Revision as of 22:31, 22 February 2011 by Tasma3197 (talk | contribs) (redlink fixed)(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)This article is an orphan, as no other articles link to it. Please introduce links to this page from related articles; try the Find link tool for suggestions. (February 2011) |
The contingency allowance is the time allocated during planning for unscheduled events. Technical and personal disruptions result in changes in the indirect production costs. The contingency allowance is calculated in special contingency time studies, the results of which yield rates for indirect production costs.
The concept was developed by Charles Bedaux.
References
- Poeschel, Frank: Verteilzeit. In: Landau, Kurt (Hrsg.): Lexikon Arbeitsgestaltung : Best Practise im Arbeitsprozess. Stuttgart: Genter, 2007. - ISBN 978-3-87247-655-5. P. 1292.
This article has not been added to any content categories. Please help out by adding categories to it so that it can be listed with similar articles. (February 2011) |