Misplaced Pages

Ulaanchuluut Landfill: Difference between revisions

Article snapshot taken from[REDACTED] with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Browse history interactivelyNext edit →Content deleted Content addedVisualWikitext
Revision as of 08:54, 5 January 2025 editChongkian (talk | contribs)Autopatrolled, Event coordinators, Extended confirmed users374,935 edits Created page with '{{Short description|Landfill in Songino Khairkhan, Ulaanbaatar, Mongolia}} {{Use dmy dates|date=January 2025}} {{Infobox venue | name = Ulaanchuluut Landfill | native_name = Улаанчулуутын хогийн цэг | native_name_lang = mn | nickname = | logo_image = | logo_size = | logo_upright = | logo_alt = | logo_caption = | image...'  Revision as of 09:08, 5 January 2025 edit undoChongkian (talk | contribs)Autopatrolled, Event coordinators, Extended confirmed users374,935 edits History: add more earlier history & inline citationNext edit →
Line 77: Line 77:


==History== ==History==
In 2020, around 8 hectares of the landfill was turned into a green park. In 2022, solid waste recycling plant was constructed at the site.<ref name="B., Anktuya, 12 August 2020">{{cite news|last=B.|first=Ankhtuya|date=12 August 2020|url=https://news.mn/en/793808/|title=Turning UB's largest rubbish dump into a Green Park|work=News.mn|access-date=5 January 2025}}</ref> The landfill reached its maximum capacity and was closed down in 2024.<ref>{{cite news|last=B.|first=Ganchimeg|date=13 April 2023|url=https://montsame.mn/en/read/316654|title=Construction and Demolition Waste Recycling Plant to be Completed in 2024|work=Mongolian National News Agency|access-date=5 January 2025}}</ref> The landfill used to be the place for many ]s collected waste manually to be resold.<ref>{{cite news|last=Hernndez|first=Javier C.|date=3 October 2017|url=https://www.todayonline.com/world/asia/life-inside-mongolias-swelling-slums|title=Life inside Mongolia's swelling slums|work=Today Online|access-date=5 January 2025}}</ref> In 2020, around 8 hectares of the landfill was turned into a green park. In 2022, solid waste recycling plant was constructed at the site.<ref name="B., Anktuya, 12 August 2020">{{cite news|last=B.|first=Ankhtuya|date=12 August 2020|url=https://news.mn/en/793808/|title=Turning UB's largest rubbish dump into a Green Park|work=News.mn|access-date=5 January 2025}}</ref> The landfill reached its maximum capacity and was closed down in 2024.<ref>{{cite news|last=B.|first=Ganchimeg|date=13 April 2023|url=https://montsame.mn/en/read/316654|title=Construction and Demolition Waste Recycling Plant to be Completed in 2024|work=Mongolian National News Agency|access-date=5 January 2025}}</ref>


==Technical specifications== ==Technical specifications==

Revision as of 09:08, 5 January 2025

Landfill in Songino Khairkhan, Ulaanbaatar, Mongolia

Ulaanchuluut Landfill
Улаанчулуутын хогийн цэг
AddressUlaanbaatar
Mongolia
LocationSongino Khairkhan
Coordinates47°56′54.2″N 106°47′24.9″E / 47.948389°N 106.790250°E / 47.948389; 106.790250
Typelandfill
Surface10 hectares
Closed2024

The Ulaanchuluut Landfill (Mongolian: Улаанчулуутын хогийн цэг) is a former landfill in Songino Khairkhan, Ulaanbaatar, Mongolia.

History

The landfill used to be the place for many waste collectors collected waste manually to be resold. In 2020, around 8 hectares of the landfill was turned into a green park. In 2022, solid waste recycling plant was constructed at the site. The landfill reached its maximum capacity and was closed down in 2024.

Technical specifications

The landfill has a total area of 10 hectares. It used to collect waste from Bayangol, Chingeltei, Nalaikh, Songinokhairkhan and Sükhbaatar districts.

See also

References

  1. Hernndez, Javier C. (3 October 2017). "Life inside Mongolia's swelling slums". Today Online. Retrieved 5 January 2025.
  2. ^ B., Ankhtuya (12 August 2020). "Turning UB's largest rubbish dump into a Green Park". News.mn. Retrieved 5 January 2025.
  3. B., Ganchimeg (13 April 2023). "Construction and Demolition Waste Recycling Plant to be Completed in 2024". Mongolian National News Agency. Retrieved 5 January 2025.
  4. "The Study on Solid Waste Management Plan for Ulaanbaatar City in Mongolia" (PDF). JICA. Retrieved 5 January 2025.
Categories:
Ulaanchuluut Landfill: Difference between revisions Add topic