Choir–Sainshand Transmission Line Чойр-Сайншандын Цахилгаан Дамжуулах Aгаарын Шугам | |
---|---|
Location | |
Country | Mongolia |
From | Choir |
To | Sainshand |
Construction information | |
Construction started | 2025 |
Expected | 2027 |
Technical information | |
Type | transmission line |
Type of current | AC |
Total length | 220 km (140 mi) |
AC voltage | 220 kV |
The Choir–Sainshand Transmission Line (Mongolian: Чойр-Сайншандын Цахилгаан Дамжуулах Aгаарын Шугам) is an transmission line in Mongolia connecting Choir and Sainshand.
History
The construction of the transmission line is expected to start in 2025 and completed by 2027.
Technical specifications
The transmission line will have a total length of 220 km with voltage level of 220 kV. It will be a double circuit line. It will also include the construction of substations in both towns.
Finance
The construction of the transmission line will be financed by funds from the European Union, European Bank for Reconstruction and Development and various donors with a total amount of EUR79.67 million.
See also
References
- ^ B., Ooluun (10 October 2024). "Mongolia Partners with the EU and EBRD to Boost Renewable Energy Infrastructures". Mongolian National News Agency. Retrieved 6 January 2025.
- "EU and Mongolia sign transmission line deal". Transformers Magazine. 11 October 2024. Retrieved 6 January 2025.