Contingency allowance

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

This is an old revision of this page, as edited by Chris 73 (talk | contribs) at 06:48, 13 October 2013 (Chris 73 moved page Contengency allowance to Contingency allowance: Typo). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Revision as of 06:48, 13 October 2013 by Chris 73 (talk | contribs) (Chris 73 moved page Contengency allowance to Contingency allowance: Typo)(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)
This article is an orphan, as no other articles link to it. Please introduce links to this page from related articles; try the Find link tool for suggestions. (February 2011)

The contingency allowance is the time allocated during planning for unscheduled events. Technical and personal disruptions result in changes in the indirect production costs. The contingency allowance is calculated in special contingency time studies, the results of which yield rates for indirect production costs.

The concept was developed by Charles Bedaux.

References

  1. Poeschel, Frank: Verteilzeit. In: Landau, Kurt (Hrsg.): Lexikon Arbeitsgestaltung : Best Practise im Arbeitsprozess. Stuttgart: Genter, 2007. - ISBN 978-3-87247-655-5. P. 1292.