An 801 Series on the Sangi Line | |
Overview | |
Locale | Mie Prefecture |
Termini | |
Stations | 15 |
Service | |
Type | Commuter rail |
Operator(s) | Sangi Railway |
History | |
Opened | 23 July 1931 |
Technical | |
Line length | 26.6 km (16.5 mi) |
Number of tracks | 1 |
Track gauge | 1,067 mm (3 ft 6 in) |
Electrification | Overhead, 1500 V DC |
Operating speed | 70 km/h (43 mph) |
The Sangi Line (三岐線, Sangi sen), is a 1,067 mm (3 ft 6 in) narrow gauge railway line owned and operated by the Sangi Railway (三岐鉄道, Sangi tetsudō), a Japanese private railway company. The line connects Kintetsu-Tomida Station in Yokkaichi, Mie with Nishi-Fujiwara Station in Inabe, Mie, in Japan.
Services
All services are classified "Local" (普通, futsū), stopping at every station, and are wanman driver-only operation.
Stations
Station | Distance (km) | Transfers | Location | |||
---|---|---|---|---|---|---|
Between Stations |
Total Distance | |||||
Kintetsu-Tomida | 近鉄富田 | - | 0.0 | Kintetsu Nagoya Line (E17) | Yokkaichi | Mie |
Ōyachi | 大矢知 | 2.6 | 2.6 | |||
Heizu | 平津 | 1.6 | 4.2 | |||
Akatsuki Gakuenmae | 暁学園前 | 1.2 | 5.4 | |||
Yamajō | 山城 | 1.7 | 7.1 | |||
Hobo | 保々 | 2.5 | 9.6 | |||
Hokusei Chūō Kōenguchi | 北勢中央公園口 | 1.7 | 11.3 | |||
Umedoi | 梅戸井 | 1.9 | 13.2 | Inabe | ||
Daian | 大安 | 2.2 | 15.4 | |||
Misato | 三里 | 1.8 | 17.2 | |||
Nyugawa | 丹生川 | 2.5 | 19.7 | |||
Ise-Hatta | 伊勢治田 | 1.2 | 20.9 | |||
Higashi-Fujiwara | 東藤原 | 2.3 | 23.2 | |||
Nishi-Nojiri | 西野尻 | 2.2 | 25.4 | |||
Nishi-Fujiwara | 西藤原 | 1.2 | 25.6 |
History
• 1928:
- • 9 March: Subsidies for railway licenses to Fujiwara Railway (Yokkaichi City-Sekigahara Town, Fuwa District, Yokkaichi City-Shiohama Village, Mie District, Onaga Village, Inabe District-Tomita Town, Mie District, Mie Village, Mie District-Kawashima Village, Mie District) were issued.
- • 20 September: Sangi Railway was established
• 1931:
- • 23 July: Section from Tomida Station (now Tomida JR station) to Higashi Fujiwara was opened.
- • 23 December: Section from Higashi Fujiwara to Nishi Fujiwara was opened.
• 1937
- • 2 December: Railway license expired (Nishifujiwara-mura, Inabe-gun-Sekigahara-cho, Fuwa-gun designated deadline Mateni construction work approval application)
• 1950
- • 30 October: Sangi Asaki station opened in between Tomida and Oyachima stations.
• 1952
- • 1 December: Direct passenger train operation started from Tomida Station to Yokkaichi Station on the Japanese National Railways
• 1954
- • 29 March: All lines are electrified and electric locomotives are used for freight trains
• 1964
- • 1 October: Direct passenger train operation from Tomida Station to Yokkaichi Station was cut.
• 1965
- • 1 July: Tomida Nishiguchi station opened
- • 21 August: Kayou Station was renamed to Akatsuki Gakuenmae station
• 1968
- • Misato Station was renamed to Ugakeiguchi Station
• 1970
- • 25 June: The section from Kintetsu-Tomida to Sangi Asaki
• 1974
- • The section from Tomida/Kintetsu-Tomida - Higashi Fujiwara becomes CTC compatible
• 1985
- • 14 March: Sanuki Asaki and Tomida Nishiguchi stations closed
- • 16 May: Wanman (ワンマン) driverless operation began for freight services.
• 1986
- • 25 March: Ōida station was relocated and renamed to Daian station. Ugakeiguchi station was renamed back to Misato station
• 1988
- • 7 January: Wanman (ワンマン) driverless operation began for passenger services.
• 1989
- • 1 April: Sangi Asaki station became Sangi Asaki signal box. The morning express service that was operated was cut.
• 1994
- • 3 December: The line speed was increased from 60 km/h (37 mph) to 70 km/h (43 mph)
• 1994
- • 1 April: Ōchō station was relocated and renamed to Hokusei Chūō Kōenguchi
• 2011
- • 4 September: Typhoon 12 struck and the entire line was closed due to the Asake River flowing over its banks.
- • 6 September: Kintetsu-Tomida to Yamajo and Misato to Nishi-Fujiwara were reopened following the Typhoon.
- • 7 September: Yamajo to Hodo reopened.
- • 8 September: Umedoi to Misato reopened.
- • 11 October: Hodo to Umedoi reopened, thus reopening the entire line.
• 2012
- • 8 February: A derailment of an electric train occurred at Higashi-Fujiwara, and as a result, all services between Ise Hatta and Nishi Fujiwara were suspended.
- • 30 June: The section between Ise Hatta and Nishi Fujiwara reopened following the derailment 4 months prior.
- • 8 November: A 3 car passenger train derailed at Misato station, and as a result, the section from Umedoi to Nishi Fujiwara was suspended.
- • 11 November: Umedoi to Higashi Fujiwara reopened. Rail replacement buses ran from Higashi Fujiwara to Nishi Fujiwara
• 2013
- • 12 January: Higashi Fujiwara to Nishi Fujiwara section reopened following the derailment in November 2012.
References
This article incorporates material from the corresponding article in the Japanese Misplaced Pages.
Transit in Greater Nagoya (Chūkyō) | |
---|---|
Shinkansen | |
JR Central | |
Nagoya Municipal Subway | |
Meitetsu | |
Kintetsu | |
Minor private railways | |
Third-sector railways | |
Bus |
|
Terminals |
|
Miscellaneous |
|