Revision as of 16:46, 5 December 2020 editMndata2 (talk | contribs)Extended confirmed users21,437 edits Added detailTags: Mobile edit Mobile web edit← Previous edit | Revision as of 11:26, 13 January 2021 edit undoJohn of Reading (talk | contribs)Autopatrolled, Extended confirmed users, Pending changes reviewers767,601 editsm →History: Typo fixing, replaced: clearence → clearanceTag: AWBNext edit → | ||
Line 52: | Line 52: | ||
The centuries before the tunnel arrived, Hvalba and Trongisvágur were connected by a footpath via the Krákugjógv. Construction of the Hvalbiartunnilin started in 1961 and it opened in 1963, as the first tunnel in the country. It has always remained an unlit, one-lane tunnel, measuring 1.450 metres in length.<ref>https://www.landsverk.fo/fo-fo/borgari/kervi%C3%B0/tunlar</ref> Because of its limited clearance of 3.2 metres, it cannot handle modern-sized large vehicles, such as lorries, trailers and touringcars, which impedes transport to the rest of the island and onwards to ]. Although the tunnel has passing places at regular intervals, this hinders quick passage of the tunnel in especially the northbound direction, as these vehicles need to yield to oncoming southbound cars. The footpath is still a popular hiking route. | The centuries before the tunnel arrived, Hvalba and Trongisvágur were connected by a footpath via the Krákugjógv. Construction of the Hvalbiartunnilin started in 1961 and it opened in 1963, as the first tunnel in the country. It has always remained an unlit, one-lane tunnel, measuring 1.450 metres in length.<ref>https://www.landsverk.fo/fo-fo/borgari/kervi%C3%B0/tunlar</ref> Because of its limited clearance of 3.2 metres, it cannot handle modern-sized large vehicles, such as lorries, trailers and touringcars, which impedes transport to the rest of the island and onwards to ]. Although the tunnel has passing places at regular intervals, this hinders quick passage of the tunnel in especially the northbound direction, as these vehicles need to yield to oncoming southbound cars. The footpath is still a popular hiking route. | ||
In 2017 it was decided to replace the old tunnel with a new tunnel.<ref>https://www.landsverk.fo/fo-fo/bygging/verkaetlanir/hvalbiartunnilin</ref> This tunnel, with two lanes and a |
In 2017 it was decided to replace the old tunnel with a new tunnel.<ref>https://www.landsverk.fo/fo-fo/bygging/verkaetlanir/hvalbiartunnilin</ref> This tunnel, with two lanes and a clearance of 4.5 meters, measures 2.500 metres in length. Drilling started on 27 June 2019 and finished on 7 July 2020.<ref>https://dagur.fo/nyggi-hvalbiartunnilin-verdur-skotin-igjognum-tysdagin</ref> A new access road of 2.4 kilometres is constructed on the Hvalba side and 1.4 km on the Trongisvágur side.<ref>https://www.landsverk.fo/fo-fo/utbjo%C3%B0ing-av-hvalbiartunlinum</ref> The tunnel is built by ArtiCon and LNS. Planned to open in 2021, the tunnel cost 272 million DKK.<ref>https://www.landsverk.fo/fo-fo/utbjo%C3%B0ing-av-hvalbiartunlinum</ref> What will remain of the old tunnel is unknown. | ||
The new Hvalbiartunnilin will gain extra importance if the subsea ] is constructed between Hvalba or ] on Suðuroy and the isle of ]. This tunnel is yet to be decided upon, but should according to plans open around 2030.<ref>https://www.landsverk.fo/fo-fo/samfer%C3%B0sluaetlanin-2018-2030/stoerri-iloegur-komandi-arini/su%C3%B0uroyartunnilin</ref> Sandoy is connected to capital ] and the rest of the country via the ]. | The new Hvalbiartunnilin will gain extra importance if the subsea ] is constructed between Hvalba or ] on Suðuroy and the isle of ]. This tunnel is yet to be decided upon, but should according to plans open around 2030.<ref>https://www.landsverk.fo/fo-fo/samfer%C3%B0sluaetlanin-2018-2030/stoerri-iloegur-komandi-arini/su%C3%B0uroyartunnilin</ref> Sandoy is connected to capital ] and the rest of the country via the ]. |
Revision as of 11:26, 13 January 2021
Entrance near Hvalba | |
Overview | |
---|---|
Location | Hvalba and Trongisvágur, Faroe Islands |
Status | In operation |
Operation | |
Work begun | 1961 |
Opened | 1963 |
Owner | Landsverk |
Operator | Landsverk |
Traffic | Automotive |
Vehicles per day | 900 (2017) |
Technical | |
Length | 1,450 m (4,760 ft) |
No. of lanes | 1 |
Operating speed | 80 km/h (50 mph) |
Highest elevation | 227 m (745 ft) |
Lowest elevation | 150 m (490 ft) |
Tunnel clearance | 3.2 m (10 ft) |
Width | 3.3 m (11 ft) |
Grade | 5.61% |
Overview | |
---|---|
Location | Hvalba and Trongisvágur, Faroe Islands |
Status | Under construction |
Operation | |
Work begun | 2019 |
Opened | 2021 |
Owner | Landsverk |
Operator | Landsverk |
Traffic | Automotive |
Vehicles per day | 2,000 (2030) |
Technical | |
Length | 2,050 m (6,730 ft) |
No. of lanes | 2 |
Operating speed | 80 km/h (50 mph) |
Highest elevation | 101 m (331 ft) |
Lowest elevation | 81 m (266 ft) |
Tunnel clearance | 4.6 m (15 ft) |
Width | 7.0 m (23.0 ft) |
Grade | 6.00 % |
The Hvalbiartunnilin (Hvalba Tunnel) is the name applied to two tunnels on the island of Suðuroy, the most southerly of the Faroe Islands. The original Hvalbiartunnilin is the oldest tunnel in the country, and is currently being replaced by a modern one. Both tunnels connect the villages of Hvalba and Trongisvágur. The tunnels are owned and maintained by the public works authority Landsverk.
History
The centuries before the tunnel arrived, Hvalba and Trongisvágur were connected by a footpath via the Krákugjógv. Construction of the Hvalbiartunnilin started in 1961 and it opened in 1963, as the first tunnel in the country. It has always remained an unlit, one-lane tunnel, measuring 1.450 metres in length. Because of its limited clearance of 3.2 metres, it cannot handle modern-sized large vehicles, such as lorries, trailers and touringcars, which impedes transport to the rest of the island and onwards to Tórshavn. Although the tunnel has passing places at regular intervals, this hinders quick passage of the tunnel in especially the northbound direction, as these vehicles need to yield to oncoming southbound cars. The footpath is still a popular hiking route.
In 2017 it was decided to replace the old tunnel with a new tunnel. This tunnel, with two lanes and a clearance of 4.5 meters, measures 2.500 metres in length. Drilling started on 27 June 2019 and finished on 7 July 2020. A new access road of 2.4 kilometres is constructed on the Hvalba side and 1.4 km on the Trongisvágur side. The tunnel is built by ArtiCon and LNS. Planned to open in 2021, the tunnel cost 272 million DKK. What will remain of the old tunnel is unknown.
The new Hvalbiartunnilin will gain extra importance if the subsea Suðuroyartunnilin is constructed between Hvalba or Sandvík on Suðuroy and the isle of Sandoy. This tunnel is yet to be decided upon, but should according to plans open around 2030. Sandoy is connected to capital Tórshavn and the rest of the country via the Sandoyartunnilin.
See also
References
- https://www.landsverk.fo/fo-fo/bygging/verkaetlanir/hvalbiartunnilin
- https://www.landsverk.fo/fo-fo/borgari/kervi%C3%B0/tunlar
- https://www.landsverk.fo/fo-fo/bygging/verkaetlanir/hvalbiartunnilin
- https://dagur.fo/nyggi-hvalbiartunnilin-verdur-skotin-igjognum-tysdagin
- https://www.landsverk.fo/fo-fo/utbjo%C3%B0ing-av-hvalbiartunlinum
- https://www.landsverk.fo/fo-fo/utbjo%C3%B0ing-av-hvalbiartunlinum
- https://www.landsverk.fo/fo-fo/samfer%C3%B0sluaetlanin-2018-2030/stoerri-iloegur-komandi-arini/su%C3%B0uroyartunnilin
Categories: