236.ece|url-status=live}}</ref><ref>{{cite report|url=https://chennaimetrorail.org/wp-content/uploads/2021/02/Fare-chart-for-all-stns.pdf|title=Chennai Metro fare table|publisher=]|access-date=6 November 2023|archive-date=16 December 2023|archive-url=https://web.archive.org/web/20231216132211/https://chennaimetrorail.org/wp-content/uploads/2021/02/Fare-chart-for-all-stns.pdf|url-status=live}}</ref> | ||
There are six types of tickets issued by CMRL for travel in Chennai Metro.<ref>{{cite web|url=http://tickets.chennaimetrorail.org/WEB/F03?2|title=Tickets issued by CMRL|publisher=]|access-date=6 November 2019|archive-date=6 September 2019|archive-url=https://web.archive.org/web/20190906163936/http://tickets.chennaimetrorail.org/WEB/F03?2|url-status=live}}</ref> |
There are six types of tickets issued by CMRL for travel in Chennai Metro.<ref>{{cite web|url=http://tickets.chennaimetrorail.org/WEB/F03?2|title=Tickets issued by CMRL|publisher=]|access-date=6 November 2019|archive-date=6 September 2019|archive-url=https://web.archive.org/web/20190906163936/http://tickets.chennaimetrorail.org/WEB/F03?2|url-status=live}}</ref> | ||
* Single journey tokens, which need to be purchased each time for every journey at the ticket counter or in ticket vending machines available at all stations. | * Single journey tokens, which need to be purchased each time for every journey at the ticket counter or in ticket vending machines available at all stations. | ||
* ] (SVC) are pre-paid, rechargeable, travel cards that can be purchased at any ticket counter against a refundable deposit, can be recharged up to at any ticket counter or in automated ticket vending machines at stations and offers discounted fares. In April 2023, ] replaced the ] |
* ] (SVC) are pre-paid, rechargeable, travel cards that can be purchased at any ticket counter against a refundable deposit, can be recharged up to at any ticket counter or in automated ticket vending machines at stations and offers discounted fares. In April 2023, ] replaced the ] | ||
* Trip cards are for applicable for travel between the same two stations and are available in varied combinations and validity with discounted fares. | * Trip cards are for applicable for travel between the same two stations and are available in varied combinations and validity with discounted fares. | ||
* Tourist cards provide the cardholders unlimited rides on the Chennai Metro system for one day. | * Tourist cards provide the cardholders unlimited rides on the Chennai Metro system for one day. | ||
Line 356: | Line 357: | ||
==See also== | ==See also== | ||
⚫ | {{Portal bar|India|Trains|Transport}} | ||
* ] | |||
* ] | |||
* ] | * ] | ||
* ] | * ] | ||
Line 384: | Line 388: | ||
{{Transport in Tamil Nadu}} | {{Transport in Tamil Nadu}} | ||
}} | }} | ||
⚫ | {{Portal bar|India|Trains|Transport |
||
{{authority control}} | {{authority control}} | ||
Latest revision as of 03:55, 3 January 2025
Rapid transit system in Chennai, IndiaFor the elevated railway line, see Chennai Mass Rapid Transit System.
Chennai Metro | |||
---|---|---|---|
A metro train at Guindy station on the Blue Line | |||
Overview | |||
Owner | Chennai Metro Rail Limited (CMRL) | ||
Locale | Chennai, Tamil Nadu, India | ||
Transit type | Rapid Transit | ||
Number of lines | 2 (operational) 3 (under construction) | ||
Line number | Operational
| ||
Number of stations | 41 | ||
Daily ridership | 288329 (2024) | ||
Annual ridership | 105.24 million (2024) | ||
Headquarters | MetroS, Anna Salai, Nandanam, Chennai–600035 | ||
Website | chennaimetrorail | ||
Operation | |||
Began operation | 29 June 2015; 9 years ago (2015-06-29) | ||
Operator(s) | Chennai Metro Rail Limited (CMRL) | ||
Number of vehicles | 52 | ||
Train length | 100 m (330 ft) | ||
Headway | 6–12 minutes | ||
Technical | |||
System length | 54.1 km (33.6 mi) | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
Electrification | 25 kV 50 Hz AC Catenary | ||
Top speed | 120 km/h (75 mph) | ||
|
The Chennai Metro is a rapid transit system serving the city of Chennai, India. Operated by Chennai Metro Rail Limited (CMRL) – a joint venture between the Government of India and the State Government of Tamil Nadu, the network consists of two lines and spans 54.1 km (33.6 mi). The system uses standard gauge and has 41 underground and elevated stations.
Planning for the Metro started in 2007-08 with construction commencing in February 2009. After testing in 2014, the first segment of the metro between the Alandur and Koyambedu stations on the Green Line began operations on 29 June 2015. On 21 September 2016, operations on the Blue Line commenced between Chennai Airport and Little Mount. The underground stretch from AG-DMS to Washermanpet of Blue Line opened on 10 February 2019, completing phase 1 of the Metro.
Three more lines covering a length of 118.9 km (73.9 mi) are under construction as part of the second phase. The Chennai Mass Rapid Transit System, operated by Indian Railways, is planned to be incorporated into the Chennai Metro. A light rail has been proposed to connect Tambaram of the Chennai suburban rail network with Velachery on the MRTS. Further extensions are also planned for the three lines under construction.
Background
A single electrified line from Chennai Beach to Tambaram began operations in 1931 as part of the Chennai Suburban Railway. Two other rail lines were subsequently built connecting Chennai Central to Gummidipoondi and Tiruvallur in 1979. In 1965, the Planning Commission evaluated the capacity of the transportation network in major metropolitan cities including Madras, and developed plans for further expansion of transportation amenities. As a result, an initial stretch of the Chennai Mass Rapid Transit System (MRTS) between Chennai Beach and Chepauk opened in 1995 – the first elevated rail line in India. The MRTS later extended to Thirumayilai in 1997, to Thiruvanmiyur in 2004, and to Velachery in 2007. In 2006, a modern metro rail system for Chennai was planned and would be modeled after the Delhi Metro.
Planning and construction
Phase I
The Delhi Metro Rail Corporation (DMRC) was tasked to prepare a project report on the implementation of metro system in Chennai. The Government of Tamil Nadu approved the first phase of the project in November 2007. The first phase was planned with two lines covering 45.1 km (28.0 mi) with 25 km (15.5 mi) being underground. The first corridor would connect Washermanpet with Chennai International Airport extending for 23.1 km (14.4 mi) with 14.3 km (8.9 mi) being underground and the second corridor would connect St.Thomas Mount with Chennai Central extending for 22 km (13.7 mi) with 9.7 km (6.0 mi) being underground. In December 2007, the Chennai Metro Rail Limited (CMRL) was established as a joint venture between the Governments of India and Tamil Nadu to execute the project. The Planning commission gave in-principle approval for the project in April 2008 with the final approval by the Union Cabinet of Government of India in January 2009. The estimated base cost of the first phase was ₹146 billion (US$1.7 billion) of which 59% was loaned by Japan International Cooperation Agency (JICA). The Government of India contributed 15% of the cost with the Government of Tamil Nadu financed the remaining 21% of the project.
In February 2009, a ₹1.99 billion (US$23 million) contract was awarded for the construction of a 4.5 km (2.8 mi) long viaduct along the Inner Ring Road between Koyambedu and Ashok Nagar and construction started on 10 June. In March 2009, a US$30 million contract was awarded to a consortium of five companies headed by French company Egis for technical consultancy on the project. In August 2010, the contract for supplying rolling stock was awarded to Alstom for US$243 million. In January 2011, a joint venture between Larsen and Toubro (L&T) and Alstom was awarded the contract for design and construction of track works and a depot at Koyambedu for ₹4.49 billion (US$53 million).
Contracts for the construction of underground sections of the first phase were awarded to Gammon India and Mosmetrostroy in February 2011. Subsequently in June, tenders for the elevated stations of the first phase were awarded to Consolidated Construction Consortium. The contract for supply of lifts and escalators was awarded to a joint venture of Johnson Lifts and SJEC Corporation. The contract for power supply and overhead electrification was awarded to Siemens for ₹3.05 billion (US$36 million) and contracts for automatic fare collection (AFC), tunnel ventilation and air conditioning were awarded to Nippon Signal, Emirates Trading Agency and Voltas, respectively. In July 2012, the first tunnel boring machine was launched and by October that year, eleven machines were commissioned to bore tunnels by three consortia – Afcons-Transtonnelstroy, L&T and SUCG.
In August 2012, a construction worker was killed with six others seriously injured due to a crane failure near Pachaiyappa's College and on 10 January 2013, a 22-year-old construction worker was killed with three others injured at a construction site between Alandur and St Thomas Mount. On 6 November 2013, a test run was conducted along a stretch of 1 km (0.62 mi) track. The project faced several delays and missed deadlines due to problems with land acquisition and cancellation of construction contracts. On 11 January 2014, a crane toppled over, killing a 20-year-old construction worker and seriously injuring another at Saidapet.
On 14 February 2014, the maiden trial run was conducted between Koyambedu and Ashok Nagar stations. The metro received the statutory speed certification clearance from the Research Design and Standards Organisation (RDSO) in August that year. In January 2015, a report was submitted to the Commissioner of Metro Rail Safety (CMRS) for mandatory safety approvals. After inspecting the infrastructure, the CMRS submitted the report to the Railway Board in April 2015.
On 17 June 2015, a 30-year-old man was killed and another motorcyclist injured when an iron rod fell on them at a metro construction site near Officers Training Academy at St. Thomas Mount. Operations on the green line between the Alandur and Koyambedu stations commenced on 29 June 2015. The blue line segment from the Airport and Little Mount stations commenced operations on 21 September 2016. The first underground section between Thirumangalam to Nehru Park on the green line opened on 14 May 2017, and the extension to Chennai central was completed on 25 May 2018 along with the section from the Saidapet and AG-DMS stations on the blue line. On 10 February 2019, the underground stretch from AG-DMS to Washermanpet of blue line was opened, marking the completion of the first phase of the metro.
Line Name | Terminals | Stations | Status | |
---|---|---|---|---|
Green Line | Koyambedu | Alandur | 7 | 29 June 2015 |
Alandur | St. Thomas Mount | 1 | 14 October 2016 | |
Thirumangalam | Nehru Park | 7 | 14 May 2017 | |
Nehru Park | Central | 2 | 25 May 2018 | |
Blue Line | Chennai Airport | Little Mount | 6 | 21 September 2016 |
Little Mount | AG–DMS | 4 | 25 May 2018 | |
AG–DMS | Washermanpet | 7 | 10 February 2019 |
Phase I Extension
A 9 km (5.6 mi) northern extension of the blue line was announced in 2014 by the Government of Tamil Nadu. The extension would run from Washermanpet to Wimco Nagar and consist of nine stations. Construction started in July 2016 with trial runs in December 2020. The line opened for passenger traffic on 14 February 2021, increasing the length of the operational metro system to 54.1 km (33.62 mi). The expansion costed ₹37.7 billion (US$440 million) of which 57% was loaned by Japan.
In 2021, the CMRL proposed a further extension of the blue line to connect the airport with Kilambakkam at an estimated cost of ₹46.25 billion (US$540 million).
Line | Terminals | Length | Stations | Status | Reference | |
---|---|---|---|---|---|---|
Blue Line | Washermanpet | Wimco Nagar | 9 km (5.6 mi) | 8 | 14 February 2021 | |
Wimco Nagar | Wimco Nagar Depot | 1 | 13 March 2022 | |||
Chennai Airport | Kilambakkam | 15.3 km (9.5 mi) | 12 | DPR prepared |
Phase II
Chennai Metro | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Legend | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Phase II | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
In July 2016, the Government of Tamil Nadu announced that the second phase would have three lines spanning 104 km (65 mi) with 104 stations. Two corridors would extend from Madhavaram Milk Colony connecting with Siruseri SIPCOT and Sholinganallur respectively with the third corridor connecting Koyambedu with Lighthouse on the Marina beach. In July 2017, the state government announced an extension of Phase II, involving a section from Lighthouse up to Poonamallee with an intersection with the Madhavaram–Sholinganallur line at Alwarthirunagar. The second phase would span 118.9 km (73.9 mi) with 128 stations. The stations for the second phase were designed to be smaller than the stations of the first phase to reduce the cost and time of construction. In 2019, the Madras High Court questioned the state government on the construction method of the tunnels and its impact on the water bodies. The second phase was estimated to cost ₹63.25 billion (US$740 million) of which ₹47.1 billion (US$550 million) was loaned by JICA.
On 20 November 2020, foundation stone for the second phase was laid and construction commenced. On 14 February 2021, Prime Minister of India announced that the government has set aside ₹630 billion (US$7.4 billion) for the construction of the second phase and its further extension. In May 2021, the CMRL awarded contracts to Tata Group, L&T and HCC-KEC for the construction of various sections of the second phase. In November 2022, Alstom was awarded a contract to supply rolling stock for the second phase. The contract included a provision for the supply of 78 train sets including 36 driver-less trains. In December 2022, a contract for the installation of tracks was given to KEC–VNC and Hitachi bagged the contract for the installation of signalling systems. In January 2023, Rail Vikas Nigam Limited was awarded a contract for the constructions of underground stations and Linxon was given the contract for the installation of electric traction.
In May 2023, the CMRL announced minor changes to the lines' alignment and that nine stations would be scrapped in the revised plan. Hence, the total length of the second phase was reduced to 116.1 km (72.1 mi).
Line Name | Terminals | Length (km) | Stations | Status | |
---|---|---|---|---|---|
Purple Line | Madhavaram Milk Colony | Siruseri SIPCOT | 45.4 | 47 | Under construction |
Orange Line | Poonamallee Bypass | Lighthouse | 26.1 | 27 | |
Red Line | Madhavaram Milk Colony | Sholinganallur | 44.6 | 45 | |
Total | 116.1 | 113 |
In May 2023, L&T was contracted for the installation of overhead equipment and control and monitoring systems. Tata Projects was awarded the contract to construct select stations in October. In December, the CMRL awarded the contract to ST Engineering for the installation of platform screen doors in the elevated stations of the second phase. In the same month, Shellinfo was awarded a contract ₹42 crore (US$4.9 million) for the installation of automated fare collection systems. In addition to the previously ordered Alstom train-sets, the CMRL invited bids in March 2024 for the supply of 96 train-sets for the second phase. As of May 2024, about 20 km (12 mi) of the second phase had been completed.
Phase II Extension
In 2022, the state government proposed an extension plan spanning 93 km (58 mi) for the three under construction lines of the second phase. The proposal involved extension of Purple Line from Siruseri SIPCOT to Kilambakkam, Orange Line from Poonamallee to Parandur and Red Line from Koyambedu to Avadi. The proposed extension of second phase lines from Siruseri to Kilambakkam, Poonamallee to Parandur, and Koyambedu to Avadi were projected to cost ₹54.58 billion (US$640 million), ₹107.12 billion (US$1.3 billion), and ₹67.36 billion (US$790 million), respectively. Between late 2023 and early 2024, feasibility reports submitted by the CMRL suggested dropping the proposed extension of the purple line due to economic viability and going ahead with the planned extensions of the other two lines, spanning 59.7 km (37.1 mi). In May 2024, the state government proposed a new 16 km (9.9 mi) extension from Madhavaram to Ennore. In August 2024, another new extension from Airport metro to Poonamallee was proposed by CMRL with the aim of connecting the existing airport with the upcoming new airport at Parandur by metro.
Line | Terminals | via | Length | Stations | Status | Reference | |
---|---|---|---|---|---|---|---|
Orange Line | Poonamallee Bypass | Parandur | Sriperumbudur, Irungattukottai | 43.6 km (27.1 mi) | 19 | DPR under preparation | |
Red Line (Line 5B) |
Koyambedu | Avadi | Mogappair, Ambattur | 16.1 km (10.0 mi) | 15 | ||
TBD | Chennai International Airport | Poonamallee | Thiruneermalai, Kundrathur | 16 km (9.9 mi) | TBD | Feasibility study going on | |
TBD | Madhavaram Milk Colony | Ennore | Wimco Nagar | 16 km (9.9 mi) | TBD | Feasibility to be studied |
Integration of MRTS
Main article: Chennai MRTSThe government proposed to integrate the Chennai Mass Rapid Transit System (MRTS) into the Chennai Metro in 2017. In July 2018, the PwC said that the merger would cost around ₹30 billion (US$350 million) to convert the rolling stock and install other facilities for the merger. On 11 May 2022, Southern Railway of the Indian Railways granted in-principle approval for the conversion of the MRTS into the metro. The railway would handover the MRTS to the CMRL once the expansion of the MRTS is completed and as of 2024, the extended second phase of the MRTS project, connecting Velachery with St. Thomas Mount was still under construction. Once the takeover is completed, Chennai Metro will upgrade the entire MRTS system including tracks, security, ticketing system and rolling stock.
Metrolite
Main article: Chennai MetroliteIn 2020, a light rail was proposed to connect Tambaram railway station of the existing suburban rail network with Velachery on the MRTS, as part of plans to link the different urban transit lines in the city. Feasibility studies for the project was commissioned in February 2023 by the Chennai Unified Metropolitan Transport Authority (CUMTA). In March 2024, a study was commissioned to re-assess the feasibility of establishing a new corridor connecting Tambaram with Velachery with an extension to connect with the metro at Guindy.
Line | Terminals | Length | Stations | Status | Reference | |
---|---|---|---|---|---|---|
Metrolite | Tambaram | Velachery | 20 km (12 mi) | TBD | DFR to be re-assessed and prepared | |
Velachery | Guindy | 3 km (1.9 mi) |
Others
In 2023, the CMRL proposed the development of Central Square around its headquarters with commercial complexes and multi-storied buildings. The third phase of the Chennai Metro is under planning as a part of the Chennai Comprehensive Mobility Plan. The CMRL is also involved in the feasibility studies for the development of metro rail transport in the cities of Coimbatore, Madurai and Tiruchirapalli.
Infrastructure
Network and lines
Chennai Metro runs on 1,435 mm (4 ft 8+1⁄2 in) standard gauge and the lines are double-tracked. The average operational speed is 85 km/h (53 mph) with a maximum speed of 120 km/h (75 mph).
As of March 2024, the operational network consists of two colour-coded lines covering a length of 54.1 km (33.6 mi).
Line | Terminal | Operational | Length (km) | Stations | |
---|---|---|---|---|---|
Blue Line | Wimco Nagar Depot | Chennai Airport | 21 September 2016 | 32.1 | 26 |
Green Line | Central | St. Thomas Mount | 29 June 2015 | 22 | 17 |
Total | 54.1 | 41 |
Rolling stock
Alstom supplies the rolling stock for the Chennai Metro. The first nine train sets were imported from Brazil and the rest were manufactured at a new facility set up near Chennai. For the first phase, Alstom supplied 520 train-sets composed of four coaches each with each car measuring 300 m (980 ft) in length. The trains are air-conditioned with electrically operated automated sliding doors and have a first class compartment with a dedicated section reserved for women.
The trains operate on 25 kV AC traction catenary system with a maximum speed of 120 km/h (75 mph). The trains are connected to the grid via overhead electric cables and are equipped with regenerative braking with a capacity to recover 30–35% of the energy during braking. The metro consumes an average of 70 MW of power daily and the electricity is supplied by Tamil Nadu Electricity Board. Chennai Metro also uses solar power with an installed capacity of 6.4 MWp, which contributes to about 12-15% of the energy requirement of the metro.
Stations
See also: List of Chennai metro stationsA total of 40 stations, 22 of which are underground, are operational on the two existing lines of Phase 1. In the underground sections, a walkway runs along the length with cross passages every 250 m (820 ft) for the maintenance and emergency evacuation. The underground stations have an average width of 200 m (660 ft) and average depth of 6.1 m (20 ft) from the ground level. The length of the stations in Phase 1 extension is 180 m (590 ft).
The elevated stations have three levels with the concourse level at a minimum height of 5.5 m (18 ft) above the ground level and platform level above the concourse while the underground stations have two levels with platform screen doors. The stations are air-conditioned and are equipped to be disabled and elderly friendly, with automated fare collection, public announcement system, electronic display boards, escalators and lifts. Paid parking facilities are available for two wheelers in most stations and four wheelers in select stations.
Depots
Chennai Metro maintains a major depot at Koyambedu covering an area of 26 ha (64 acres) which houses maintenance workshops, stabling lines, test tracks and a washing plant for the trains. In 2022, an elevated depot at Wimco Nagar, covering an area of 3.5 ha (8.6 acres), commenced operations with facilities for inspection, emergency repair, and a washing plant. A new depot is planned at Madhavaram a part of the second phase. And also a depot is planned at Poonamallee which is part of phase II.
Operations
As of 2022, the metro operates trains from 5:00 am to 11:00 pm. The blue line has an average frequency of every 6 minutes during peak hours and every 12 minutes during off-peak hours. On the green line, the average frequency is 12 minutes during peak hours and 18 minutes during off-peak hours. The main operational control center (OCC) is located in Koyambedu where the movement of trains and real-time CCTV footage obtained is monitored. In 2022-23, the average daily ridership was 0.25 million.
Fare and ticketing
The minimum fare is ₹10 and the maximum fare is ₹50.
There are six types of tickets issued by CMRL for travel in Chennai Metro.
- Single journey tokens, which need to be purchased each time for every journey at the ticket counter or in ticket vending machines available at all stations.
- Stored value cards (SVC) are pre-paid, rechargeable, travel cards that can be purchased at any ticket counter against a refundable deposit, can be recharged up to at any ticket counter or in automated ticket vending machines at stations and offers discounted fares. In April 2023, National Common Mobility Card replaced the Stored value cards
- Trip cards are for applicable for travel between the same two stations and are available in varied combinations and validity with discounted fares.
- Tourist cards provide the cardholders unlimited rides on the Chennai Metro system for one day.
- QR Tickets for single and return journey tickets can be bought through the CMRL mobile app with QR code ticket scanners at stations.
- National Common Mobility Card, also branded as Singara Chennai card, a stored-value cum debit card launched in 2023 in association with State Bank of India which can be used to access all major other metro and select bus transport systems in India.
Chennai Metro is the second most expensive in terms of ticket cost per kilometer in the country after Mumbai Metro. The fares were temporarily slashed by up to ₹20 by the then Chief Minister of Tamil Nadu in February 2021 with the maximum fare capped at ₹40.
See also
Portals:Notes
- Six inter-connecting stations shared by the lines. Also includes six existing stations as part of the currently operational lines
- Two inter-change stations are shared by the lines
References
- "10.52 crore passengers travelled in Chennai Metro Train in 2024" (PDF).
- "10.52 crore passengers travelled in Chennai Metro Train in 2024" (PDF).
- "Metro Rail: power supply, overhead equipment contract given" (PDF). Chennai Metro Rail Limited. 2 November 2015. Archived (PDF) from the original on 8 April 2023. Retrieved 31 January 2023.
- Chennai Division, General Information (PDF) (Report). Southern Railway Zone, Indian Railways. Archived (PDF) from the original on 15 June 2024. Retrieved 1 December 2023.
- Brief History of Chennai Division (PDF) (Report). Southern Railway Zone, Indian Railways. Archived (PDF) from the original on 15 December 2023. Retrieved 1 December 2023.
- Institutional Development of Suburban Rail systems (PDF) (Report). Indian Railway. p. 10. Archived (PDF) from the original on 2 April 2024. Retrieved 1 December 2023.
This was appreciated by the Planning Commission way back in 1965, when it took the initiative to set up Metropolitan Transport Teams (MTT) to study the transport problems of the first four metropolitan cities of Bombay, Calcutta, Delhi and Madras and to recommend policies and programs for their improvement.
- Report No.5 of 2006 (Railways) (PDF) (Report). Comptroller and Auditor General of India. p. 2,3. Archived (PDF) from the original on 15 April 2024. Retrieved 26 December 2023.
- Traffic and Transportation, Chapter 5 (PDF). CMDA (Report). Archived (PDF) from the original on 31 January 2012. Retrieved 19 August 2012.
- "Development of MRTS in Chennai". Chennai Metropolitan Development Authority. Archived from the original on 12 July 2023. Retrieved 1 December 2023.
- "MRTS services extended". Business Line. 27 January 2004. Archived from the original on 29 October 2013. Retrieved 29 July 2012.
- "Metro is a financial success, not just a technological one". Livemint. 11 September 2007. Archived from the original on 13 November 2019. Retrieved 13 November 2019.
- ^ "Chennai Metro Rail Project approved by Government of India" (PDF) (Press release). Chennai Metro Rail Limited. 28 January 2009. Archived (PDF) from the original on 8 April 2023. Retrieved 1 December 2023.
- ^ "Chennai Metro Rail FAQ". Chennai Metro Rail Limited. Archived from the original on 27 February 2018. Retrieved 16 February 2018.
- "Center nod for Metro Rail in Chennai". The Times of India. 16 April 2008. Archived from the original on 25 June 2008. Retrieved 20 August 2010.
- "Soma Enterprise wins Rs.199 crore Chennai Metro Rail order". Projects Today. 19 February 2009. Archived from the original on 28 April 2024. Retrieved 16 August 2010.
- "Work commences on Chennai Metro". Projects Today. 11 June 2009. Archived from the original on 25 August 2017. Retrieved 16 August 2010.
- Ramesh, Niranjana (10 March 2009). "Another milestone in Chennai metro to be designed by French". The Economic Times. Archived from the original on 19 October 2016. Retrieved 10 March 2009.
- "Alstom to provide 2000 cars for Chennai's metro". The Financial Express. 11 September 2010. Archived from the original on 29 January 2023. Retrieved 18 September 2010.
- "First Metro Rolling Stock contract in India" (Press release). Alstom Transport. 9 September 2010. Archived from the original on 15 April 2023. Retrieved 18 September 2010.
- "L&T, Alstom JV bags Chennai Metro project". Business Standard. Archived from the original on 10 February 2018. Retrieved 14 February 2018.
- "L&T, Alstom venture bags Chennai Metro project". The Hindu. 22 January 2011. Archived from the original on 2 November 2013. Retrieved 6 June 2016.
- "Two firms bag 12 underground tunnels & stations work". The Times of India. 1 February 2011. Archived from the original on 3 October 2016. Retrieved 6 June 2016.
- "Gammon India bags two Chennai Metro orders worth Rs 19.47 billion". The Economic Times. 2 February 2011. Archived from the original on 29 January 2023. Retrieved 6 June 2016.
- "Elevated metro stations to come up at 100 places". The Times of India. 29 June 2010. Archived from the original on 5 July 2010. Retrieved 16 August 2010.
- "Tenders awarded for 10 Metro Rail stations". The Hindu. 29 June 2010. Archived from the original on 14 August 2010. Retrieved 16 August 2010.
- "Metro Rail awards contract for lifts". The Hindu. Archived from the original on 14 January 2016. Retrieved 6 June 2016.
- "Siemens wins power supply contract for Chennai metro". Business Standard. 12 February 2011. Archived from the original on 18 August 2016. Retrieved 6 June 2016.
- "Work on 'double-decker' structure at Arcot Road". The Hindu. 12 September 2011. Archived from the original on 14 January 2016. Retrieved 6 June 2016.
- Sangameswaran, K. T. (5 April 2012). "Plea against razing part of heritage building for Metro Rail dismissed". The Hindu. Archived from the original on 7 April 2012. Retrieved 7 April 2012.
- Raja Simhan, T. E. (24 September 2014). "Chennai Metro Rail set for trial runs between Egmore, Shenoy Nagar by middle of next year". Business Line. Archived from the original on 15 February 2016. Retrieved 2 October 2014.
- Manikandan, K.; Srinivasan, Meera (10 January 2013). "Girder crash kills worker at Chennai Metro Rail site". The Hindu. Archived from the original on 19 April 2014. Retrieved 6 June 2016.
- Ramakrishnan, T. (6 November 2013). "Chennai Metro Rail Test Run". The Hindu. Archived from the original on 10 November 2013. Retrieved 6 November 2013.
- "Metro phase I: A hard, but gratifying journey". The Times of India. 10 February 2019. Archived from the original on 18 March 2020. Retrieved 1 June 2024.
- "After several delays, first phase of Chennai metro rail service inaugurated by Jaya". First Post. 29 June 2015. Archived from the original on 14 June 2021. Retrieved 1 June 2024.
- Sekar, Sunitha (11 January 2014). "Metro Rail worker dies as crane topples". The Hindu. Archived from the original on 27 April 2023. Retrieved 1 June 2023.
- "Metro Rail Rolls Out a Surprise with Koyambedu-Pillar trial Run". New Indian Express. 14 February 2014. Archived from the original on 15 September 2014. Retrieved 2 October 2014.
- "Chennai Metro holds trial on elevated section". Business Line. 14 February 2014. Archived from the original on 22 February 2014. Retrieved 2 October 2014.
- "Chennai Metro one stop short of dream run". Deccan Chronicle. 31 August 2014. Archived from the original on 4 March 2016. Retrieved 6 June 2016.
- "Metro rail service likely to begin in November". The Hindu. 31 August 2014. Archived from the original on 14 January 2016. Retrieved 6 June 2016.
- Shivakumar, C (3 January 2015). "1st Phase Metro Tracks Ready for Safety Test". The New Indian Express. Archived from the original on 4 March 2016. Retrieved 6 June 2016.
- Kannan, Ramya (7 April 2015). "Metro Rail safety inspected". The Hindu. Archived from the original on 14 January 2016. Retrieved 7 June 2016.
- "Koyambedu-Alandur metro closer to opening". The Times of India. 7 April 2015. Archived from the original on 24 July 2016. Retrieved 7 June 2016.
- "Conditional clearance for Metro Rail". The Hindu. 28 April 2015. Archived from the original on 14 January 2016. Retrieved 7 June 2016.
- "Software techie dies as iron rod falls on him". The New Indian Express. 17 June 2015. Archived from the original on 29 June 2016. Retrieved 6 June 2016.
- Chennai Metro Newsletter - August 2015 (PDF) (Report). Chennai Metro Rail Limited. 29 June 2015. Archived (PDF) from the original on 20 October 2023. Retrieved 7 June 2023.
- "Chennai Metro newsletter, September 2016" (PDF). Chennai Metro Rail Limited. October 2016. Archived (PDF) from the original on 3 June 2024. Retrieved 1 May 2024.
- Sekar, Sunitha (14 May 2017). "Naidu, Palaniswami flag off underground stretch of Chennai Metro". The Hindu. ISSN 0971-751X. Archived from the original on 26 February 2020. Retrieved 29 January 2019.
- Sekar, Sunitha (25 May 2018). "Chennai Metro Rail opens two underground stretches". The Hindu. ISSN 0971-751X. Archived from the original on 27 February 2020. Retrieved 29 January 2019.
- Simhan, TE Raja (10 February 2019). "PM Modi inaugurates Chennai Metro Rail's final leg". The Hindu Businessline. Archived from the original on 26 October 2020. Retrieved 13 February 2019.
- "Chennai Metro adds a station to phase-1 extension". The Hindu. 30 October 2014. Archived from the original on 14 January 2016. Retrieved 1 June 2024.
- "Track work in Metro phase 1 extension to begin soon". The Hindu. 6 December 2018. Archived from the original on 26 February 2020. Retrieved 6 November 2019.
- "First set of trains for Chennai metro phase 1 extension flagged-off". Business Line. 19 October 2019. Archived from the original on 5 November 2019. Retrieved 6 November 2019.
- "Opening of phase-1 Chennai metro extension stretch to be delayed?". The New Indian Express. Archived from the original on 9 January 2021. Retrieved 9 January 2021.
- "Chennai: Trial run between Washermanpet and Wimco Nagar Metro stations successful, says CMRL". Indian Express. 26 December 2020. Archived from the original on 26 December 2020. Retrieved 26 December 2020.
- ^ "Project status of Chennai Metro". Chennai Metro Rail Limited. Archived from the original on 26 September 2016. Retrieved 16 August 2010.
- "Work on 15-km Metro line from airport to Kilambakkam in Chennai suburbs may begin this year". The New Indian Express. 23 February 2021. Archived from the original on 25 April 2021. Retrieved 25 April 2021.
- "TN to incur ₹9,000 crore this year for Chennai Metro due to delay in Centre's clearance". The Hindu. 19 February 2024. Archived from the original on 28 April 2024. Retrieved 1 April 2024.
- "Chennai Airport-Kilambakkam Metro project set to take off". The Hindu. 20 July 2022. ISSN 0971-751X. Archived from the original on 21 July 2022. Retrieved 21 July 2022.
- "With no funds from Centre for phase II of Metro, Airport-Kilambakkam project unlikely to be taken up now". The Hindu. 3 October 2023. Archived from the original on 10 October 2023. Retrieved 1 December 2023.
- Sekar, Sunitha (2 August 2016). "1800 km, 180 stations: Unveiling Phase II of Metro". The Hindu. Archived from the original on 26 December 2016. Retrieved 24 January 2017.
- Sekar, Sunitha. "Detailed project report for Phase II of Metro Rail ready". The Hindu. Archived from the original on 27 December 2016. Retrieved 24 January 2017.
- "Metro's second phase to go up to Poonamallee". The Hindu. 20 July 2017. Archived from the original on 26 February 2020. Retrieved 1 October 2017.
- U, Tejonmayam (28 December 2016). "Chennai: Metro rail to trim stations under phase 2". The Times of India. Archived from the original on 8 February 2017. Retrieved 24 January 2017.
- "Was Metro tunnelling work executed without disturbing water sources, asks High Court". The Hindu. 14 March 2019. Archived from the original on 10 February 2020. Retrieved 1 May 2019.
- "Phase-II Chennai metro project to cost Rs 36,000 cr". Business Standard. 2 March 2014. Archived from the original on 16 December 2023. Retrieved 1 December 2023.
- "JICA extends ODA Loan of INR 4710 Cr for Chennai Metro Rail Project Phase 2 (II)". JICA. 21 June 2022. Archived from the original on 16 December 2023. Retrieved 1 December 2023.
- "Amit Shah to lay foundation for Chennai Metro's phase II project". The Hindu. 17 November 2020. Archived from the original on 28 April 2024. Retrieved 1 December 2023.
- Dipak K, Dash. "Ground work for Chennai metro rail phase-2 hit". Times of India. Archived from the original on 18 February 2021. Retrieved 19 February 2021.
- "L&T, Tata, HCC-KEC Awarded Chennai Metro Phase 2's Contracts". Metro Rail Guy. 12 May 2021. Archived from the original on 24 February 2024. Retrieved 1 June 2024.
- "Alstom wins €98 million contract to design and manufacture 78 metro coaches for Chennai Metro Phase-II" (Press release). Alstom. 11 November 2022. Archived from the original on 16 December 2023. Retrieved 1 December 2023.
- reference: Thirumangalm Metro station to Nehru park station opening date, reference: Thirumangalm Metro station to Nehru park station opening date (14 May 2017). "Production of driverless trains for Chennai Metro Rail Phase II project begins in Sri City". The Hindu. Archived from the original on 26 February 2024. Retrieved 1 June 2024.
- "KEC – VNC JV signs contract with Chennai Metro for track work of CMRL Phase – 2". Metro Rail News. 30 December 2022. Archived from the original on 1 January 2023. Retrieved 1 June 2024.
- "Chennai Metro phase 2 signalling contract awarded to Hitachi for Rs 1620 crore". News Minute. 7 December 2022. Retrieved 1 June 2024.
- "RVNL shares rise on multiple orders from Chennai Metro". Business Today. 21 January 2023. Archived from the original on 28 June 2023. Retrieved 1 June 2024.
- "Linxon bags traction power supply contract for Phase 2 development of Chennai metro". Metro Rail News. 3 January 2023. Retrieved 1 June 2024.
- "Chennai metro scraps nine stations in phase 2". The Times of India. 14 May 2023. Archived from the original on 2 June 2024. Retrieved 1 May 2024.
- "Phase II– S98 (Anaimalai) TBM Breakthrough at Venugopal Nagar Shaft" (PDF) (Press release). Chennai Metro Rail Limited. 7 June 2023. Archived (PDF) from the original on 2 June 2024. Retrieved 1 May 2024.
- Chennai Metro rail phase II (PDF) (Report). Chennai Metro Rail Limited. Retrieved 1 May 2024.
- "Larsen and Toubro bags two contracts worth nearly ₹770 crore for Chennai Metro Rail's phase II project". The Hindu. 24 May 2023. Archived from the original on 28 September 2023. Retrieved 1 June 2024.
- "Chennai Metro signs contract agreement with TATA Projects for five underground stations". Business Line. 13 October 2023. Archived from the original on 22 October 2023. Retrieved 1 June 2024.
- "CMRL phase-2: Chennai Metro Rail awards contract for install platform screen doors". The Times of India. 20 December 2023. Archived from the original on 7 January 2024. Retrieved 1 June 2024.
- "Shellinfo Awarded Over Rs 42 Crores Contract for Chennai Metro Phase 2". Metro Rail News. 9 December 2023. Archived from the original on 2 March 2024. Retrieved 1 June 2024.
- "CMRL Reinvites Bids for Chennai Metro Phase 2's 96 Coach Contract". Metro Rail News. 21 March 2023. Archived from the original on 5 March 2024. Retrieved 1 June 2024.
- "20km of phase-2 metro lines across city completed in Chennai". The Times of India. 25 May 2024. Archived from the original on 26 May 2024. Retrieved 1 June 2024.
- ^ "Detailed feasibility report for Chennai Metro Rail's Phase 2 extension to be ready in three months". The Hindu. 26 March 2023. Archived from the original on 28 April 2024. Retrieved 1 December 2023.
- ^ "CMRL submits Detailed Feasibility Reports for Phase II project extension". The Financial Express. 22 September 2023. Archived from the original on 29 April 2024. Retrieved 30 April 2024.
- ^ "Chennai Metro Rail submits report to extend connectivity all the way to second airport site at Parandur". The Hindu. 4 January 2024. Archived from the original on 30 April 2024. Retrieved 30 April 2024.
- "Metro from Siruseri- Kilambakkam Bus Terminus Metro Plans Dropped, deemed non-feasible". Times Now. 9 May 2024. Archived from the original on 11 May 2024. Retrieved 11 May 2024.
- ^ Selvaraj, Vignesh (11 May 2024). "Madhavaram to Ennore metro rail extension : CMRL's decision". Oneindia Tamil (in Tamil). Chennai. Archived from the original on 12 May 2024. Retrieved 17 May 2024.
- ^ "Metro Rail to prepare feasibility report for Madhavaram - Ennore corridor". Dinamani (in Tamil). Chennai. 12 May 2024. Archived from the original on 18 May 2024. Retrieved 18 May 2024.
- ^ "Meenambakkam to Parandur airport in 1 hour by metro". The Times of India. 8 August 2024. Retrieved 9 August 2024.
- ^ "Chennai Metro to cut travel time from Meenambakkam to Parandur airport to just 1 hour". Times Now. 8 August 2024. Retrieved 9 August 2024.
- "DPR for Parandur metro line to be ready by November". The Times of India. 26 July 2024. Retrieved 9 August 2024.
- "Koyambedu to Avadi Metro project report by November". The Times of India. 1 August 2024. Retrieved 9 August 2024.
- "Chennai Metro-MRTS merger report in six months". The Hindu. 29 May 2017. Archived from the original on 29 February 2020. Retrieved 29 May 2017.
- Sekar, Sunitha (19 July 2018). "Metro-MRTS merger likely to be a costly affair". The Hindu. Archived from the original on 9 November 2020. Retrieved 22 July 2018.
- "MRTS merger with Chennai Metro gets railway's approval". The New Indian Express. 15 May 2022. Archived from the original on 15 May 2022. Retrieved 16 May 2022.
- "Concrete girder of bridge collapses at MRTS worksite in Thillai Ganga Nagar". The Hindu. 18 January 2024. Archived from the original on 31 January 2024. Retrieved 1 March 2024.
- "Part of bridge falls, rail project delayed again". The Times of India. 19 January 2024. Archived from the original on 31 March 2024. Retrieved 1 March 2024.
- "Chennai: With Metro coaches and modern stations, MRTS set for big upgrade". The New Indian Express. 3 January 2018. Archived from the original on 22 October 2023. Retrieved 1 December 2023.
- ^ "Proposed Metrolite line likely to be rubber-tyred". The New Indian Express. 7 November 2020. Archived from the original on 25 April 2021. Retrieved 25 April 2021.
- ^ "CMRL study to explore Metrolite feasibility". The New Indian Express. 7 February 2023. Archived from the original on 1 April 2023. Retrieved 1 April 2023.
- "Standard Specifications - Light Urban Rail Transit System: 'Metrolite'" (PDF). Ministry of Housing & Urban Affairs. Archived (PDF) from the original on 30 September 2023. Retrieved 1 December 2023.
- ^ "CMRL revives old network from Tambaram to Velachery and extends to Guindy". The Times of India. 6 March 2024. Archived from the original on 29 April 2024. Retrieved 30 April 2024.
- "Chennai Metro Rail Limited plans to build 27-storey building at Central Square". The Hindu. 27 September 2023. Archived from the original on 30 April 2024. Retrieved 25 April 2024.
- "Feasibility report ready for ₹6,683 crore Coimbatore Metro Rail". The Hindu. 23 February 2021. ISSN 0971-751X. Archived from the original on 17 April 2021. Retrieved 25 April 2021.
- Sekar, Sunitha (22 March 2022). "CMRL to do a feasibility study for building mass rapid transit in three cities". The Hindu. ISSN 0971-751X. Archived from the original on 21 March 2022. Retrieved 22 March 2022.
- Srinivasan, Meera (3 February 2013). "Countdown to Chennai Metro begins". The Hindu. Archived from the original on 5 February 2013. Retrieved 3 February 2013.
- "Metro rail train zips over city roads". The Hindu. 6 June 2016. Archived from the original on 26 October 2023. Retrieved 1 December 2023.
- "CMRL Phase 1 extension Washermanpet and Wimco nagar". Chennai Metro Rail Limited. 5 November 2016. Archived from the original on 25 July 2021. Retrieved 7 July 2021.
- "Chennai Metro, line map" (PDF). Chennai Metro Rail Limited. Archived (PDF) from the original on 8 December 2023. Retrieved 1 December 2023.
- "Alstom completes in Lapa plant the first train for Chennai metro, in India" (Press release). Alstom. May 2013. Archived from the original on 21 April 2016. Retrieved 6 June 2016.
- "First coach for Chennai Metro by April 2013: Alstom Transport". Business Line. Archived from the original on 2 November 2013. Retrieved 6 June 2016.
- Sekar, Sunitha (28 October 2013). "Chennai Metro to have 1st class compartment". The Hindu. Archived from the original on 21 March 2014. Retrieved 2 March 2014.
- Sekar, Sunitha (29 June 2018). "Phase II to have six and ten-coach Metro trains". The Hindu. Chennai. Archived from the original on 29 January 2020. Retrieved 15 July 2018.
- Sekar, Sunitha (18 July 2014). "All aboard, Chennai Metro". The Hindu. Archived from the original on 15 February 2016. Retrieved 15 July 2018.
- "Alstom to provide 168 cars for Chennai's metro for 243 million" (Press release). Alstom. 1 September 2010. Archived from the original on 15 April 2023. Retrieved 6 June 2023.
- "First ride in a Chennai Metro train". The Hindu. Archived from the original on 14 January 2016. Retrieved 6 June 2016.
- "Metro rail sets up units to power trains, stations to meet year-end deadline to start services". The Times of India. 15 April 2014. Archived from the original on 18 April 2014. Retrieved 18 April 2014.
- Sekar, Sunitha (1 October 2023). "Chennai Metro Rail to install more solar power plants in rooftop and parking spaces". The Hindu. Archived from the original on 17 January 2024. Retrieved 17 January 2024.
- Sekar, Sunitha (10 August 2014). "First underground Metro network by December 2015". The Hindu. Archived from the original on 15 February 2016. Retrieved 4 October 2014.
- "Metro's underground frame" (PDF). Chennai Metro Rail Limited. 20 September 2013. Archived (PDF) from the original on 26 December 2023. Retrieved 1 December 2023.
- "Metro Phase 1 extension tunneling nears completion". The Hindu. 25 September 2017. Archived from the original on 26 February 2020. Retrieved 29 September 2017.
- "CMRL's compact stations have their own fan club". The Hindu. Chennai. 29 June 2018. Archived from the original on 30 January 2020. Retrieved 15 July 2018.
- Chennai Metro Investment Project (PDF) (Report). Asian Development Bank. Archived (PDF) from the original on 4 June 2023. Retrieved 30 August 2023.
- Sekar, Sunitha (20 January 2014). "No clarity on access at Chennai Metro stations yet, say disabled". The Hindu. Archived from the original on 4 February 2014. Retrieved 6 June 2016.
- Parking Facilities Availability 2018 (PDF) (Report). Chennai Metro Rail Limited. Archived (PDF) from the original on 8 June 2019. Retrieved 16 August 2010.
- Sekar, Sunitha (5 September 2017). "CMRL takes the fight to birds". The Hindu. Archived from the original on 6 September 2017. Retrieved 30 September 2017.
- Sekar, Sunitha (16 July 2014). "Chennai Metro to get a second depot". The Hindu. Archived from the original on 15 February 2016. Retrieved 4 October 2014.
- Sekar, Sunitha (5 May 2018). "Metro Rail extension gathers pace". The Hindu. Archived from the original on 26 February 2020. Retrieved 12 May 2018.
- "Contract Agreement Signed for construction of Operation Control Centre at Madhavaram Depot of CMRL Phase II" (PDF) (Press release). Chennai Metro Rail Limited. 20 July 2023. Retrieved 1 May 2024.
- "Single train trip to equal 160 buses, 3000 cars and 6000 bikes". The Hindu. 29 August 2012. Archived from the original on 30 August 2012. Retrieved 1 December 2023.
- Timings of Chennai Metro Rail As of January 2022 (PDF). Chennai Metro Rail (Report). Archived (PDF) from the original on 25 January 2022.
- Karthikeyan, K. (26 July 2014). "High tech control room for Chennai metro". Deccan Chronicle. Archived from the original on 4 October 2014. Retrieved 4 October 2014.
- https://chennaimetrorail.org/wp-content/uploads/2024/01/Press-Release-02.01.2024-English.pdf
- Sekar, Sunitha (11 February 2019). "Chennai Metro: Now, ride from Washermanpet to airport takes just 40 minutes". The Hindu. Archived from the original on 27 March 2019. Retrieved 11 February 2019.
- Chennai Metro fare table (PDF) (Report). Chennai Metro Rail Limited. Archived (PDF) from the original on 16 December 2023. Retrieved 6 November 2023.
- "Tickets issued by CMRL". Chennai Metro Rail Limited. Archived from the original on 6 September 2019. Retrieved 6 November 2019.
- "Chennai Metro to issue printed QR code tickets". The Times of India. 24 October 2021. Archived from the original on 27 April 2022. Retrieved 27 April 2022.
- "City metro rides second most expensive in India". The Times of India. Archived from the original on 5 January 2018. Retrieved 4 January 2018.
External links
Navigation boxes related to Chennai Metro | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|