Revision as of 08:54, 5 January 2025 editChongkian (talk | contribs)Autopatrolled, Event coordinators, Extended confirmed users374,934 edits ←Created page with '{{Short description|Landfill in Songino Khairkhan, Ulaanbaatar, Mongolia}} {{Use dmy dates|date=January 2025}} {{Infobox venue | name = Ulaanchuluut Landfill | native_name = Улаанчулуутын хогийн цэг | native_name_lang = mn | nickname = | logo_image = | logo_size = | logo_upright = | logo_alt = | logo_caption = | image...' | Latest revision as of 09:38, 5 January 2025 edit undoChongkian (talk | contribs)Autopatrolled, Event coordinators, Extended confirmed users374,934 edits change to a more specific category per WP:CAT | ||
(3 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
{{Infobox venue | {{Infobox venue | ||
| name = Ulaanchuluut Landfill | | name = Ulaanchuluut Landfill | ||
| native_name = Улаанчулуутын |
| native_name = Улаанчулуутын Хогийн Цэг | ||
| native_name_lang = mn | | native_name_lang = mn | ||
| nickname = | | nickname = | ||
Line 74: | Line 74: | ||
}} | }} | ||
The '''Ulaanchuluut Landfill''' ({{langx|mn|Улаанчулуутын |
The '''Ulaanchuluut Landfill''' ({{langx|mn|Улаанчулуутын Хогийн Цэг}}) is a former ] in ], ], ]. | ||
==History== | ==History== | ||
In 2020, around 8 hectares of the landfill was turned into a green park. In 2022, solid waste recycling plant was constructed at the site.<ref name="B., Anktuya, 12 August 2020">{{cite news|last=B.|first=Ankhtuya|date=12 August 2020|url=https://news.mn/en/793808/|title=Turning UB's largest rubbish dump into a Green Park|work=News.mn|access-date=5 January 2025}}</ref> The landfill reached its maximum capacity and was closed down in 2024.<ref>{{cite news|last=B.|first=Ganchimeg|date=13 April 2023|url=https://montsame.mn/en/read/316654|title=Construction and Demolition Waste Recycling Plant to be Completed in 2024|work=Mongolian National News Agency|access-date=5 January 2025}}</ref> | The landfill used to be the place for many ]s collected waste manually to be resold.<ref>{{cite news|last=Hernndez|first=Javier C.|date=3 October 2017|url=https://www.todayonline.com/world/asia/life-inside-mongolias-swelling-slums|title=Life inside Mongolia's swelling slums|work=Today Online|access-date=5 January 2025}}</ref> In 2020, around 8 hectares of the landfill was turned into a green park. In 2022, solid waste recycling plant was constructed at the site.<ref name="B., Anktuya, 12 August 2020">{{cite news|last=B.|first=Ankhtuya|date=12 August 2020|url=https://news.mn/en/793808/|title=Turning UB's largest rubbish dump into a Green Park|work=News.mn|access-date=5 January 2025}}</ref> The landfill reached its maximum capacity and was closed down in 2024.<ref>{{cite news|last=B.|first=Ganchimeg|date=13 April 2023|url=https://montsame.mn/en/read/316654|title=Construction and Demolition Waste Recycling Plant to be Completed in 2024|work=Mongolian National News Agency|access-date=5 January 2025}}</ref> | ||
==Technical specifications== | ==Technical specifications== | ||
Line 91: | Line 91: | ||
] | ] | ||
] | ] | ||
⚫ | ] | ||
] | ] | ||
⚫ | ] |
Latest revision as of 09:38, 5 January 2025
Landfill in Songino Khairkhan, Ulaanbaatar, Mongolia
Улаанчулуутын Хогийн Цэг | |
Address | Ulaanbaatar Mongolia |
---|---|
Location | Songino Khairkhan |
Coordinates | 47°56′54.2″N 106°47′24.9″E / 47.948389°N 106.790250°E / 47.948389; 106.790250 |
Type | landfill |
Surface | 10 hectares |
Closed | 2024 |
The Ulaanchuluut Landfill (Mongolian: Улаанчулуутын Хогийн Цэг) is a former landfill in Songino Khairkhan District, Ulaanbaatar, Mongolia.
History
The landfill used to be the place for many waste collectors collected waste manually to be resold. In 2020, around 8 hectares of the landfill was turned into a green park. In 2022, solid waste recycling plant was constructed at the site. The landfill reached its maximum capacity and was closed down in 2024.
Technical specifications
The landfill has a total area of 10 hectares. It used to collect waste from Bayangol, Chingeltei, Nalaikh, Songinokhairkhan and Sükhbaatar districts.
See also
References
- Hernndez, Javier C. (3 October 2017). "Life inside Mongolia's swelling slums". Today Online. Retrieved 5 January 2025.
- ^ B., Ankhtuya (12 August 2020). "Turning UB's largest rubbish dump into a Green Park". News.mn. Retrieved 5 January 2025.
- B., Ganchimeg (13 April 2023). "Construction and Demolition Waste Recycling Plant to be Completed in 2024". Mongolian National News Agency. Retrieved 5 January 2025.
- "The Study on Solid Waste Management Plan for Ulaanbaatar City in Mongolia" (PDF). JICA. Retrieved 5 January 2025.