Misplaced Pages

Contingency allowance

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

This is an old revision of this page, as edited by Yotwen (talk | contribs) at 11:01, 30 May 2016 (Link to related article). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Revision as of 11:01, 30 May 2016 by Yotwen (talk | contribs) (Link to related article)(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)
This article is an orphan, as no other articles link to it. Please introduce links to this page from related articles; try the Find link tool for suggestions. (February 2011)

The contingency allowance is the time allocated during planning for unscheduled events. Technical and personal disruptions result in changes in the indirect production costs. The contingency allowance is calculated in special contingency time studies, the results of which yield rates for indirect production costs. The time is usually added to the pure operations time to form a standard time in manufacturing.

The concept was developed by Charles Bedaux.

References

  1. Poeschel, Frank: Verteilzeit. In: Landau, Kurt (Hrsg.): Lexikon Arbeitsgestaltung : Best Practise im Arbeitsprozess. Stuttgart: Genter, 2007. - ISBN 978-3-87247-655-5. P. 1292.
Categories: