Misplaced Pages

Boeing Lunar Lander: Difference between revisions

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Browse history interactively← Previous editNext edit →Content deleted Content addedVisualWikitext
Revision as of 20:54, 9 November 2019 editRundownPear (talk | contribs)455 edits Challenges: Cited SLS EUS Gateway funding argumentTag: Visual edit← Previous edit Revision as of 00:14, 11 November 2019 edit undoRundownPear (talk | contribs)455 edits ChallengesTag: Visual editNext edit →
Line 77: Line 77:


== Challenges == == Challenges ==
One problem with the lander is its high mass, and it requires to be launched by a SLS Block 1B. This variant of SLS is not expected to be operational until 2025 at the earliest. Boeing suggests cutting funding for the ] in order to accelerate development of the ] and allow for Block 1B to fly in 2024.<ref>{{Cite web|url=https://arstechnica.com/science/2019/09/some-nasa-contractors-appear-to-be-trying-to-kill-the-lunar-gateway/|title=Some NASA contractors appear to be trying to kill the Lunar Gateway|last=Berger|first=Eric|date=2019-09-19|website=Ars Technica|language=en-us|access-date=2019-11-09}}</ref> One problem with the lander is its high mass, and it requires to be launched by a SLS Block 1B. This variant of SLS is not expected to be operational until 2025 at the earliest. Boeing suggests cutting funding for the ] in order to accelerate development of the ] and allow for Block 1B to fly in 2024.<ref>{{Cite web|url=https://arstechnica.com/science/2019/09/some-nasa-contractors-appear-to-be-trying-to-kill-the-lunar-gateway/|title=Some NASA contractors appear to be trying to kill the Lunar Gateway|last=Berger|first=Eric|date=2019-09-19|website=Ars Technica|language=en-us|access-date=2019-11-09}}</ref> It was stated that the lander could be launched in parts with the descent stage launching on SLS Block 1 and the ascent stage launching on a commercial launcher and the two parts be assembled in lunar orbit in case Block 1B is not ready.<ref>{{Cite web|url=https://spaceflightnow.com/2019/11/09/boeing-proposes-sls-launched-lunar-lander/|title=Boeing proposes SLS-launched lunar lander – Spaceflight Now|last=Clark|first=Stephen|language=en-US|access-date=2019-11-11}}</ref>


==See also== ==See also==

Revision as of 00:14, 11 November 2019

Boeing Human Landing System (HLS)
DesignerBoeing
Country of originUS
Applicationscrewed lunar lander
Capacity
Payload to {{{to}}}
Production
StatusProposed
Built0
HLS is a crewed lunar lander concept

The Boeing Human Landing System (HLS) was submitted to NASA on 5 November 2019 as part of the Artemis program and the NextSTEP H. The proposal was presented as the "quickest and simplest method" for a 2024 Moon landing.

Overview

This is a propsal for the design of a lunar lander and lunar orbit spacecraft that would use the Space Launch System (SLS rocket) being developed by NASA. This concept was presented as a response to NASA's solicitation in May 2019 from about dozen companies for lunar lander designs.

The lander consists of a descent and ascent stage with the descent stage being able to deorbit the lander, which eliminates the need for a third transfer stage. The lander is designed to be launched on an SLS Block 1B rocket rather than assembled in space after multiple launches, reducing the number of mission-critical events from 11 to 5, and reducing mission complexity. The lander would not require to dock onto the Lunar Gateway and could dock with Orion directly in order to allow for a simpler mission profile. The lander would reuse key technologies from the Boeing's CST-100 Starliner, which would allow systems like life support, the pressure vessel, and avionics system to be flight-tested and human-rated before being integrated into the lander.

Intuitive Machines was selected to build and test the lander's engines and fuel tank structure. Aerojet Rocketdyne is also participating in the project.

Challenges

One problem with the lander is its high mass, and it requires to be launched by a SLS Block 1B. This variant of SLS is not expected to be operational until 2025 at the earliest. Boeing suggests cutting funding for the Lunar Gateway in order to accelerate development of the Exploration Upper Stage and allow for Block 1B to fly in 2024. It was stated that the lander could be launched in parts with the descent stage launching on SLS Block 1 and the ascent stage launching on a commercial launcher and the two parts be assembled in lunar orbit in case Block 1B is not ready.

See also

References

  1. "Boeing proposes lunar lander for NASA crews, rivaling Blue Origin (and SpaceX?)". news.yahoo.com. Retrieved 2019-11-08.
  2. Potter, Sean (2019-05-16). "NASA Taps 11 American Companies to Advance Human Lunar Landers". NASA. Retrieved 2019-11-08.
  3. "Boeing's lunar lander pitch promises 'fastest path' to the moon". Engadget. Retrieved 2019-11-06.
  4. Berger, Eric (2019-09-19). "Some NASA contractors appear to be trying to kill the Lunar Gateway". Ars Technica. Retrieved 2019-11-09.
  5. Clark, Stephen. "Boeing proposes SLS-launched lunar lander – Spaceflight Now". Retrieved 2019-11-11.
Artemis program
Missions
Uncrewed
Crewed
Emblem of the Artemis program
Agencies
Facilities
Rockets
Crewed spacecraft
Robotic spacecraft
Spacecraft missions to the Moon
Exploration
programs
Active
missions
Orbiters
Landers
Rovers
Flybys
Past
missions
Crewed landings
Orbiters
Impactors
Landers
Rovers
Sample return
Failed landings
Flybys
Planned
missions
Artemis
CLPS
Luna-Glob
CLEP
Chandrayaan
Others
Proposed
missions
Robotic
Crewed
Cancelled /
concepts
Related
  • Missions are ordered by launch date. Crewed missions are in italics.
United States human spaceflight programs
Active
Completed
Canceled
This article needs additional or more specific categories. Please help out by adding categories to it so that it can be listed with similar articles. (November 2019)
Categories: