Revision as of 02:26, 18 August 2007 edit64.247.119.6 (talk)No edit summary← Previous edit | Revision as of 04:52, 31 August 2007 edit undoMetsBot (talk | contribs)Extended confirmed users230,560 editsm Robot: clean up and substitute bloated conversion templates including {{convert}} using AWBNext edit → | ||
Line 6: | Line 6: | ||
|official_name= | |official_name= | ||
|also_known_as= | |also_known_as= | ||
|carries= ''Will carry'' ] (4 lanes) | |carries= ''Will carry'' ] (4 lanes) | ||
|crosses= ] | |crosses= ] | ||
|locale= ] and ] | |locale= ] and ] | ||
Line 12: | Line 12: | ||
|id= | |id= | ||
|design= ] | |design= ] | ||
|mainspan= <span style="white-space:nowrap">878 feet (268 m)</span> | |||
|mainspan= {{convert|878|ft|m|0}} | |||
|length= <span style="white-space:nowrap">4,009 feet (1,222 m)</span> | |||
|length= {{convert|4009|ft|m|0}} | |||
|width= <span style="white-space:nowrap">107 feet (33 m)</span> | |||
|width= {{convert|107|ft|m|0}} | |||
|clearance= <span style="white-space:nowrap">76 feet (23 m)</span> | |||
|clearance= {{convert|76|ft|m|0}} | |||
|below= | |below= | ||
|traffic= | |traffic= | ||
Line 38: | Line 38: | ||
{{reflist}} | {{reflist}} | ||
==External |
==External links== | ||
* | * | ||
* | * | ||
Line 56: | Line 56: | ||
}} | }} | ||
] | ] | ||
] | ] | ||
] | ] | ||
] | ] | ||
{{bridge-struct-stub}} | {{bridge-struct-stub}} |
Revision as of 04:52, 31 August 2007
Template:Bridge under construction
Bridge in Ohio and Parkersburg, West VirginiaBlennerhassett Island Bridge | |
---|---|
Coordinates | 39°16′36″N 81°38′49″W / 39.2767°N 81.6469°W / 39.2767; -81.6469 |
Carries | Will carry (4 lanes) |
Crosses | Ohio River |
Locale | Belpre, Ohio and Parkersburg, West Virginia |
Maintained by | Ohio Department of Transportation West Virginia Department of Transportation |
Characteristics | |
Design | Through arch bridge |
Total length | 4,009 feet (1,222 m) |
Width | 107 feet (33 m) |
Longest span | 878 feet (268 m) |
Clearance above | 76 feet (23 m) |
History | |
Opened | Scheduled for November, 2007 |
Location | |
Blennerhassett Island Bridge is currently under construction. The bridge will be an tied-arch bridge upon its completion in November, 2007 at a cost of $120 million dollars. This is the final piece to the Corridor D project which is apart of the Appalachian Development Highway System. The bridge will be marked U.S. 50 for the entire structure once it's completed.
Details
The bridge will travel over the Ohio River and the historic Blennerhassett Island west of Belpre and Parkersburg. The bridge will be owned by the ODOT and WVDOT. The bridge is currently being constructed by the Walsh Construction Company of Chicago.
References
- ^ GoBridges.com. "Innovative tied-arch steel bridge to span Ohio River". Retrieved 2005-05-28.
External links
- Construction Cam
- Construction Photos
- Corridor D Bridge Site
- EL Robinson Design Team of Blennerhasset Island Bridge
- GoBridges.com Article
Crossings of the Ohio River | ||||
---|---|---|---|---|
|
This article about a specific bridge or group of bridges is a stub. You can help Misplaced Pages by expanding it. |