Revision as of 09:15, 10 April 2011 editMr Sheep Measham (talk | contribs)Extended confirmed users4,053 editsm Added category← Previous edit | Revision as of 14:09, 20 February 2013 edit undoAddbot (talk | contribs)Bots2,838,809 editsm Bot: Migrating 1 interwiki links, now provided by Wikidata on d:q2518684 (Report Errors)Next edit → | ||
Line 8: | Line 8: | ||
<references /> | <references /> | ||
] | ] | ||
] |
Revision as of 14:09, 20 February 2013
This article is an orphan, as no other articles link to it. Please introduce links to this page from related articles; try the Find link tool for suggestions. (February 2011) |
The contingency allowance is the time allocated during planning for unscheduled events. Technical and personal disruptions result in changes in the indirect production costs. The contingency allowance is calculated in special contingency time studies, the results of which yield rates for indirect production costs.
The concept was developed by Charles Bedaux.
References
- Poeschel, Frank: Verteilzeit. In: Landau, Kurt (Hrsg.): Lexikon Arbeitsgestaltung : Best Practise im Arbeitsprozess. Stuttgart: Genter, 2007. - ISBN 978-3-87247-655-5. P. 1292.