Misplaced Pages

Platform gap filler: Difference between revisions

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Browse history interactively← Previous editNext edit →Content deleted Content addedVisualWikitext
Revision as of 19:46, 1 February 2010 edit67.127.232.220 (talk) disambiguate← Previous edit Revision as of 17:16, 5 April 2010 edit undo164.55.254.106 (talk) Stations with gap fillers: add imageNext edit →
Line 8: Line 8:


==Stations with gap fillers== ==Stations with gap fillers==

]]]


IRT stations with gap fillers were: IRT stations with gap fillers were:

Revision as of 17:16, 5 April 2010

For Drop Stop gap fillers, see Drop Stop.

Gap fillers on the New York City Subway are movable platform extensions at stations where the curvature of the platform creates a significant gap between the platform and subway car door. In contrast, see "Mind the gap".

History

The Interborough Rapid Transit Company's first cars were built with only two doors on each side, at the extreme ends of the car, lining up with the curved platforms so as not to leave a wide gap between the train and the platform. When the IRT modified existing cars and ordered new cars with a middle door, gap fillers were needed because the middle door was not near the platform. After the City of New York bought the IRT in 1940, new car designs (starting with the R12) had the end doors away from the extreme ends of the carbody, which also required the use of gap fillers at certain stations.

Stations with gap fillers

The downtown bound platform at 14th Street–Union Square (IRT Lexington Avenue Line)

IRT stations with gap fillers were:

  • South Ferry, outer loop. Station closed on March 16, 2009, replaced by a new station which does not require gap fillers.
  • 14th Street–Union Square (IRT Lexington Avenue Line), downtown platform (local and express). There may have been gap fillers on the uptown express platform. A new design of gap filler was installed in 2004 to provide maintenance access from the platform rather requiring crews to stand at track level.

Manufacturers

Gap fillers are manufactured by Jaygo Incorporated and Manning & Lewis Engineering.

External links

Images:

Category: