Revision as of 23:42, 5 October 2013 editSaberwyn (talk | contribs)Autopatrolled, Pending changes reviewers, Rollbackers36,616 edits add and shuffle images← Previous edit | Revision as of 05:04, 9 November 2013 edit undoSaberwyn (talk | contribs)Autopatrolled, Pending changes reviewers, Rollbackers36,616 edits remove excess infobox fields, add info and citeNext edit → | ||
Line 10: | Line 10: | ||
|Ship name=SPS ''Cantabria'' | |Ship name=SPS ''Cantabria'' | ||
|Ship namesake= | |Ship namesake= | ||
|Ship owner= | |||
|Ship operator= | |||
|Ship registry= | |||
|Ship route= | |||
|Ship ordered=July 2005 | |Ship ordered=July 2005 | ||
|Ship awarded= | |Ship awarded= | ||
|Ship builder= | |Ship builder=], Cadiz | ||
|Ship original cost=€238m<ref name=PEAs /> (~US$300m) | |Ship original cost=€238m<ref name=PEAs /> (~US$300m) | ||
|Ship yard number= | |Ship yard number= | ||
Line 29: | Line 25: | ||
|Ship recommissioned= | |Ship recommissioned= | ||
|Ship decommissioned= | |Ship decommissioned= | ||
|Ship maiden voyage= | |||
|Ship in service= | |||
|Ship out of service= | |||
|Ship renamed= | |||
|Ship reclassified= | |||
|Ship refit= | |||
|Ship struck= | |||
|Ship reinstated= | |||
|Ship homeport= | |Ship homeport= | ||
|Ship identification= | |Ship identification= | ||
Line 48: | Line 36: | ||
}} | }} | ||
{{Infobox ship characteristics | {{Infobox ship characteristics | ||
|Hide header= | |||
|Header caption= | |||
|Ship class= | |Ship class= | ||
|Ship type=Replenishment oiler | |Ship type=Replenishment oiler | ||
Line 56: | Line 42: | ||
|Ship beam={{convert|23|m}} | |Ship beam={{convert|23|m}} | ||
|Ship draught={{convert|8|m}} | |Ship draught={{convert|8|m}} | ||
|Ship draft= | |||
|Ship depth= | |||
|Ship hold depth= | |||
|Ship decks= | |||
|Ship deck clearance= | |||
|Ship ramps= | |||
|Ship ice class= | |||
|Ship power= | |||
|Ship propulsion=2 diesel engines, 10,890 kW, single propeller shaft, controllable-pitch propeller | |Ship propulsion=2 diesel engines, 10,890 kW, single propeller shaft, controllable-pitch propeller | ||
|Ship speed={{convert|20|kn}} sustained | |Ship speed={{convert|20|kn}} sustained | ||
Line 73: | Line 51: | ||
|Ship EW= | |Ship EW= | ||
|Ship armament= | |Ship armament= | ||
|Ship armour= | |||
|Ship armor= | |||
|Ship aircraft=2-3 helicopters | |Ship aircraft=2-3 helicopters | ||
|Ship aircraft facilities= | |Ship aircraft facilities= | ||
Line 95: | Line 71: | ||
] | ] | ||
On 3 July 2012, the Australian and Spanish governments signed an agreement to deploy ''Cantabria'' in support of the ] during 2013.<ref name=Ing>{{cite journal |last=Ing |first=David |date=4 July 2012 |title=Australia and Spain agree to share fleet tanker |journal=Jane's Defence Weekly |publisher=Jane's Information Group }}</ref> The ship |
On 3 July 2012, the Australian and Spanish governments signed an agreement to deploy ''Cantabria'' in support of the ] during 2013.<ref name=Ing>{{cite journal |last=Ing |first=David |date=4 July 2012 |title=Australia and Spain agree to share fleet tanker |journal=Jane's Defence Weekly |publisher=Jane's Information Group }}</ref> The ship operated in Australian waters from February to November 2013, was used to provide replenishment support to the Australians while the oiler {{HMAS|Success|OR 304|6}} underwent maintenance.<ref name=Ing/> While in Australian waters, ''Cantabria'' performed 63 replenishments, including 10,500 cubic metres of fuel, was involved in the first ] by an ] helicopter,<ref name=Kerr/> and participated in the ].{{citation needed|date=November 2013}} The deployment also allowed over 300 Australian personnel to train on systems similar to those in the Spanish-designed ] and ]-class ships being acquired, and allowed the Royal Australian Navy to evaluate the design as a possible replacement for its replenishment vessels.<ref name=Ing/><ref name=Kerr>{{cite news|url=http://www.australiandefence.com.au/news/cantabria-to-leave-australia-with-great-wealth-of-knowledge |title=Cantabria to leave Australia with great wealth of knowledge |last=Kerr |first=Julian |date=24 October 2013 |work=Australian Defence Magazine |accessdate=9 November 2013}}</ref> | ||
{{clear left}} | |||
==References== | ==References== |
Revision as of 05:04, 9 November 2013
Warning: Display title "Spanish oiler <i>Cantabria</i>" overrides earlier display title "Spa<i>nish oiler Cantabria</i>" (help).History | |
---|---|
Spain | |
Name | SPS Cantabria |
Ordered | July 2005 |
Builder | Puerto Real, Cadiz |
Cost | €238m (~US$300m) |
Laid down | 18 July 2007 |
Launched | 21 July 2008 |
Commissioned | 29 September 2010 |
Status | Active as of 2012 |
General characteristics | |
Type | Replenishment oiler |
Displacement | 19,500 tons |
Length | 170.4 metres (559 ft) |
Beam | 23 metres (75 ft) |
Draught | 8 metres (26 ft) |
Propulsion | 2 diesel engines, 10,890 kW, single propeller shaft, controllable-pitch propeller |
Speed | 20 knots (37 km/h; 23 mph) sustained |
Range | 6,000 nautical miles (11,000 km; 6,900 mi) |
Capacity | list error: <br /> list (help) 8,920 cubic metres of ship fuel 1,585 cubic metres of JP-5 215 cubic metres of fresh water 280 tons of ammunition 470 tons of general cargo |
Complement | 122 |
Aircraft carried | 2-3 helicopters |
SPS Cantabria (A15) is a replenishment oiler operated by the Spanish Navy. Acquired to provide logistical support for the Spanish fleet, Cantabria was commissined in 2010. Cantabria is the second-largest naval ship currently operated by the Spanish, behind the LHD Juan Carlos 1.
Design and construction
Cantabria is a replenishment oiler, referred to in Spanish as a Buque de Aprovisionamiento en Combate (BAC; Supply Ship in Combat). She was acquired to provide logistical support to the Spanish Navy during day-to-day operations, expeditionary forces or strategic projection deployments, and for humanitarian and disaster relief operations. The vessel has a displacement of 19,500 tons, is 170.4 metres (559 ft) in length, has a beam of 23 metres (75 ft), and a draught of 8 metres (26 ft). Propulsion is provided by two diesel engines, supplying 10,890 kW to a single propeller shaft, which is fitted with a controllable-pitch propeller. Cantabria has a maximum sustained speed of 20 knots (37 km/h; 23 mph), and a range of 6,000 nautical miles (11,000 km; 6,900 mi). The ship's complement is 122.
The ship's capacity includes 8,920 cubic metres of ship fuel, 1,585 cubic metres of JP-5 jet fuel, 215 cubic metres of fresh water, 280 tons of ammunition, and 470 tons of general cargo. The fuel storage areas are double-hulled. Cantabria can replenish three ships simultaneously; one on each side, plus a third vis a stern refuelling station. She can carry three Agusta-Bell AB.212, two Sikorsky SH-3 Sea King, or two NHIndustries NH90 helicopters to perform vertical replenishment.
Cantabria was laid down in the dry dock of shipyard of Puerto Real, Cadiz, on 18 July 2007; the first ship to be built there in 30 years. The ship was launched by floating on 21 July 2008, and was sponsored by Aurora Diaz Abella, the wife of Miguel Ángel Revilla, the President of the Autonomous Community of Cantabria. The ship underwent sea trials in the Bay of Cadiz from October to December 2009. She was commissioned into the Spanish Navy on 29 September 2010. The original budget was €213m but the final cost was €238m.
The design has been evaluated by foreign buyers. Canada approached Navantia to provide a design for the Joint Support Ship Project based on Cantabria, but Navantia's proposal was not successful. The Norwegian Navy has also expressed interest, but has made no formal moves.
Operational history
Between 2 and 5 July 2012, Cantabria participated alongside the frigates Álvaro de Bazán, Almirante Juan de Borbón, and Méndez Núñez, the submarine Galerna, and AV-8Bs of the 9th naval air squadron during exercise MAR-22 on the Atlantic coast of Galicia.
On 3 July 2012, the Australian and Spanish governments signed an agreement to deploy Cantabria in support of the Royal Australian Navy during 2013. The ship operated in Australian waters from February to November 2013, was used to provide replenishment support to the Australians while the oiler HMAS Success underwent maintenance. While in Australian waters, Cantabria performed 63 replenishments, including 10,500 cubic metres of fuel, was involved in the first [[vertical replenishment of an Anzac-class frigate by an MRH-90 helicopter, and participated in the International Fleet Review 2013. The deployment also allowed over 300 Australian personnel to train on systems similar to those in the Spanish-designed Hobart- and Canberra-class ships being acquired, and allowed the Royal Australian Navy to evaluate the design as a possible replacement for its replenishment vessels.
References
- ^ Ministerio de Defensa (September 2011). "Evaluación de los Programas Especiales de Armamento (PEAs)" (PDF) (in Spanish). Madrid: Grupo Atenea. Retrieved 30 September 2012.
- ^ Ing, David (4 July 2012). "Australia and Spain agree to share fleet tanker". Jane's Defence Weekly. Jane's Information Group.
- ^ Kerr, Julian (24 October 2013). "Cantabria to leave Australia with great wealth of knowledge". Australian Defence Magazine. Retrieved 9 November 2013.