This is an old revision of this page, as edited by 95.80.39.123 (talk) at 12:06, 25 May 2024 (→Somethings inconsistent in the About section: around PDCA / PDSA: Reply). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.
Revision as of 12:06, 25 May 2024 by 95.80.39.123 (talk) (→Somethings inconsistent in the About section: around PDCA / PDSA: Reply)(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)This is the talk page for discussing improvements to the PDCA article. This is not a forum for general discussion of the article's subject. |
|
Find sources: Google (books · news · scholar · free images · WP refs) · FENS · JSTOR · TWL |
This article is rated C-class on Misplaced Pages's content assessment scale. It is of interest to the following WikiProjects: | |||||||||||
|
Archives (Index) |
This page is archived by ClueBot III. |
Demming did'nt recognize PDCA
Deming was rather furiers about the PDCA teminologi and would not accept to be refered to this typology because he dislikede the passivity concerning C= Check. Deming introduced PDSA. S=Study wich in his teminology indicates an active aktivity. if nessescery I can dokument evidenc to this topic but a visit to the web site "The W. Edwards Deming Institute" can be helpfull. — Preceding unsigned comment added by 5.103.40.194 (talk) 06:59, 28 October 2021 (UTC)
Pdca cycle
Seminar purpose 2409:4073:2110:5899:C8CA:C2AB:DF48:29B (talk) 10:49, 24 April 2022 (UTC)
Es
J i t 152.57.185.247 (talk) 15:39, 28 August 2022 (UTC)
Somethings inconsistent in the About section: around PDCA / PDSA
"PDCA is associated with W. Edwards Deming, who is considered by many to be the father of modern quality control; however, he used PDSA (Plan-Do-Study-Act) and referred to it as the "Shewhart cycle". Later in Deming's career, he modified PDCA to "Plan, Do, Study, Act" (PDSA) because he felt that "check" emphasized inspection over analysis."
Did he start with PDCA and changed later to PDSA or vice versa? Dostl ba (talk) 12:59, 26 May 2023 (UTC)
- I was thinking the same. Surely, it is supposed to read '...he modified PDSA to "Plan, Do, Check, Act" (PDCA) because he...'? 95.80.39.123 (talk) 12:06, 25 May 2024 (UTC)