Revision as of 02:42, 22 March 2017 editالحساوي (talk | contribs)Extended confirmed users2,748 edits added Category:Project management using HotCat← Previous edit | Revision as of 02:42, 22 March 2017 edit undoالحساوي (talk | contribs)Extended confirmed users2,748 edits added Category:Planning using HotCatNext edit → | ||
Line 9: | Line 9: | ||
] | ] | ||
] | ] | ||
] |
Revision as of 02:42, 22 March 2017
This article is an orphan, as no other articles link to it. Please introduce links to this page from related articles; try the Find link tool for suggestions. (February 2011) |
The contingency allowance is the time allocated during planning for unscheduled events. Technical and personal disruptions result in changes in the indirect production costs. The contingency allowance is calculated in special contingency time studies, the results of which yield rates for indirect production costs. The time is usually added to the pure operations time to form a standard time in manufacturing.
The concept was developed by Charles Bedaux.
References
- Poeschel, Frank: Verteilzeit. In: Landau, Kurt (Hrsg.): Lexikon Arbeitsgestaltung : Best Practise im Arbeitsprozess. Stuttgart: Genter, 2007. - ISBN 978-3-87247-655-5. P. 1292.