Misplaced Pages

Draft:Warri Refining and Petrochemicals: Difference between revisions

Article snapshot taken from[REDACTED] with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Browse history interactively← Previous editNext edit →Content deleted Content addedVisualWikitext
Revision as of 17:29, 4 January 2025 editलॉस एंजिल्स लेखक (talk | contribs)Extended confirmed users831 editsm लॉस एंजिल्स लेखक moved page Warri Refinery & Petrochemical Company Limited to Draft:Warri Refinery & Petrochemical Company Limited: Not ready for mainspace, incubate in draftspace (via script)← Previous edit Revision as of 17:29, 4 January 2025 edit undoलॉस एंजिल्स लेखक (talk | contribs)Extended confirmed users831 edits AFC draft (via script)Next edit →
Line 1: Line 1:
{{AfC submission|t||ts=20250104172937|u=Repair it|ns=118|demo=}}

<!-- Note: The following pages were redirects to ] before draftification:
*]
-->
{{Multiple issues| {{Multiple issues|
{{Promotional|date=January 2025}} {{Promotional|date=January 2025}}
Line 62: Line 67:
{{reflist}} {{reflist}}


] ]
] ]
{{Drafts moved from mainspace|date=January 2025}}

Revision as of 17:29, 4 January 2025

Draft article not currently submitted for review.

This is a draft Articles for creation (AfC) submission. It is not currently pending review. While there are no deadlines, abandoned drafts may be deleted after six months. To edit the draft click on the "Edit" tab at the top of the window.


To be accepted, a draft should:

It is strongly discouraged to write about yourself, your business or employer. If you do so, you must declare it.


Where to get help
  • If you need help editing or submitting your draft, please ask us a question at the AfC Help Desk or get live help from experienced editors. These venues are only for help with editing and the submission process, not to get reviews.
  • If you need feedback on your draft, or if the review is taking a lot of time, you can try asking for help on the talk page of a relevant WikiProject. Some WikiProjects are more active than others so a speedy reply is not guaranteed.
How to improve a draft

You can also browse Misplaced Pages:Featured articles and Misplaced Pages:Good articles to find examples of Misplaced Pages's best writing on topics similar to your proposed article.

Improving your odds of a speedy review

To improve your odds of a faster review, tag your draft with relevant WikiProject tags using the button below. This will let reviewers know a new draft has been submitted in their area of interest. For instance, if you wrote about a female astronomer, you would want to add the Biography, Astronomy, and Women scientists tags.

Add tags to your draft Editor resources
Last edited by लॉस एंजिल्स लेखक (talk | contribs) 19 days ago. (Update) Submit the draft for review!
This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these messages)
This article contains promotional content. Please help improve it by removing promotional language and inappropriate external links, and by adding encyclopedic text written from a neutral point of view. (January 2025) (Learn how and when to remove this message)
This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.
Find sources: "Warri Refining and Petrochemicals" – news · newspapers · books · scholar · JSTOR (January 2025) (Learn how and when to remove this message)
(Learn how and when to remove this message)

The Warri Refining & Petrochemicals Company Limited (WRPC) is situated in Warri, within Delta State, Nigeria, and began operations in 1978. This facility is a sophisticated conversion refinery, boasting a distillation capacity of 6,250,000 metric tons annually (equivalent to 125,000 barrels per day). In addition to the refinery, the complex features a petrochemical plant that was established in 1988, with production capabilities of 13,000 metric tons per year for polypropylene and 18,000 metric tons per year for carbon black. The refinery primarily serves the markets in Nigeria's southern and southwestern regions.

WRPC is positioned in the Ubeji community of Warri, with geographical coordinates of 5°32'N and 5°41'E. It is bordered to the north by the Nigeria Gas Company (NGC).

Plant facilities

The company operates several fuel and petrochemical facilities, which include:

NHU – Naphtha Hydrotreater Unit  

KHU – Kerosene Hydrotreating Unit  

FCC – Fluid Catalytic Cracking Unit  

HF Alkylation Unit  

Polypropylene Production Unit  

Carbon Black Production Unit  

Power

The facility boasts a total electric power generation capacity of 125 MW.

Steam

The power plant is capable of producing high-pressure steam at a rate of 545 T/Hr, utilizing three boilers, two heat recovery units, and a CO boiler within the FCC unit.

Nitrogen

A nitrogen plant with a capacity of 1,600 NM³/Hr is available, along with a compressed air system.

Water Treatment

There is a potable water treatment facility on-site.

Wastewater Management

The wastewater treatment plant has recently undergone upgrades and rehabilitation.

Crude Oil Storage

The refinery has a crude oil storage capacity of 273,600 M³, which is adequate for approximately 14 days of operation.

Crude Oil Supply

Crude oil is supplied to the WRPC from Escravos, located about 80 km from the refinery.

Jetty Facilities

The jetty is equipped for the import and export of fuel oil, diesel, and PMS, as well as for ethylene import and storage.

Truck Loading

There are facilities for loading products onto trucks for distribution.

Railroad

A modern railroad system is in place for efficient product evacuation.

Operational capacity and performance

The Refinery is designed with a processing capacity of 125,000 barrels per day (B/D). Despite this significant capacity, the facility has historically struggled to achieve full utilization. Production levels have experienced a consistent decline over the years, with the exception of a brief period in the early 1990s, during which production saw a temporary increase.

Several key factors contribute to the refinery's inefficient operations. Addressing these issues is crucial for optimizing the refinery's performance and ensuring that it operates at its full potential. Among the proposed solutions is the refurbishment of the existing utilities within the plant. This upgrade aims to enhance their functionality and ensure they meet the operational demands of the refinery.

Recently, a turnaround maintenance initiative was completed, which is anticipated to significantly improve the refinery's overall performance. This maintenance is expected to enhance both throughput volume and product yield, positioning the refinery for better operational efficiency in the future.

References

  1. "NNPC Ltd Delivers on Refinery Revamp Promise: Warri Plant Resumes Operation with 125,000bpd Capacity in Warri, Delta State".
  2. "Warri Refinery begins operation, says NNPC".
  3. Adegbulugbe, Anthony O.; Dayo, Felix; Gurtler, Thomas (1989). "Optimal Structure of the Nigerian Energy Supply Mix". The Energy Journal. 10 (2): 165–176. ISSN 0195-6574.
  4. "Warri refinery don begin work again – NNPCL". BBC News Pidgin. 2024-12-30. Retrieved 2025-01-04.
  5. "Environmental Pollution and Refinery Operations in an Oil Producing Region of Nigeria: A Focus on Warri Petrochemical Company".
  6. "Warri Refinery Operations and Its Effects on Ubeji Creek".
  7. "Warri Refining & Petrochemicals Company Limited (WRPC)".
  8. "Warri Refinery starts operations, runs at 60% capacity".
  9. "Nigeria says its Warri Refinery is back after a decade of closures".
  10. "Warri refinery, Tinubu's new year gift to Nigerians – TMSG".

Category:Nigerian companies established in 1978 Category:Warri

Category:
Draft:Warri Refining and Petrochemicals: Difference between revisions Add topic