Misplaced Pages

Contingency allowance: Difference between revisions

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Browse history interactively← Previous editNext edit →Content deleted Content addedVisualWikitext
Revision as of 02:22, 3 June 2017 editMagic links bot (talk | contribs)Bots291,110 editsm Replace magic links with templates per local RfC and MediaWiki RfC← Previous edit Revision as of 20:50, 16 February 2018 edit undoMarcocapelle (talk | contribs)Extended confirmed users, Page movers557,288 edits more specific categorisationNext edit →
Line 7: Line 7:
==References== ==References==
<references /> <references />
] ]
]
]

Revision as of 20:50, 16 February 2018

This article is an orphan, as no other articles link to it. Please introduce links to this page from related articles; try the Find link tool for suggestions. (February 2011)

The contingency allowance is the time allocated during planning for unscheduled events. Technical and personal disruptions result in changes in the indirect production costs. The contingency allowance is calculated in special contingency time studies, the results of which yield rates for indirect production costs. The time is usually added to the pure operations time to form a standard time in manufacturing.

The concept was developed by Charles Bedaux.

References

  1. Poeschel, Frank: Verteilzeit. In: Landau, Kurt (Hrsg.): Lexikon Arbeitsgestaltung : Best Practise im Arbeitsprozess. Stuttgart: Genter, 2007. - ISBN 978-3-87247-655-5. P. 1292.
Categories: