Revision as of 01:58, 21 October 2024 editLibStar (talk | contribs)Extended confirmed users, Pending changes reviewers, Rollbackers115,078 editsm →World War II← Previous edit | Latest revision as of 09:18, 1 January 2025 edit undo27.110.173.95 (talk) →Expansion and contemporary history: fixed typoTags: Mobile edit Mobile web edit | ||
(14 intermediate revisions by 10 users not shown) | |||
Line 46: | Line 46: | ||
==History== | ==History== | ||
===World War II=== | ===World War II=== | ||
The airport was built by American ] during the World War II from August 1942 to September 1944.{{ |
The airport was built by American ] during the World War II from August 1942 to September 1944.{{citation needed|date=October 2024}} It was used to accommodate large Japanese transport aircraft to complement the grass airstrip south of the present-day location of NCCC Mall Palawan in Lacao Street. The airstrip was constructed by hand by the POWs using crushed corals for illuminating night landings. The finished airfield has an area of {{convert|7,200|by|675|ft|m|sp=us|order=flip}} with two runways.{{citation needed|date=October 2024}} | ||
On December 14, 1944, occupying Japanese soldiers herded 150 remaining American POWs that constructed the airstrip into air raid trenches, doused them with gasoline, set them afire, then machine-gunned and bayoneted them to death.{{ |
On December 14, 1944, occupying Japanese soldiers herded 150 remaining American POWs that constructed the airstrip into air raid trenches, doused them with gasoline, set them afire, then machine-gunned and bayoneted them to death.{{citation needed|date=October 2024}} Among them was Army Capt. Fred Bruni, the Palawan POWs’ senior officer, who was from Janesville, Wisconsin with the ]. Only eleven men escaped the ] to be rescued by guerrillas. The story of their ordeal persuaded ] that the rumored order for the retreating Japanese to "kill all" prisoners was being implemented, thus his rush to liberate the Philippines.{{citation needed|date=October 2024}} | ||
] units based at this airstrip included the 71st Sentai Squadron (September 1944 – Early 1945).<ref name="wwii-history">{{Cite web|title=Puerto Princesa Airfield (Palawan) |url=https://pacificwrecks.com/airfields/philippines/puerto_princesa/index.html |website=Pacific Wrecks |access-date=21 November 2022}}</ref> | ] units based at this airstrip included the 71st Sentai Squadron (September 1944 – Early 1945).<ref name="wwii-history">{{Cite web|title=Puerto Princesa Airfield (Palawan) |url=https://pacificwrecks.com/airfields/philippines/puerto_princesa/index.html |website=Pacific Wrecks |access-date=21 November 2022}}</ref> | ||
Line 56: | Line 56: | ||
After liberation of the Palawan in April 1945, a number of US Army Air Forces units were stationed at the airport facility. These included the ] <!--headquarters--> (1 March 1945 – November 1945), ] (March 1945 – January 1946), ] (6 March – December 1945), ] (6 March 1945 – 10 January 1946), and the ] (DET) (9–19 June 1945).<ref name="wwii-history" /> | After liberation of the Palawan in April 1945, a number of US Army Air Forces units were stationed at the airport facility. These included the ] <!--headquarters--> (1 March 1945 – November 1945), ] (March 1945 – January 1946), ] (6 March – December 1945), ] (6 March 1945 – 10 January 1946), and the ] (DET) (9–19 June 1945).<ref name="wwii-history" /> | ||
US Army and Navy Engineers of the ] and the ] immediately rehabilitated the facility and completed as a military airbase in March 1945.<ref name="wwii-history" /> The Army and Navy engineers expanded the airfield, strengthening the runway by laying steel ]s and concrete, adding air control facilities and tanks to store oil and aviation fuel. | US Army and Navy Engineers of the ] and the ] immediately rehabilitated the facility and completed as a military airbase in March 1945.<ref name="wwii-history" /> The Army and Navy engineers expanded the airfield, strengthening the runway by laying steel ]s and concrete, adding air control facilities and tanks to store oil and aviation fuel.{{citation needed|date=October 2024}} | ||
] opened to air travel as early as 1947. The first scheduled route, operated by ] (PAL), was from ] to Puerto Princesa via San Jose, ] and vice versa. The flight was scheduled during Wednesdays utilizing the ] aircraft. During the early 1960s, Puerto Princesa catered its first direct flight from Manila using the ] aircraft and welcomed its first jet service via ] by the late 1970, both of which are operated by PAL.<ref>{{Cite web|url=https://www.timetableimages.com/ttimages/pr.htm|title = Philippine Airlines - PAL}}</ref> By the late 1990s, Puerto Princesa Airport welcomed its first wide-body aircraft service with ] dubbed as the "Love Bus" operated by PAL. | ] opened to air travel as early as 1947. The first scheduled route, operated by ] (PAL), was from ] to Puerto Princesa via San Jose, ] and vice versa. The flight was scheduled during Wednesdays utilizing the ] aircraft. During the early 1960s, Puerto Princesa catered its first direct flight from Manila using the ] aircraft and welcomed its first jet service via ] by the late 1970, both of which are operated by PAL.<ref>{{Cite web|url=https://www.timetableimages.com/ttimages/pr.htm|title = Philippine Airlines - PAL}}</ref> By the late 1990s, Puerto Princesa Airport welcomed its first wide-body aircraft service with ] dubbed as the "Love Bus" operated by PAL.{{citation needed|date=October 2024}} | ||
===Expansion and contemporary history=== | ===Expansion and contemporary history=== | ||
] | ] | ||
To meet the growing air transportation demands of Puerto Princesa and the province of Palawan, in 2014, the Department of Transportation (DOTr) awarded a $82.9-million ({{Philippine peso|2.616 billion}}) contract to the joint venture of Kumho Industrial Co. Ltd. and GS Engineering & Construction for the construction of new passenger terminal and cargo terminal building, a new apron, connecting taxiways, new state-of-the-art air navigation system, and other support facilities in compliance with the international civil aviation standards set by the ] (ICAO).<ref name="kumho" /> The new terminal was officially inaugurated on May 3, 2017 and opened for commercial operations on the next day.<ref>{{Cite web|title=Puerto Princesa International Airport Terminal opens on May 4 - Palawan News|url=http://palawan-news.com/puerto-princesa-international-airport-terminal-opens-may-4/|publisher=Palawan News|language=en|access-date=2017-05-03|archive-url=https://web.archive.org/web/20180220033245/http://palawan-news.com/puerto-princesa-international-airport-terminal-opens-may-4/|archive-date=2018-02-20|url-status=dead}}</ref> | To meet the growing air transportation demands of Puerto Princesa and the province of Palawan, in 2014, the Department of Transportation (DOTr) awarded a $82.9-million ({{Philippine peso|2.616 billion}}) contract to the joint venture of Kumho Industrial Co. Ltd. and GS Engineering & Construction for the construction of new passenger terminal and cargo terminal building, a new apron, connecting taxiways, new state-of-the-art air navigation system, and other support facilities in compliance with the international civil aviation standards set by the ] (ICAO).<ref name="kumho" /> The new terminal was officially inaugurated on May 3, 2017, and opened for commercial operations on the next day.<ref>{{Cite web|title=Puerto Princesa International Airport Terminal opens on May 4 - Palawan News|url=http://palawan-news.com/puerto-princesa-international-airport-terminal-opens-may-4/|publisher=Palawan News|language=en|access-date=2017-05-03|archive-url=https://web.archive.org/web/20180220033245/http://palawan-news.com/puerto-princesa-international-airport-terminal-opens-may-4/|archive-date=2018-02-20|url-status=dead}}</ref> | ||
Between 2013 and 2014, MASwings operated flight routes to ], ].<ref>{{cite news |url=https://business.inquirer.net/153725/travel-to-kota-kinabalu-cut-due-to-new-flights|title =Travel to Kota Kinabalu cut due to new flights|year=2013|access-date=12 April 2024|work=inquirer.net}}</ref><ref>{{cite news |url= https://www.planespotters.net/airline/MYAirline |title = MASwings drops Kuching-Mulu-Bandar Seri Begawan route|year=2014|access-date=12 April 2024|work=The Edge Malaysia}}</ref> ] operated chartered flights from ], ], and ] in 2018.<ref>{{Cite news|title=Int'l direct flights boost tourist arrivals in Puerto Princesa |first=Celeste Anna |last=Formoso |date=July 26, 2018 |url=https://www.pna.gov.ph/articles/1042735 |work=Philippine News Agency |access-date=21 November 2022}}</ref> Meanwhile, ] launched commercial international flights to the airport from ] on June 7, 2019.<ref>{{Cite news|title=Tigerair's new Taiwan – Puerto Princesa flight lands in Palawan |first=Peter |last=Policarpio |date=June 11, 2019 |url=https://palawandailynews.com/provincial-news/tigerairs-new-taiwan-puerto-princesa-flight-lands-in-palawan/ |work=Palawan Daily News |access-date=November 21, 2022}}</ref> ] also launched flights to ] from the airport on November 17 of that year.<ref>{{Cite news|title=Cebu Pacific inaugurates Palawan to Hong Kong and Clark routes |first=Sevedeo III |last=Borda |date=November 18, 2019 |url=https://palawandailynews.com/city-news/cebu-pacific-inaugurates-palawan-to-hong-kong-and-clark-routes/ |work=Palawan Daily News |access-date=November 21, 2022}}</ref> In March 2020, international flights were suspended due to the ] caused by the ], along with flights in ] and ].<ref>{{Cite news|title=Philippine capital suspends international flights |date=March 17, 2020 |first1=Arjay L. |last1=Balinbin |first2=Gillian M. |last2=Cortez |url=https://www.bworldonline.com/editors-picks/2020/03/17/284146/philippine-capital-suspends-international-flights/ |work=BusinessWorld |access-date=November 21, 2022}}</ref> | Between 2013 and 2014, ] operated flight routes to ], ].<ref>{{cite news |url=https://business.inquirer.net/153725/travel-to-kota-kinabalu-cut-due-to-new-flights|title =Travel to Kota Kinabalu cut due to new flights|year=2013|access-date=12 April 2024|work=inquirer.net}}</ref><ref>{{cite news |url= https://www.planespotters.net/airline/MYAirline |title = MASwings drops Kuching-Mulu-Bandar Seri Begawan route|year=2014|access-date=12 April 2024|work=The Edge Malaysia}}</ref> ] operated chartered flights from ], ], and ] in 2018.<ref>{{Cite news|title=Int'l direct flights boost tourist arrivals in Puerto Princesa |first=Celeste Anna |last=Formoso |date=July 26, 2018 |url=https://www.pna.gov.ph/articles/1042735 |work=Philippine News Agency |access-date=21 November 2022}}</ref> Meanwhile, ] launched commercial international flights to the airport from ] on June 7, 2019.<ref>{{Cite news|title=Tigerair's new Taiwan – Puerto Princesa flight lands in Palawan |first=Peter |last=Policarpio |date=June 11, 2019 |url=https://palawandailynews.com/provincial-news/tigerairs-new-taiwan-puerto-princesa-flight-lands-in-palawan/ |work=Palawan Daily News |access-date=November 21, 2022}}</ref> ] also launched flights to ] from the airport on November 17 of that year.<ref>{{Cite news|title=Cebu Pacific inaugurates Palawan to Hong Kong and Clark routes |first=Sevedeo III |last=Borda |date=November 18, 2019 |url=https://palawandailynews.com/city-news/cebu-pacific-inaugurates-palawan-to-hong-kong-and-clark-routes/ |work=Palawan Daily News |access-date=November 21, 2022}}</ref> In March 2020, international flights were suspended due to the ] caused by the ], along with flights in ] and ].<ref>{{Cite news|title=Philippine capital suspends international flights |date=March 17, 2020 |first1=Arjay L. |last1=Balinbin |first2=Gillian M. |last2=Cortez |url=https://www.bworldonline.com/editors-picks/2020/03/17/284146/philippine-capital-suspends-international-flights/ |work=BusinessWorld |access-date=November 21, 2022}}</ref> | ||
The largest aircraft accommodated by Puerto Princesa International Airport is a chartered ] operated by ]. | The largest aircraft accommodated by Puerto Princesa International Airport is a chartered ] operated by ]. ERE\tet of the Palawan is 2001-2006 | ||
== Structures == | == Structures == | ||
Line 74: | Line 74: | ||
The airport has a {{convert|13000|sqm|sp=us|adj=on}} two-level passenger terminal with a capacity of two million passengers annually and a seating capacity of 1,500. It was built by the joint venture of Kumho Industrial Co. Ltd. and GS Engineering & Construction. Its apron has six aircraft bays (four for ] and two for ] as large as the ], ] and ]).<ref>{{Cite news|title=New Puerto Princesa International Airport opens |url=https://news.abs-cbn.com/business/05/03/17/new-puerto-princesa-international-airport-opens |first=Jacque |last=Manabat |work=ABS-CBN News |date=May 3, 2017 |access-date=November 21, 2022}}</ref> The terminal has a ] by ]<ref>{{Cite web|title=Domestic Lounge|url=https://www.philippineairlines.com/TravelInformation/BeforeYouFly/AtTheAirport/Lounge/LoungeDomestic|access-date=2020-12-20|website=www.philippineairlines.com|language=en}}</ref> and a PAGSS Lounge.<ref>{{Cite web|title=PAGSS Lounge PPS Airport Lounges Puerto Princesa International|url=https://www.prioritypass.com/en/lounges/philippines/puerto-princesa-international/pps-pagss-lounge|access-date=2020-12-20|website=www.prioritypass.com|language=en}}</ref> The terminal also has a seating capacity of 1,500. Outside the terminal is a parking lot with a capacity of 200 cars.<ref name="newterminal">{{Cite news|title=LOOK: Puerto Princesa International Airport's new terminal |date=May 4, 2017 |url=https://www.rappler.com/business/168859-puerto-princesa-international-airport-new-terminal/ |work=Rappler |access-date=21 November 2022}}</ref> | The airport has a {{convert|13000|sqm|sp=us|adj=on}} two-level passenger terminal with a capacity of two million passengers annually and a seating capacity of 1,500. It was built by the joint venture of Kumho Industrial Co. Ltd. and GS Engineering & Construction. Its apron has six aircraft bays (four for ] and two for ] as large as the ], ] and ]).<ref>{{Cite news|title=New Puerto Princesa International Airport opens |url=https://news.abs-cbn.com/business/05/03/17/new-puerto-princesa-international-airport-opens |first=Jacque |last=Manabat |work=ABS-CBN News |date=May 3, 2017 |access-date=November 21, 2022}}</ref> The terminal has a ] by ]<ref>{{Cite web|title=Domestic Lounge|url=https://www.philippineairlines.com/TravelInformation/BeforeYouFly/AtTheAirport/Lounge/LoungeDomestic|access-date=2020-12-20|website=www.philippineairlines.com|language=en}}</ref> and a PAGSS Lounge.<ref>{{Cite web|title=PAGSS Lounge PPS Airport Lounges Puerto Princesa International|url=https://www.prioritypass.com/en/lounges/philippines/puerto-princesa-international/pps-pagss-lounge|access-date=2020-12-20|website=www.prioritypass.com|language=en}}</ref> The terminal also has a seating capacity of 1,500. Outside the terminal is a parking lot with a capacity of 200 cars.<ref name="newterminal">{{Cite news|title=LOOK: Puerto Princesa International Airport's new terminal |date=May 4, 2017 |url=https://www.rappler.com/business/168859-puerto-princesa-international-airport-new-terminal/ |work=Rappler |access-date=21 November 2022}}</ref> | ||
The new terminal replaced the {{convert|3000|sqm|sp=us|adj=on}} old passenger terminal with an annual capacity of 350,000 passengers<ref name="kumho">{{Cite news|date=May 19, 2014 |title=Kumho-GS joint venture wins Puerto Princesa Airport project in {{sic|Philli|pines|nolink=y}} |url=https://www.airport-technology.com/news/newskumho-gs-joint-venture-wins-puerto-princesa-airport-project-in-{{sic|philli|pines|hide=y}}-4272060/ |work=Airport Technology |access-date=21 November 2022}}</ref> and an apron with four parking bays.<ref name="newterminal" /> In 2019, the terminal was equipped with free WiFi for all travellers. |
The new terminal replaced the {{convert|3000|sqm|sp=us|adj=on}} old passenger terminal with an annual capacity of 350,000 passengers<ref name="kumho">{{Cite news|date=May 19, 2014 |title=Kumho-GS joint venture wins Puerto Princesa Airport project in {{sic|Philli|pines|nolink=y}} |url=https://www.airport-technology.com/news/newskumho-gs-joint-venture-wins-puerto-princesa-airport-project-in-{{sic|philli|pines|hide=y}}-4272060/ |work=Airport Technology |access-date=21 November 2022}}</ref> and an apron with four parking bays.<ref name="newterminal" /> In 2019, the terminal was equipped with free WiFi for all travellers.<ref>{{Cite web |date=2023-12-22 |title=Puerto Princesa Airport: all you need to know - Couple's Travel Stories |url=https://couplestravelstories.ca/puerto-princesa-airport/ |access-date=2023-12-22 |language=en-US}}</ref> | ||
===Runway=== | ===Runway=== | ||
Line 85: | Line 85: | ||
| ] | ], ] | | ] | ], ] | ||
<!-- --> | <!-- --> | ||
| ] | ], ],<ref name="5jcrk">{{cite web |title=Cebu Pacific Strengthens Clark Hub with Resumption of Flights to 4 Key Domestic Destinations |url=https://www.avgeek.ph/cebu-pacific-strengthens-clark-hub-with-resumption-of-flights-to-4-key-domestic-destinations |
| ] | ], ],<ref name="5jcrk">{{cite web |title=Cebu Pacific Strengthens Clark Hub with Resumption of Flights to 4 Key Domestic Destinations |url=https://www.avgeek.ph/cebu-pacific-strengthens-clark-hub-with-resumption-of-flights-to-4-key-domestic-destinations |website=AvGeek Philippines |access-date=8 July 2024}}</ref> ],<ref name="dvo5j">{{cite web |last1=Salcedo |first1=Dirk Andrei |title=Cebu Pacific links Davao with four new destinations |url=https://www.aviationupdatesph.com/2024/08/cebu-pacific-links-davao-with-four-new-destinations/ |website=Aviation Updates Philippines |access-date=6 August 2024}}</ref> ],<ref>{{cite web|url=https://www.aeroroutes.com/eng/240819-5jnw2432q|title=Cebu Pacific NW24 A321neo Domestic Network Additions|publisher=AeroRoutes|date=19 August 2024|accessdate=19 August 2024}}</ref> ] | ||
<!-- --> | <!-- --> | ||
| ] | ], ] | | ] | ], ] |
Latest revision as of 09:18, 1 January 2025
Commercial airport serving Puerto Princesa, Palawan, Philippines For the military use of this facility, see Antonio Bautista Air Base.
Puerto Princesa International Airport Paliparang Pandaigdig ng Puerto Princesa | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Summary | |||||||||||
Airport type | Public / Military | ||||||||||
Owner/Operator | Civil Aviation Authority of the Philippines | ||||||||||
Serves | Puerto Princesa | ||||||||||
Opened | 1947; 78 years ago (1947) | ||||||||||
Operating base for | Air Juan | ||||||||||
Time zone | PHT (UTC+08:00) | ||||||||||
Elevation AMSL | 22 m / 71 ft | ||||||||||
Coordinates | 09°44′31″N 118°45′32″E / 9.74194°N 118.75889°E / 9.74194; 118.75889 | ||||||||||
Map | |||||||||||
PPS/RPVPShow map of PalawanPPS/RPVPShow map of Philippines | |||||||||||
Runways | |||||||||||
| |||||||||||
Statistics (2022) | |||||||||||
| |||||||||||
Source: CAAP |
Puerto Princesa International Airport (IATA: PPS, ICAO: RPVP) is an airport serving the general area of Puerto Princesa, located in the province of Palawan in the Philippines. It is classified as an international airport by the Civil Aviation Authority of the Philippines.
The airport is the main gateway to the Puerto Princesa Underground River, a UNESCO World Heritage Site and one of the New 7 Wonders of Nature.
History
World War II
The airport was built by American prisoners of war during the World War II from August 1942 to September 1944. It was used to accommodate large Japanese transport aircraft to complement the grass airstrip south of the present-day location of NCCC Mall Palawan in Lacao Street. The airstrip was constructed by hand by the POWs using crushed corals for illuminating night landings. The finished airfield has an area of 2,195 by 206 meters (7,200 by 675 ft) with two runways.
On December 14, 1944, occupying Japanese soldiers herded 150 remaining American POWs that constructed the airstrip into air raid trenches, doused them with gasoline, set them afire, then machine-gunned and bayoneted them to death. Among them was Army Capt. Fred Bruni, the Palawan POWs’ senior officer, who was from Janesville, Wisconsin with the 192nd Tank Battalion. Only eleven men escaped the Palawan massacre to be rescued by guerrillas. The story of their ordeal persuaded General Douglas MacArthur that the rumored order for the retreating Japanese to "kill all" prisoners was being implemented, thus his rush to liberate the Philippines.
Imperial Japanese Army Air Force units based at this airstrip included the 71st Sentai Squadron (September 1944 – Early 1945).
Post-war
After liberation of the Palawan in April 1945, a number of US Army Air Forces units were stationed at the airport facility. These included the XIII Fighter Command (1 March 1945 – November 1945), 42d Bombardment Group (March 1945 – January 1946), 347th Fighter Group (6 March – December 1945), 419th Night Fighter Squadron (6 March 1945 – 10 January 1946), and the 550th Night Fighter Squadron (DET) (9–19 June 1945).
US Army and Navy Engineers of the 1897th Engineer Aviation Battalion and the 84th Naval Construction Battalion immediately rehabilitated the facility and completed as a military airbase in March 1945. The Army and Navy engineers expanded the airfield, strengthening the runway by laying steel Marston Mats and concrete, adding air control facilities and tanks to store oil and aviation fuel.
Puerto Princesa opened to air travel as early as 1947. The first scheduled route, operated by Philippine Airlines (PAL), was from Manila to Puerto Princesa via San Jose, Mindoro and vice versa. The flight was scheduled during Wednesdays utilizing the DC-3 aircraft. During the early 1960s, Puerto Princesa catered its first direct flight from Manila using the Vickers Viscount aircraft and welcomed its first jet service via BAC 1-11 by the late 1970, both of which are operated by PAL. By the late 1990s, Puerto Princesa Airport welcomed its first wide-body aircraft service with Airbus A300 dubbed as the "Love Bus" operated by PAL.
Expansion and contemporary history
To meet the growing air transportation demands of Puerto Princesa and the province of Palawan, in 2014, the Department of Transportation (DOTr) awarded a $82.9-million (₱2.616 billion) contract to the joint venture of Kumho Industrial Co. Ltd. and GS Engineering & Construction for the construction of new passenger terminal and cargo terminal building, a new apron, connecting taxiways, new state-of-the-art air navigation system, and other support facilities in compliance with the international civil aviation standards set by the International Civil Aviation Organization (ICAO). The new terminal was officially inaugurated on May 3, 2017, and opened for commercial operations on the next day.
Between 2013 and 2014, MASwings operated flight routes to Kota Kinabalu, Malaysia. Philippine Airlines operated chartered flights from China, South Korea, and Taiwan in 2018. Meanwhile, Tigerair Taiwan launched commercial international flights to the airport from Taipei on June 7, 2019. Cebu Pacific also launched flights to Hong Kong from the airport on November 17 of that year. In March 2020, international flights were suspended due to the enhanced community quarantine in Luzon caused by the COVID-19 pandemic, along with flights in Manila and Clark.
The largest aircraft accommodated by Puerto Princesa International Airport is a chartered Boeing 777-200ER operated by Omni Air International. ERE\tet of the Palawan is 2001-2006
Structures
Terminal
The airport has a 13,000-square-meter (140,000 sq ft) two-level passenger terminal with a capacity of two million passengers annually and a seating capacity of 1,500. It was built by the joint venture of Kumho Industrial Co. Ltd. and GS Engineering & Construction. Its apron has six aircraft bays (four for narrow-body aircraft and two for wide-body aircraft as large as the Airbus A330, Airbus A350 and Boeing 787). The terminal has a Mabuhay Lounge by Philippine Airlines and a PAGSS Lounge. The terminal also has a seating capacity of 1,500. Outside the terminal is a parking lot with a capacity of 200 cars.
The new terminal replaced the 3,000-square-meter (32,000 sq ft) old passenger terminal with an annual capacity of 350,000 passengers and an apron with four parking bays. In 2019, the terminal was equipped with free WiFi for all travellers.
Runway
The airport consists of a single 2,600-meter-long (8,500 ft) and 45-meter-wide (148 ft) runway running at a direction of 09°/27°. The airport shares its single runway with Antonio Bautista Air Base. The runway is equipped with an instrument landing system, runway lights, and approach landing lights making the airport capable of nighttime operations as well as low visibility landings.
Airlines and destinations
Airlines | Destinations |
---|---|
Cebgo | Cebu, Iloilo |
Cebu Pacific | Cebu, Clark, Davao, Iloilo, Manila |
PAL Express | Cebu, Manila |
Philippine Airlines | Cebu |
Philippines AirAsia | Manila |
Royal Air Philippines | Charter: Taipei–Taoyuan |
Statistics
Data from Civil Aviation Authority of the Philippines (CAAP).
Graphs are unavailable due to technical issues. Updates on reimplementing the Graph extension, which will be known as the Chart extension, can be found on Phabricator and on MediaWiki.org. |
Year | Passenger movements | Aircraft movements | Cargo movements (in kg) | |||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
Domestic | International | Total | % change | Domestic | International | Total | % change | Domestic | International | Total | % change | |
2003 | 195,975 | 0 | 195,975 | 3,346 | 0 | 3,346 | 5,001,051 | 0 | 5,001,051 | |||
2004 | 271,769 | 161 | 271,930 | 38.76 | 4,390 | 12 | 4,402 | 31.56 | 4,500,599 | — | 4,500,599 | 10.01 |
2005 | 267,778 | 0 | 267,778 | 1.53 | 3,916 | 0 | 3,916 | 11.04 | 4,744,915 | 0 | 4,744,915 | 5.43 |
2006 | 284,110 | 0 | 284,110 | 6.10 | 3,780 | 0 | 3,780 | 3.47 | 3,912,209 | 0 | 3,912,209 | 17.55 |
2007 | 392,039 | 0 | 392,039 | 37.99 | 4,538 | 0 | 4,538 | 20.05 | 4,480,615 | 0 | 4,480,615 | 14.53 |
2008 | 444,878 | 0 | 444,878 | 13.48 | 4,990 | 0 | 4,990 | 9.96 | 4,580,557 | 0 | 4,580,557 | 2.23 |
2009 | 584,186 | 0 | 584,186 | 31.31 | 4,236 | 0 | 4,236 | 15.11 | 5,439,799 | 0 | 5,439,799 | 18.76 |
2010 | 807,916 | 0 | 807,916 | 38.30 | 3,760 | 0 | 3,760 | 11.24 | 8,972,631 | 0 | 8,972,631 | 64.94 |
2011 | 988,972 | 0 | 988,972 | 22.41 | 4,248 | 0 | 4,248 | 12.98 | 9,294,017 | 0 | 9,294,017 | 3.58 |
2012 | 1,322,925 | 0 | 1,322,925 | 33.77 | 12,046 | 0 | 12,046 | 183.57 | 10,938,901 | 0 | 10,938,901 | 17.70 |
2013 | 1,357,531 | 12,894 | 1,370,425 | 3.59 | 10,512 | 2,684 | 13,196 | 9.55 | 12,699,299 | — | 12,699,299 | 16.09 |
2014 | 1,371,651 | 6,929 | 1,378,580 | 0.60 | 13,130 | 224 | 13,354 | 1.20 | 15,038,825 | — | 15,038,825 | 18.42 |
2015 | 1,564,914 | 26,804 | 1,591,718 | 15.46 | 14,222 | 184 | 14,406 | 7.88 | 14,278,467 | 133,614 | 14,412,081 | 4.17 |
2016 | 1,612,640 | 31,363 | 1,644,003 | 3.28 | 13,813 | 191 | 14,004 | 2.79 | 17,136,857 | 116,870 | 17,253,727 | 19.72 |
2017 | 1,767,157 | 22,958 | 1,790,115 | 8.89 | 15,682 | 155 | 15,837 | 13.09 | 16,173,990 | 833,190 | 17,007,180 | 1.43 |
2018 | 2,046,628 | 99,722 | 2,146,350 | 19.90 | 19,404 | 683 | 20,087 | 26.84 | 16,955,042 | 13,029 | 16,968,071 | 0.23 |
2019 | 2,019,542 | 144,189 | 2,163,731 | 0.81 | 17,423 | 1,033 | 18,456 | 8.12 | 20,042,720 | — | 20,042,720 | 18.12 |
2020 | 453,610 | 21,712 | 475,322 | 78.03 | 6,375 | 194 | 6,569 | 64.41 | 9,730,214 | — | 9,730,214 | 51.4 |
2021 | 132,420 | — | 132,420 | 72.14 | 5,801 | 9 | 5,810 | 11.55 | 13,132,851 | — | 13,132,851 | 34.97 |
2022 | 1,121,047 | 326 | 1,121,373 | 746.83 | 8,923 | 9 | 8,931 | 53.72 | 14,139,882 | — | 14,139,882 | 7.67 |
An em dash (—) is used when data from CAAP is not available.
Accidents and incidents
- On January 11, 2011, Cebu Pacific Flight 645, an Airbus A319 from Manila with 129 passengers and 6 crews on board, swerved off the runway upon landing after touchdown. Though the pilot maneuvered the aircraft back to the runway, the aircraft sustained substantial damage on its nose and main landing gear with other damages on the left and right engine fan blades, aircraft underbelly and underwings. No one on board was injured.
- On April 11, 2012, a Cebu Pacific Airbus A320 (as Flight 640 departing for Manila) clipped the wingtip of a Zest Airways Airbus A320 while sitting on the apron around 6:30 p.m. The incident severed Zest Airways' navigation lights forcing the airline to cancel their return flight to Manila.
See also
Footnotes and references
Footnotes
- Runway 09 is 2,400 meters (7,900 ft) long with a displaced threshold of 220 meters (720 ft).
References
- "Air Juan Philippine Flight Destinations". Air Juan Aviation, Inc. Archived from the original on May 23, 2018. Retrieved September 19, 2017.
- ^ "Aircraft, Passenger, and Cargo Movements". Civil Aviation Authority of the Philippines. Retrieved February 11, 2023.
- ^ "Puerto Princesa Airfield (Palawan)". Pacific Wrecks. Retrieved November 21, 2022.
- "Philippine Airlines - PAL".
- ^ "Kumho-GS joint venture wins Puerto Princesa Airport project in Phillipines [sic]". Airport Technology. May 19, 2014. Retrieved November 21, 2022.
- "Puerto Princesa International Airport Terminal opens on May 4 - Palawan News". Palawan News. Archived from the original on February 20, 2018. Retrieved May 3, 2017.
- "Travel to Kota Kinabalu cut due to new flights". inquirer.net. 2013. Retrieved April 12, 2024.
- "MASwings drops Kuching-Mulu-Bandar Seri Begawan route". The Edge Malaysia. 2014. Retrieved April 12, 2024.
- Formoso, Celeste Anna (July 26, 2018). "Int'l direct flights boost tourist arrivals in Puerto Princesa". Philippine News Agency. Retrieved November 21, 2022.
- Policarpio, Peter (June 11, 2019). "Tigerair's new Taiwan – Puerto Princesa flight lands in Palawan". Palawan Daily News. Retrieved November 21, 2022.
- Borda, Sevedeo III (November 18, 2019). "Cebu Pacific inaugurates Palawan to Hong Kong and Clark routes". Palawan Daily News. Retrieved November 21, 2022.
- Balinbin, Arjay L.; Cortez, Gillian M. (March 17, 2020). "Philippine capital suspends international flights". BusinessWorld. Retrieved November 21, 2022.
- Manabat, Jacque (May 3, 2017). "New Puerto Princesa International Airport opens". ABS-CBN News. Retrieved November 21, 2022.
- "Domestic Lounge". www.philippineairlines.com. Retrieved December 20, 2020.
- "PAGSS Lounge PPS Airport Lounges Puerto Princesa International". www.prioritypass.com. Retrieved December 20, 2020.
- ^ "LOOK: Puerto Princesa International Airport's new terminal". Rappler. May 4, 2017. Retrieved November 21, 2022.
- "Puerto Princesa Airport: all you need to know - Couple's Travel Stories". December 22, 2023. Retrieved December 22, 2023.
- "Development, Operations and Maintenance of Puerto Princesa Airport" (PDF). Public-Private Partnership Center.
- "Cebu Pacific Strengthens Clark Hub with Resumption of Flights to 4 Key Domestic Destinations". AvGeek Philippines. Retrieved July 8, 2024.
- Salcedo, Dirk Andrei. "Cebu Pacific links Davao with four new destinations". Aviation Updates Philippines. Retrieved August 6, 2024.
- "Cebu Pacific NW24 A321neo Domestic Network Additions". AeroRoutes. August 19, 2024. Retrieved August 19, 2024.
- "Aircraft Accident Investigation and Inquiry Board Aircraft Accident Report" (PDF). CAAP. Retrieved December 30, 2017.
- Dinglasan, Rouchelle R. (April 10, 2012). "Cebu Pacific nicks Zest Air plane on Palawan airport tarmac". GMA News. Retrieved November 21, 2022.
This article incorporates public domain material from the United States Air Force
External links
Airports in the Philippines (statistics) | |||||
---|---|---|---|---|---|
International | |||||
Principal (domestic) |
| ||||
Community |
| ||||
Military | |||||
Defunct | |||||
Notable unclassified | |||||
Airports in italics have not yet been opened, are under construction, or are in the planning stages. |