Misplaced Pages

Wittpenn Bridge: Difference between revisions

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Browse history interactively← Previous editNext edit →Content deleted Content addedVisualWikitext
Revision as of 21:55, 17 November 2017 editJllm06 (talk | contribs)Autopatrolled, Extended confirmed users, Pending changes reviewers457,466 edits Remove parent category, already included via another category← Previous edit Revision as of 20:23, 11 March 2018 edit undoDavidng913 (talk | contribs)Extended confirmed users20,118 editsNo edit summaryTags: Mobile edit Mobile web editNext edit →
Line 40: Line 40:
When raised, the bridge provides {{convert|100|ft}} of clearance for ships. Raising the lift span takes 15 minutes. In 2005, the bridge was raised to accommodate 80 boats passing underneath.<ref name=Record/> When raised, the bridge provides {{convert|100|ft}} of clearance for ships. Raising the lift span takes 15 minutes. In 2005, the bridge was raised to accommodate 80 boats passing underneath.<ref name=Record/>


==Replacement==
The ] (NJDOT) is replacing the Wittpenn Bridge and all its approach ramps (including connections to ]), a project estimated to cost $600 million, funded by federal dollars. The first phase of construction began in July 2011, and the overall project is expected to take 11 years to complete.<ref>http://www.nj.com/hudson/index.ssf/2016/12/5_year_done_7_years_to_go_for_500m_new_wittpenn_br.html</ref> The new bridge will be situated just north of the existing bridge.<ref>Conti Group (2011). 2011-07-18.</ref> The ] (NJDOT) is replacing the Wittpenn Bridge and all its approach ramps (including connections to ]), a project estimated to cost $600 million, funded by federal dollars. The first phase of construction began in July 2011, and the overall project is expected to take 11 years to complete.<ref>http://www.nj.com/hudson/index.ssf/2016/12/5_year_done_7_years_to_go_for_500m_new_wittpenn_br.html</ref> The new bridge will be situated just north of the existing bridge.<ref>Conti Group (2011). 2011-07-18.</ref>



Revision as of 20:23, 11 March 2018

This article needs to be updated. Please help update this article to reflect recent events or newly available information. (April 2016)
Bridge in Jersey City and Kearny, New Jersey
Wittpenn Bridge
Wittpenn Bridge, looking east in a 2004 photo
Coordinates40°44′26″N 74°04′53″W / 40.740625°N 74.081336°W / 40.740625; -74.081336 (Wittpenn Bridge)
Carries4 lanes of Route 7
CrossesHackensack River
LocaleJersey City and Kearny, New Jersey
Official nameWittpenn Bridge
Other name(s)Route 7 Bridge
Maintained byNew Jersey Department of Transportation
ID number0909150
Characteristics
DesignLift bridge
Total length2,169 feet (661 m)
Width40 feet (12 m)
Longest span83 feet (25 m)
Clearance below35 feet (11 m) (lowered)
100 feet (30 m) (raised)
History
OpenedNovember 5, 1930
Statistics
Daily traffic50,000
Wittpenn Bridge is located in New York CityWittpenn BridgeWittpenn Bridge
Location

The Wittpenn Bridge is a vertical-lift bridge that carries New Jersey Route 7 over the Hackensack River connecting Kearny and Jersey City, New Jersey. It is named after H. Otto Wittpenn, a former mayor of Jersey City. The bridge comprises four 10-foot-wide (3.0 m) lanes, extending 2,169 feet (661 m) and standing 35 feet (11 m) above mean high water with a 209-foot (64 m) main lift span. Bridge construction commenced in 1927, and it was opened to vehicular traffic on November 5, 1930. The bridge has an annual average daily traffic (AADT) of nearly 50,000 vehicles, including about 2,000 trucks.

When raised, the bridge provides 100 feet (30 m) of clearance for ships. Raising the lift span takes 15 minutes. In 2005, the bridge was raised to accommodate 80 boats passing underneath.

Replacement

The New Jersey Department of Transportation (NJDOT) is replacing the Wittpenn Bridge and all its approach ramps (including connections to U.S. Route 1/9), a project estimated to cost $600 million, funded by federal dollars. The first phase of construction began in July 2011, and the overall project is expected to take 11 years to complete. The new bridge will be situated just north of the existing bridge.

The reconstruction of the bridge is being partially funded by the Port Authority of New York and New Jersey, and it will be fully operational in 2021.

Once completed, the bridge will carry the East Coast Greenway, a long-distance biking and walking trail, and the Meadowlands Connector, a New Jersey biking and walking trail that links Hudson and Essex counties.

See also

References

  1. "Historic Bridge Survey (1991–1994)" (PDF). NJDOT. 2001. Retrieved 2013-03-26.
  2. ^ Picture this: Drawbridge Operator, The Record (Bergen County), April 11, 2005
  3. http://www.nj.com/hudson/index.ssf/2016/12/5_year_done_7_years_to_go_for_500m_new_wittpenn_br.html
  4. Conti Group (2011). "Conti to Kick off Wittpenn Bridge Repairs" 2011-07-18.
  5. "Another new bridge quietly rises in shadow of the Pulaski Skyway". NJ.com.
  6. "New bike, walking trail would link N.J.'s 2 largest cities". Retrieved 27 March 2017.

External links

Crossings of the Hackensack River
Upstream
Lower Hack Lift
New Jersey Transit
Wittpenn Bridge
Downstream
Harsimus Branch Lift Bridge
Categories: