The '''contingency allowance''' is the time allocated during planning for unscheduled events. Technical and personal disruptions result in changes in the indirect production costs. The contingency allowance is calculated in special ], the results of which yield rates for indirect production costs.<ref>Poeschel, Frank: Verteilzeit. In: Landau, Kurt (Hrsg.): Lexikon Arbeitsgestaltung : Best Practise im Arbeitsprozess. Stuttgart: Genter, 2007. - {{ISBN|978-3-87247-655-5}}. P. 1292.</ref> The time is usually added to the pure operations time to form a ].
{{Orphan|date=February 2011}}

The '''contingency allowance''' is the time allocated during planning for unscheduled events. Technical and personal disruptions result in changes in the indirect production costs. The contingency allowance is calculated in special ], the results of which yield rates for indirect production costs.<ref>Poeschel, Frank: Verteilzeit. In: Landau, Kurt (Hrsg.): Lexikon Arbeitsgestaltung : Best Practise im Arbeitsprozess. Stuttgart: Genter, 2007. - ISBN 978-3-87247-655-5. P. 1292.</ref> The time is usually added to the pure operations time to form a ].


The concept was developed by ]. The concept was developed by ].
Line 7: Line 5:
==References== ==References==
<references /> <references />
] ]


{{business-stub}}
{{time-stub}}

Latest revision as of 16:15, 16 August 2022

The contingency allowance is the time allocated during planning for unscheduled events. Technical and personal disruptions result in changes in the indirect production costs. The contingency allowance is calculated in special contingency time studies, the results of which yield rates for indirect production costs. The time is usually added to the pure operations time to form a standard time in manufacturing.

The concept was developed by Charles Bedaux.

References

  1. Poeschel, Frank: Verteilzeit. In: Landau, Kurt (Hrsg.): Lexikon Arbeitsgestaltung : Best Practise im Arbeitsprozess. Stuttgart: Genter, 2007. - ISBN 978-3-87247-655-5. P. 1292.


Stub icon

This business-related article is a stub. You can help Misplaced Pages by expanding it.

Stub icon

This time-related article is a stub. You can help Misplaced Pages by expanding it.

Categories: