Central Silk Board metro station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Upcoming Namma Metro station under Yellow Line

Central Silk Board
Namma Metro station
Final Stages of this metro station under Yellow Line and upcoming Blue Line under Namma Metro
General information
LocationOuter Ring Rd, Central Silk Board Colony, Stage 2, BTM Layout, Bengaluru, Karnataka 560068
Coordinates12°54′59″N 77°37′14″E / 12.91652°N 77.62056°E / 12.91652; 77.62056
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Yellow Line Blue Line
PlatformsSide platform
Platform-1 → Rashtreeya Vidyalaya Road
Platform-2 → Delta Electronics - Bommasandra
Side platform (TBC)
Platform-3 - Train Terminates Here
Platform-4 - Krishnarajapura or KIAL Terminals
Platform numbers (TBC)
Tracks4 (TBC)
Construction
Structure typeElevated, double track
Platform levels(TBC)
Parking(TBC)
Accessible(TBC)
Architect  HCC - URC Construction JV
  AFCONS Ltd.
Other information
Status  Awaiting train sets
  Under construction
Station code(TBC)
History
Opening  January 2025 (January 2025) (TBA)
  December 2026 (December 2026) (TBA)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
BTM Layouttowards Rashtreeya Vidyalaya Road Yellow Line(operational around January 2025) Bommanahallitowards Bommasandra
Terminus Blue Line(Future Service) HSR Layouttowards Krishnarajapura or KIAL Terminals
Route map
Legend
Rashtreeya Vidyalaya Road Green Line
Ragigudda
Jayadeva Hospital
Pink Line
Under construction
BTM Layout
Central Silk Board
Blue Line
Under construction
Bommanahalli
Hongasandra
Kudlu Gate
Singasandra
Hosa Road
Beratena Agrahara
Electronic City
Infosys Foundation Konappana Agrahara
Huskur Road
Biocon Hebbagodi
Mainline rail interchange Hebbagodi Depot (U/C)
Delta Electronics - Bommasandra
Legend
Yellow Line towards RV Road
Central Silk Board
Yellow Line
Under construction
HSR Layout
Red Line towards Hebbala
Agara
Red Line
Proposed
Ibbaluru
Red Line
Proposed
Red Line towards Sarjapura
Bellandur
Kadubeesanahalli
Kodibeesanahalli
Marathahalli
ISRO
Indian Railways Towards UpperLeft arrow Hosur and
LowerRight arrow Banaswadi or Baiyyappanahalli
Doddanekundi
Bagmane Developers - DRDO Sports Complex
Sarasvathi Nagara
Krishnarajapura Krishnarajapuram railway station Purple Line
Indian Railways Towards Left arrow Krishnarajapuram and
Down arrow Yelahanka Jn or Bengaluru Cantt. Right arrow
Mainline rail interchange Baiyappanahalli Depot (U/C)
Kasturi Nagar
Horamavu
HRBR Layout
Kalyan Nagar
HBR Layout
Nagawara
Pink Line
Under construction
Veerannapalya
Kempapura Orange Line
Red Line towards Sarjapura Up arrow
Orange Line to JP Nagar 4th Phase Right arrow
Hebbala Hebbal railway station
Red Line
Planned
Kodigehalli
Jakkur Cross
Jakkur Plantation (no scope)
Indian Railways Towards
Left arrow KSR Bengaluru and Yelahanka Jn Right arrow
Yelahanka
Bagalur Cross
Bettahalasuru (no scope)
Chikkajala (future)
Doddajala
Indian Railways Towards
Left arrow Kolar and Yelahanka Jn Right arrow
Mainline rail interchange Doddajala Depot (U/C)
(at-grade)
Airport City
KIAL Terminals
Location

Central Silk Board is an important, upcoming elevated interchange metro station on the north-south corridor of the Yellow Line and Blue Line of Namma Metro in Bengaluru, India. This metro station serves the Central Silk Board area.

As per latest reports, the Yellow Line is slated to be operational between 2nd & 4th weeks of January 2025 due to lack of train sets which are needed for commencement of operations.
Meanwhile, the elevated section of Blue Line covering a distance of 58.2km (Central Silk Board - KIAL Terminals via Krishnarajapura), is expected to be operational around June 2026.

History

Yellow Line

In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Central Silk Board metro station along the 6.340 km Reach 5 – Package 3 section (Central Silk Board - Rashtreeya Vidyalaya Road) of the 18.825 km Yellow Line of Namma Metro. On 16 May 2017, HCC-URC Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates. Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.

Blue Line

In December 2019, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the Central Silk Board metro station, part of the 9.859 km Reach 2A – Package 1 section (Central Silk Board - Kodibeesanahalli) of the 18.236 km Blue Line of Namma Metro. On 13 October 2020, Afcons Infrastructure was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms.

Station layout

Yellow Line (TBC)

Central Silk Board track layout (TBC)
Legend
to BTM Layout
P1P2
to Bommanahalli
Station with two tracks and two side platforms
G Street level Exit/entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Delta Electronics - Bommasandra
Next station: Bommanahalli
Platform 1
Northbound
Towards ← Rashtreeya Vidyalaya Road
Next station: BTM Layout
Side platform | Doors will open on the left Disabled access
L2

Blue Line (TBC)

Central Silk Board track layout (TBC)
Legend
to HSR Layout
P#P#
to Train terminates here
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Northbound
Towards → Krishnarajapura / KIAL Terminals
Next station: HSR Layout
Platform #
Southbound
Towards ← Train Terminates Here
Side platform | Doors will open on the left Disabled access
L2

Entry/exits

This section is empty. You can help by adding to it. (December 2024)

See also

Portals:

References

  1. "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
  2. "Bengaluru: Yellow Line safety clearance by December end, opening after second week of January". Deccan Herald. Retrieved 29 October 2024.
  3. "HCC-URC JV Lowest Bidder for Bangalore Metro's RV Rd - HSR Layout". The Metro Rail Guy. 16 May 2017. Retrieved 23 October 2024.
  4. "Afcons & Shankaranarayana Win Bangalore Metro Phase 2A ORR Work". The Metro Rail Guy. 13 October 2020. Retrieved 24 October 2024.

External links

Namma Metro
Yellow Line 3
Awaiting
Trainsets
Planned
  • Narayana Hospital
  • Chandapura
  • Attibele Industrial Area
  • Attibele
  • Zuzuvadi
  • Hosur SIPCOT Park 1
  • Hosur Bus Terminal Interchange
  • Hosur SIPCOT Park 2
Blue Line 5
Phase-2A
Phase-2B
Not In scope
Depot(s)
  • Hebbagodi
  • Baiyappanahalli & Doddajala
See also
*Stations in italics are Under Construction
Categories: