Misplaced Pages

LB&SCR E2 class

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

This is an old revision of this page, as edited by Thryduulf (talk | contribs) at 00:07, 3 April 2023 (Thomas the Tank Engine: this section may once have contained original research but it very clearly does not do so now.). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Revision as of 00:07, 3 April 2023 by Thryduulf (talk | contribs) (Thomas the Tank Engine: this section may once have contained original research but it very clearly does not do so now.)(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff) Steam locomotive class

LB&SCR E2 class
First series E2 with short side tanks, 1913
Type and origin
Power typeSteam
DesignerL. B. Billinton
BuilderBrighton works
Build dateJune 1913–October 1916
Total produced10
Specifications
Configuration:
 • Whyte0-6-0T
Gauge4 ft 8+1⁄2 in (1,435 mm) standard gauge
Driver dia.4 ft 6 in (1.372 m)
Length33 ft 3 in (10.13 m)
Loco weight52 long tons 15 cwt (118,200 lb or 53.6 t) (118,200 lb or 53,600 kg)
Fuel typeCoal
Fuel capacity2.46 long tons (2.50 t; 2.76 short tons)
Water cap.1,090 imp gal (5,000 L; 1,310 US gal) or 1,256 imp gal (5,710 L; 1,508 US gal)
Boiler pressure170 psi (1.2 MPa)
CylindersTwo inside
Cylinder size17.5 in × 26 in (444 mm × 660 mm)
Performance figures
Tractive effort21,307 lbf (94.78 kN)
Career
Operators
Power classBR: 3F
WithdrawnNovember 1961–April 1963
DispositionAll scrapped

The London, Brighton and South Coast Railway (LB&SCR) E2 class was a class of 0-6-0T steam locomotives designed by Lawson Billinton, intended for shunting and short distance freight trains. Ten examples were built between 1913 and 1916, and were withdrawn from service and scrapped between 1961 and 1963.

Background

By 1910, many of the Stroudley E1 class locomotives were worn out or inadequate for the heavier duties required of them. D. E. Marsh intended to rebuild some examples with a larger boiler, but only one E1X rebuild had been completed by the time of his unexpected retirement. Marsh's successor Billinton reversed this policy and instead ordered five new, more powerful locomotives from Brighton railway works. The new class included several features found on other LB&SCR classes including an I2 class boiler. They were delivered between June 1913 and January 1914.

The second series E2 with extended side tanks, 1915

Second Series

The new design was judged to be successful, except that they were found to have inadequate water supply. Thus when a further order for five locomotives was placed they were given extended side tanks. The second batch were delayed by the onset of World War I, but were eventually delivered between June 1915 and October 1916.

Use

The E2 class locomotives were mainly used for the heavier shunting and short distance freight duties in the London area and on the south coast, as their small coal bunkers made them unsuitable for long trips. These included empty stock workings at Victoria and London Bridge Stations.

Two were tried on passenger services with Push-pull trains in 1914, with the locomotives in the middle of a rake of six coaches, but the experiment was abandoned during the same year as they had insufficient coal capacity.

Following the electrification of the Brighton line in 1936, the class was used as replacements for the former LCDR T class at the Herne Hill marshalling yard, around Victoria station and at Dover harbour. During World War II, they also replaced the SR Z class at Hither Green marshalling yard.

The class were trialled as dock shunters at Southampton in the 1950s, and were found to be suitable for the task. Six examples were retained for this purpose until their replacement by British Rail Class 07 diesel shunters in 1962.

Withdrawal of the class took place between February 1961 and April 1963, and were all scrapped.

Locomotive summary

LB&SCR No. Date
Built
S.R. No. B.R. No. Date
Withdrawn
100 June 1913 2100 32100 November 1961
101 August 1913 2101 32101 September 1962
102 October 1913 2102 32102 October 1961
103 December 1913 2103 32103 October 1962
104 January 1914 2104 32104 April 1963
105 June 1915 2105 32105 September 1962
106 September 1915 2106 32106 October 1962
107 March 1916 2107 32107 February 1961
108 July 1916 2108 32108 June 1962
109 October 1916 2109 32109 April 1963

Thomas the Tank Engine

Main article: Thomas the Tank Engine

In 1946, Reginald Payne used the later series of E2 locomotives as the basis for the character Thomas the Tank Engine in the second book of The Railway Series by the Reverend W. Awdry.

00 Gauge models

Trix produced a model of the first series Class E2 in 1961. It was designed for the Trix Twin 3-rail system but could be converted to 2-rail using the optional 2-rail pick up included with the locomotive.

Hornby produced the locomotive in its earliest form as an 00 gauge model. Production lasted from 1979 to 1985 in three distinct variants with four reference numbers. In 1985 the tooling was retired and after some alterations, was instead used as the basis for the Thomas the Tank Engine model.

Bachmann have also produced several different-coloured E2-based models in their Junior Range.

References

  1. Bradley, (1974) p.128
  2. https://sremg.org.uk/steam/e2_class.shtml
  3. Bradley, (1974) pp.129–131
  4. Sibley 1995, p. 123
  5. "Thomas the Tank Engine". (The real prototype locomotives that inspired the Rev W Awdry). The Real Lives of Thomas the Tank Engine. Archived from the original on 13 December 2004. Retrieved 4 April 2011.
  6. http://www.hornbyguide.com/class_details.asp?classid=49

External links

London, Brighton and South Coast Railway locomotives
London and Brighton Railway (1841-1846)
J. C. Craven (1847–1869)
W. Stroudley (1870–1889)
R. J. Billinton (1890–1904)
D. E. Marsh (1905–1911)
L. B. Billinton (1911–1922)
Categories: