Misplaced Pages

Contingency allowance: Difference between revisions

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Browse history interactively← Previous editContent deleted Content addedVisualWikitext
Revision as of 17:59, 22 February 2011 editAvicAWB (talk | contribs)Extended confirmed users65,813 editsm clean up, added orphan, uncategorised tags using AWB← Previous edit Latest revision as of 16:15, 16 August 2022 edit undoJoeNMLC (talk | contribs)Extended confirmed users115,768 edits ce, add stub 
(10 intermediate revisions by 9 users not shown)
Line 1: Line 1:
The '''contingency allowance''' is the time allocated during planning for unscheduled events. Technical and personal disruptions result in changes in the indirect production costs. The contingency allowance is calculated in special ], the results of which yield rates for indirect production costs.<ref>Poeschel, Frank: Verteilzeit. In: Landau, Kurt (Hrsg.): Lexikon Arbeitsgestaltung : Best Practise im Arbeitsprozess. Stuttgart: Genter, 2007. - {{ISBN|978-3-87247-655-5}}. P. 1292.</ref> The time is usually added to the pure operations time to form a ].
{{Orphan|date=February 2011}}


The concept was developed by ].
The '''contingency allowance''' is the time allocated during planning for unscheduled events. Technical and personal disruptions result in changes in the indirect production costs. The contingency allowance is calculated in special ], the results of which yield rates for indirect production costs.<ref>Poeschel, Frank: Verteilzeit. In: Landau, Kurt (Hrsg.): Lexikon Arbeitsgestaltung : Best Practise im Arbeitsprozess. Stuttgart: Genter, 2007. - ISBN 978-3-87247-655-5. P. 1292.</ref>

The concept was developed by ].


==References== ==References==
<references /> <references />
]


{{Uncategorized|date=February 2011}}


{{business-stub}}
]
{{time-stub}}

Latest revision as of 16:15, 16 August 2022

The contingency allowance is the time allocated during planning for unscheduled events. Technical and personal disruptions result in changes in the indirect production costs. The contingency allowance is calculated in special contingency time studies, the results of which yield rates for indirect production costs. The time is usually added to the pure operations time to form a standard time in manufacturing.

The concept was developed by Charles Bedaux.

References

  1. Poeschel, Frank: Verteilzeit. In: Landau, Kurt (Hrsg.): Lexikon Arbeitsgestaltung : Best Practise im Arbeitsprozess. Stuttgart: Genter, 2007. - ISBN 978-3-87247-655-5. P. 1292.


Stub icon

This business-related article is a stub. You can help Misplaced Pages by expanding it.

Stub icon

This time-related article is a stub. You can help Misplaced Pages by expanding it.

Categories: