Article snapshot taken from Wikipedia with creative commons attribution-sharealike license.
Give it a read and then ask your questions in the chat.
We can research this topic together.
Line 6 of the Chengdu Metro (Chinese: 成都地铁6号线; pinyin: Chéngdū Dìtiě Liù Hào Xiàn) is a rapid transit line in Chengdu. It starts at Wangcong Temple and ends at Lanjiagou. The total length is 68.223 km (42.4 mi) with 56 stations.
Line 6's color is brown. The line began construction in 2016 and was opened on 18 December 2020. Line 6 uses high capacity 8-car Type A trains. Line 6 became the longest stretch of subway to be opened at once in China and since its opening, Line 6 is currently the second longest continuous subway tunnel in the world.
Progress
2017-03-01, the first tunnel boring machine was launched. 42 TBMs will be used simultaneously for the construction of the line.
2019-10-07, tunnel construction completed for Line 6.
2020-05-27, as Phase 3 section of Line 6 finishes track-laying, other Phase 1 and 2 sections officially started testing rolling stock.
2020-07-01, the last section of Line 6, between Xihua Avenue station and Dongguang station, is powered on, paving the way for dynamic testing.
2020-12-18, Line 6 officially opened.
2024-04-08, Qingdao Road station opened for service.
^ "独家探访|关于西部最长地铁6号线,你想知道的一切都在这里" (in Chinese). 2020-09-09. 成都地铁6号线全长68.76千米,共设有56座车站 Cite error: The named reference "sc1" was defined multiple times with different content (see the help page).
地铁6号线二期工程的站点位置也已确定 (in Chinese). Sina Sichuan. 19 May 2015. Retrieved 2015-07-04.