Names | CartoSat-2C | ||||||||
---|---|---|---|---|---|---|---|---|---|
Mission type | Earth observation | ||||||||
Operator | ISRO | ||||||||
COSPAR ID | 2016-040A | ||||||||
SATCAT no. | 41599 | ||||||||
Website | https://www.isro.gov.in/ | ||||||||
Mission duration | 5 years (planned) 8 years, 6 months and 10 days (in progress) | ||||||||
Spacecraft properties | |||||||||
Spacecraft | CartoSat-2C | ||||||||
Bus | IRS-2 | ||||||||
Manufacturer | Indian Space Research Organisation | ||||||||
Launch mass | 728 kg (1,605 lb) | ||||||||
Power | 986 watts | ||||||||
Start of mission | |||||||||
Launch date | 22 June 2016, 03:56 UTC | ||||||||
Rocket | Polar Satellite Launch Vehicle-XL, PSLV-C34 | ||||||||
Launch site | Satish Dhawan Space Centre, Second Launch Pad (SLP) | ||||||||
Contractor | Indian Space Research Organisation | ||||||||
Entered service | 22 September 2016 | ||||||||
Orbital parameters | |||||||||
Reference system | Geocentric orbit | ||||||||
Regime | Sun-synchronous orbit | ||||||||
Perigee altitude | 497 km (309 mi) | ||||||||
Apogee altitude | 519 km (322 mi) | ||||||||
Inclination | 97.46° | ||||||||
Period | 94.72 minutes | ||||||||
| |||||||||
Earth observation satellites series← SARALScatSat-1 → |
Cartosat-2C is an Earth observation satellite in a Sun-synchronous orbit (SSO) and is a fifth flight unit of Cartosat series of satellites. It is a geostationary satellite and appears stationary over a place on the earth. The satellite is built at space application centre Ahmedabad, launched and maintained by the Indian Space Research Organisation (ISRO). It was launched on 22 June 2016.
Instruments
The CartoSat-2C carries a panchromatic camera (PAN) capable of taking black-and-white pictures in the visible region of electromagnetic spectrum. It also carries a High-Resolution Multi-Spectral (HRMX) radiometer which is a type of optical imager. The satellite has a spatial resolution of 0.6 metres. CartoSat-2C is also capable of capturing minute long video of a fixed spot as well, Event Monitoring camera (EvM) for frequent high-resolution land observation of selected areas.
Launch
The satellite launch was originally planned for 20 June 2016, however it was delayed twice due to a gas leakage. It was launched on 22 June 2016 from the second pad of the Satish Dhawan Space Centre. The minisatellites LAPAN-A3, BIROS, and SkySat Gen2-1, microsatellites GHGSat-D, and M3MSat, and nanosatellites Swayam, and SathyabamaSat, and 12 Flock-2P Dove nanosatellites were launched along with CartoSat-2C.
See also
References
- "Cartosat 2, 2A, 2B, 2C, 2D, 2E, 2F". Gunter's Space Page. 7 July 2020. Retrieved 11 May 2021.
- ^ "PSLV-C34: Cartosat Brochure" (PDF). ISRO. Archived from the original (PDF) on 30 November 2016. Retrieved 19 June 2017.
- ^ "PSLV-C34 / Cartosat-2 Series Satellite". ISRO. 22 June 2016. Archived from the original on 20 June 2017. Retrieved 19 June 2017.
- "CARTOSAT 2C". Heavens Above. Retrieved 19 June 2017.
- ^ "ISRO to focus on R&D, industries' space pie to be scaled up". The Hindu. 5 August 2013. Retrieved 9 February 2016.
- "Satellite:Cartosat-2C". WMO. Retrieved 9 February 2016.
- "India's Gateway Into the Future". Archived from the original on 5 March 2017.
- "పిఎస్ఎల్వి-34 ప్రయోగం వాయిదా". Andhrabhoomi. Retrieved 21 June 2016.
Indian Remote Sensing (IRS) satellites | |||||
---|---|---|---|---|---|
IRS-1 | |||||
IRS-P | |||||
Cartosat |
| ||||
Oceansat |
| ||||
Resourcesat |
|
Indian spacecraft | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
Satellites |
| |||||||||||
Space probes |
| |||||||||||
Human spaceflight | ||||||||||||
|
Earth reconnaissance satellites (excluding China, Russia and the United States) | |||||||
---|---|---|---|---|---|---|---|
France |
| ||||||
Germany |
| ||||||
India |
| ||||||
Israel |
| ||||||
Italy |
| ||||||
Japan |
| ||||||
Pakistan |
| ||||||
South Korea |
| ||||||
Spain |
| ||||||
Turkey |
| ||||||
United Kingdom |
|
← 2015Orbital launches in 20162017 → | |
---|---|
January | |
February | |
March | |
April | |
May | |
June | |
July | |
August | |
September | |
October | |
November |
|
December |
|
Launches are separated by dots ( • ), payloads by commas ( , ), multiple names for the same satellite by slashes ( / ). Crewed flights are underlined. Launch failures are marked with the † sign. Payloads deployed from other spacecraft are (enclosed in parentheses). |