Revision as of 01:43, 4 April 2014 edit50.14.142.33 (talk) →21st-century expansion← Previous edit | Revision as of 14:00, 4 April 2014 edit undoEpicgenius (talk | contribs)Autopatrolled, Extended confirmed users, Page movers, File movers, IP block exemptions, Mass message senders, New page reviewers, Pending changes reviewers, Rollbackers331,085 edits →ProvisionsNext edit → | ||
Line 32: | Line 32: | ||
*There is allegedly a subway tunnel along 73rd Avenue right to Alley Pond Park. | *There is allegedly a subway tunnel along 73rd Avenue right to Alley Pond Park. | ||
*Hillside Avenue widens out considerably at Springfield Boulevard in Queens Village, and gains a very wide median. As the 1929 plan has Springfield Boulevard as the eastern terminus of the ], the wide median may have been constructed in advance for the never-built subway station there. | *Hillside Avenue widens out considerably at Springfield Boulevard in Queens Village, and gains a very wide median. As the 1929 plan has Springfield Boulevard as the eastern terminus of the ], the wide median may have been constructed in advance for the never-built subway station there. | ||
===Shells built=== | |||
The South Fourth Street shell, if complete, was supposed to handle service as follows: | |||
{| style="float:left;" | |||
| | |||
{{cot|South Fourth Street shell<ref>http://www.thejoekorner.com/scripted-s-4-display.shtm?http://www.thejoekorner.com/indsecondsystem/s4th5.gif</ref>|bg=#ffffff}}}} | |||
{|cellspacing=0 cellpadding=3 | |||
|style="border-bottom:solid 0px gray;border-top:solid 1px gray;" rowspan=3 width=50 valign=top|'''Level 1''' | |||
|style="border-bottom:solid 0px gray;border-top:solid 1px gray;" width=100|<span style="color:#{{NYCS color|default}}">'''Northbound'''</span> | |||
|style="border-bottom:solid 0px gray;border-top:solid 1px gray;" width=390|← Broadway line westbound | |||
|- | |||
|style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;" colspan=2|<center><small>]</small></center> | |||
|- | |||
|style="border-bottom:solid 0px gray;"|<span style="color:#{{NYCS color|default}}">'''Southbound'''</span> | |||
|style="border-bottom:solid 0px gray;"|<span style="color:white">←</span> Broadway line eastbound → | |||
|- | |||
|style="border-bottom:solid 0px gray;border-top:solid 1px gray;" rowspan=10 width=50 valign=top|'''Level 2''' | |||
|style="border-bottom:solid 0px gray;border-top:solid 1px gray;" width=100|<span style="color:#{{NYCS color|default}}">'''Northbound'''</span> | |||
|style="border-bottom:solid 0px gray;border-top:solid 1px gray;" width=390|← Utica Avenue express to Sixth Avenue | |||
|- | |||
|style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;" colspan=2|<center><small>]</small></center> | |||
|- | |||
|<span style="color:#{{NYCS color|default}}">'''Northbound'''</span> | |||
|← Flushing/Utica Avenues local (termination platform) | |||
|- | |||
|style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;" colspan=2|<center><small>]</small></center> | |||
|- | |||
|style="border-bottom:solid 1px gray;"|<span style="color:#{{NYCS color|default}}">'''Northbound'''</span> | |||
|style="border-bottom:solid 1px gray;"|← Flushing Avenue express to Eighth Avenue | |||
|- | |||
|<span style="color:#{{NYCS color|default}}">'''Southbound'''</span> | |||
|<span style="color:white">←</span> Flushing Avenue express from Eighth Avenue → | |||
|- | |||
|style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;" colspan=2|<center><small>]</small></center> | |||
|- | |||
|<span style="color:#{{NYCS color|default}}">'''Southbound'''</span> | |||
|<span style="color:white">←</span> Flushing/Utica Avenues local → | |||
|- | |||
|style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;" colspan=2|<center><small>]</small></center> | |||
|- | |||
|style="border-bottom:solid 0px gray;"|<span style="color:#{{NYCS color|default}}">'''Southbound'''</span> | |||
|style="border-bottom:solid 0px gray;"|<span style="color:white">←</span> Utica Avenue express from Sixth Avenue → | |||
|- | |||
|style="border-bottom:solid 1px gray;border-top:solid 1px gray;" rowspan=4 width=50 valign=top|'''Level 3''' | |||
|style="border-bottom:solid 0px gray;border-top:solid 1px gray;" width=100|<span style="color:#{{NYCS color|default}}">'''Southbound'''</span> | |||
|style="border-bottom:solid 0px gray;border-top:solid 1px gray;" width=390|<span style="color:white">←</span> Utica Avenue local → | |||
|- | |||
|style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px gray;" colspan=2|<center><small>]</small></center> | |||
|- | |||
|style="border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;" colspan=2|<center><small>]</small></center> | |||
|- | |||
|style="border-bottom:solid 1px gray;"|<span style="color:#{{NYCS color|default}}">'''Southbound'''</span> | |||
|style="border-bottom:solid 1px gray;"|<span style="color:white">←</span> Utica Avenue local → | |||
|} | |||
{{cob}} | |||
The Utica Avenue station shell, if complete, would be in the standard local-express-express-local platform configuration. | |||
===Details=== | ===Details=== |
Revision as of 14:00, 4 April 2014
Main article: History of the New York City SubwaySince the opening of the original New York City Subway line in 1904, various official and planning agencies have proposed numerous extensions to the subway system. One of the better known proposals was the "Second System," which was part of a plan by the Independent Subway to construct new subway lines in addition and take over existing subway lines and railroad right-of-ways. Though most of the routes proposed over the decades have never seen construction, discussion remains strong to develop some of these lines, to alleviate existing subway capacity constraints and overcrowding, the most notable being the Second Avenue Subway.
Triborough System
This was a proclamation for new subway lines to the Bronx and Brooklyn. These lines are the IRT Lexington Avenue Line, IRT Pelham Line and IRT Jerome Avenue Line. The Manhattan Bridge line described below later became the BMT Fourth Avenue Line, the BMT West End Line, the BMT Sea Beach Line, and the Nassau Street loops.
The route of the new subway … comprises a main trunk north and south through Manhattan Borough on Lexington Avenue and Irving Place from the Harlem River to Tenth St. and on Broadway, Vesey and Church Sts. from Tenth St. to the Battery; two branches in Bronx Borough, one northeast via 138th St. Southern Boulevard and Westchester Ave. to Pelham Bay Park. the other northerly via River Ave. and Jerome Ave.. to Woodlawn Road, connecting with the Manhattan trunk by a tunnel under the Harlem River; a Manhattan-Brooklyn line extending from the North River via Canal Street across the East River on the Manhattan Bridge to connect with the Fourth Avenue subway in Brooklyn now being built, which thus becomes an integral part of the larger system; two branches southerly from the Fourth Ave. line extending south to Fort Hamilton and southeast to Coney Island; and a loop feeder line in Brooklyn through Lafayette Ave. and Broadway, connecting with the Fourth Ave. line at one end. and at the other crossing the Williamsburg Bridge and entering the Centre Street Loop subway in Manhattan which is thus also incorporated in the system.
1929 plan
Before unification in 1940, the City of New York made plans for expanding the Subway system. The first one, conceived in 1929, was to be part of the city-operated Independent Subway System (IND). By 1939, with unification planned, all three systems were included. Very few of these far-reaching lines were built, though provisions were made for future expansion on lines that intersect the proposals. The core Manhattan lines of the expansion were the Second Avenue Line (with an extension into the Bronx) and the Worth Street Line (connecting to the Rockaways). The Rockaways were eventually served by the subway via a city takeover of the Long Island Rail Road's Rockaway Beach Branch, which was also in the 1939 plans; the Second Avenue Subway is under construction as of 2014 and scheduled for passenger service in late 2016. It is notable that the majority of the proposed lines were to be built as elevated subways, likely a cost-cutting measure. The majority of the expansion was to occur in Queens, with the original proposal suggesting 52 miles of track be built in Queens alone.
Provisions
The following provisions were made for connections and transfers to the new lines:
- At Second Avenue on the IND Sixth Avenue Line, a large open space was built above for the four-track IND Second Avenue Line. When the Second Avenue Line station is built, however, it won't use this space.
- At East Broadway on the IND Sixth Avenue Line (under Rutgers Street here), part of a two-track station was built for the IND Worth Street Line under East Broadway, above the existing line. This is now part of the mezzanine.
- At Broadway on the IND Crosstown Line, traces of stairways are visible going up to a six-track station on the line to Utica Avenue.
- At Utica Avenue on the IND Fulton Street Line, a four-track station above can be seen in the ceiling of the existing station. The existing mezzanine passes over the unused space. This was intended for the proposed Utica Avenue line towards Sheepshead Bay.
- At Roosevelt Avenue on the IND Queens Boulevard Line, a two-track upper level was built for the Winfield Spur towards the line to the Rockaways. Unlike the other stations, this one was completed, except for track.
- A junction was built on the IND Queens Boulevard Line for the line under Van Wyck Boulevard. The junction was completed and has been connected to the IND Archer Avenue Line.
- The express tracks on the IND Sixth Avenue Line dead end at the curve into Essex Street; these were planned to continue towards the Rockaways.
- A line to the Rockaways would have split from the IND Eighth Avenue Line (under Church Street here), east under Worth Street. The junction was built and is used by the local tracks to World Trade Center.
- The tracks that the IND 63rd Street Line uses to split from the IND Sixth Avenue Line were built for a similar proposed line under 61st Street to the Second Avenue Subway.
- The completed IND 63rd Street Line, which the F and <F> train uses to cross the East River, was designed and built with bell mouths to allow for the construction of connections to the planned Second Avenue Subway for service to/from the north and south along Second Avenue. Those bellmouths will be used in later construction, unlike other Second System bellmouths.
- East of 63rd Drive – Rego Park on the IND Queens Boulevard Line, bellmouths were built for a proposed connection to the LIRR's Rockaway Beach Branch.
- The upper level relay tracks east of 179th Street on the IND Queens Boulevard Line were intended to continue towards Floral Park.
- East of 21st Street – Queensbridge, before the IND 63rd Street Line connects to the IND Queens Boulevard Line, the tracks veer left while the tunnel wall goes straight. The bellmouths were part of a proposed super-express bypass running under the LIRR mainline between Queens Boulevard and Forest Hills. This plan was not in the original Second System plan, but rather, in a 1950s plan that had the tracks from 21st Street – Queensbridge go straight to Forest Hills.
- The relay tracks east of Euclid Avenue on the IND Fulton Street Line were intended to continue towards Cambria Heights in Queens. As late as 1951, these relay tracks were still planned to go as far as 105th Street, with a connection to the IND Rockaway Line east of Cross Bay Boulevard.
- A skylight is rumored to exist at the northeast corner of Pitkin Avenue and 80th Street, supposedly for the cancelled IND Fulton Street Line extension.
- A proposed subway station located at Jamaica Avenue below 212th Street in Queens Village probably also has skylights on the sidewalk along 212th Street and Jamaica Avenue.
- There is allegedly a subway tunnel along 73rd Avenue right to Alley Pond Park.
- Hillside Avenue widens out considerably at Springfield Boulevard in Queens Village, and gains a very wide median. As the 1929 plan has Springfield Boulevard as the eastern terminus of the IND Queens Boulevard Line, the wide median may have been constructed in advance for the never-built subway station there.
Shells built
The South Fourth Street shell, if complete, was supposed to handle service as follows:
The Utica Avenue station shell, if complete, would be in the standard local-express-express-local platform configuration. DetailsThe first plan was made on September 15, 1929 (before the IND even opened), and is detailed in the table below. Cost is only for construction, and doesn't include land acquisition or other items.
Planned services
1929–1940 plansLater plans included the following:
An earlier plan in 1920 had an even more expansive plan, with several dozen subway lines going across all five boroughs. 1941–1999 plans1951In 1951, a plan was put forth to the New York Board of Transportation. Many things were planned:
1968Main article: Program for ActionSimilar plans were made by the NYCTA in 1968. They included:
1998In 1998, an extension of the BMT Astoria Line to LaGuardia Airport was planned, but the plan was canceled in 2003 following community opposition. KML file (edit • help) Template:Attached KML/Proposed New York City Subway expansion (1968)KML is not from Wikidata21st-century expansionSince the 2000s, the New York City Subway has undergone its biggest expansion program since the late 1960s. With at least four stations under construction and up to 15 more subway stations definitively planned, the expansion plan pales in comparison to the IND Second System plans and the 1968 expansion plan noted above. 7 Subway ExtensionMain article: 7 Subway ExtensionThe 7 Subway Extension — Hudson Yards Rezoning and Development Program is the plan to extend the IRT Flushing Line of the New York City Subway, which carries the 7 local and <7> express services, further westward into the New York City borough of Manhattan. The extension stretches a total of 1 mile (1.6 km) from its current terminus at Times Square to a new western terminus at 34th Street and 11th Avenue. However, the tunnels are actually 1.5 miles (2.4 km) long. A second station at 10th Avenue – 41st Street was dropped from the plans in October 2007, but could be restored if funding can be found. The extension's opening had been delayed to June 2014, with the rest of the 34th Street station to open at the end of 2015. Michael Horodniceanu, chief of MTA Construction Company, told The New York Times that complications in the installation of the inclined elevator would likely cause a further delay of about three months, bringing the opening date to very late summer or early fall of 2014. Further complications in February 2014 brought the projected date of the opening to November 2014. Second Avenue SubwayThe Second Avenue Subway (SAS) is a planned rapid transit subway line, part of the New York City Subway system. As of 2013, Phase I, consisting of two miles (3.2 km) of tunnel and three stations, is under construction underneath Second Avenue in the borough of Manhattan, and is slated for completion in December 2016. The most recent and financially secure construction plan was launched when a tunnelling contract was awarded to the consortium of Schiavone/Shea/Skanska (S3) by the Metropolitan Transportation Authority (MTA) on March 20, 2007. This followed preliminary engineering and a final tunnel design completed by a joint venture between AECOM and Arup. Parsons Brinckerhoff is the Construction Manager of the project. This contract, and the full funding grant agreement with the Federal Transit Administration, which was received in November 2007, is for Phase I of the project, a new line between the existing BMT 63rd Street Line and 96th Street and Second Avenue. The total cost of the 8.5-mile (13.7 km) line is expected to top $17 billion. A ceremonial ground-breaking for the Second Avenue Subway was held on April 12, 2007; the contractor prepared the initial construction site at 96th Street on April 23, 2007. A tunnel boring machine (TBM) was originally expected to arrive six to eight months after construction began, but the utility relocation and excavation required to create its "launch box" delayed its deployment until May 2010. By May 2010, the TBM launch box was complete, and on May 14, 2010, MTA's contractors completed the TBM installation and turned it on. On March 28, 2011, S3, having completed the west tunnel to 65th Street, began drilling for the east tunnel. The TBM completed its run to the 63rd Street station's bellmouth on September 22, 2011. Triboro RXSee also: New York Connecting Railroad and Bay Ridge BranchA proposal for the LIRR Bay Ridge Branch would have the New York City Subway use the tracks to link Brooklyn, Queens, and the Bronx via the Hell Gate Bridge. In 1996 the Regional Plan Association conducted a study to determine the feasibility of the rail link. Based on Paris's RER commuter rail system, the Triboro RX proposal will create a loop around the city. It was first proposed by the Regional Plan Association in 1996, and has been denounced as disastrous by some. The proposed line, discussion of which was revived in 2012, would connect to all non-shuttle subway services. Obstacles for the proposal include the proposed Cross-Harbor Rail Tunnel, the lack of electrification on the line, and the single-tracking in some parts of the line. Additionally, there is debate on where the line's northern terminus would be: some project it to end at Hunts Point, while others plan the line to end at Yankee Stadium. Other plansSome plans call for the IND Rockaway Line to be extended along the right-of-way of the LIRR Rockaway Beach Branch, as the success of a new racino at Aqueduct Racetrack led to a proposal from Governor Andrew Cuomo to build a massive convention center in the vicinity. Talks of reactivating the line were publicly endorsed in February 2012 by Assemblymen Phillip Goldfeder and Michael G. Miller. Goldfeder commented “The commute for people here is only going to go from bad to worse. You can’t talk about a convention center without talking about transportation.” Goldfeder and Miller said they are not opposed to turning sections of the line into a park, but said people who live in Rockaway, Ozone Park and other areas have no quick or easy way to get into Manhattan. The Genting Group, which operates the racino and has been asked to construct the convention center, are evaluating several plans to increase transportation access. Genting is committed to paying for part of the transportation improvements. Queensway advocates are against resumption of rail service, stating that current bus service fills current transportation needs in the area. Congressmen Hakeem Jeffries and Gregory Meeks added their support for the project in March 2013. Both representatives will push to allocate federal transportation subsidies to study a plan for restored passenger service. The BMT Astoria Line extension to LaGuardia Airport is again being considered as part of LaGuardia's long-range expansion/renovation plan. Currently, no New York City Subway routes service the airport directly, but provisions for a subway connection are part of a 2014 long range rebuilding plan by the MTA. LegacyReferences
Further reading
External linksKML file (edit • help) Template:Attached KML/Proposed New York City Subway expansion (1929–40)KML is not from Wikidata
|