(Redirected from Direttissima) Key central Italian transport link
Direttissima Firenze-Roma
ETR 500 on a viaduct near Arezzo
Overview
StatusOperational
OwnerRFI
LocaleItaly
Termini
Service
TypeHeavy rail
SystemItalian high-speed rail system
Operator(s)Rete Ferroviaria Italiana (RFI) (2001–present)
FS (1977–2001)
History
Opened24 February 1977
completed on 26 May 1992
Technical
Line length254 km (158 mi)
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification3 kV DC
Operating speed250 km/h (155 mph)
Route map

Legend
from Bologna (high-speed
and traditional) and Viareggio
Nodo di Firenze (under construction)
From Pisa, Livorno
Firenze Rifredi
Firenze Belfiore
(under construction)
0.00 Firenze Santa Maria Novella
Firenze Statuto
to Faenza
3.96 Firenze Campo di Marte
Nodo di Firenze (under construction)
6.95 Firenze Rovezzano
Florence–Rome slow line (LL)
San Donato crossover
Arno
Autostrada A1European route E35
Florence–Rome line
Arno
26.25 Valdarno North interconnection with the LL
Autostrada A1European route E35
46.28 Valdarno South interconnection with the LL
Arno
Florence–Rome LL
61.44 Arezzo North interconnection with the LL
Arezzo
71.96 Arezzo South interconnection with the LL
Autostrada A1European route E35
106.78 Chiusi North junction
to Siena, Empoli
Montallese (disused)
Florence–Rome LL
Chiusi-Chianciano Terme
126.64 Chiusi South junction
Florence–Rome LL
Autostrada A1European route E35
Florence–Rome LL
Florence–Rome LL
Paglia River
146.11 Orvieto North interconnection with the LL
Orvieto
156.61 Orvieto South interconnection with the LL
Tiber
186.82 Orte North interconnection with the LL
Orte
196.35 Orte South interconnection with the LL
Florence–Rome LL
Tiber
Florence–Rome LL
Tiber
Tiber
From Florence LL
244.81 Settebagni
Grande Raccordo Anulare
248.26 Fidene
250.70 Nuovo Salario
Rome Marshalling Yard
Aniene
253.85 Roma Nomentana
256.53 Roma Tiburtina
to Pescara
to Naples (high-speed)
Roma San Lorenzo depot
from Pisa, Naples (via Formia),
Naples (via Cassino)
261.03 Roma Termini
Source: Italian railway atlas
This diagram:
"Direttissima" redirects here. For the mountaineering term, see Direttissima (climbing).

The Florence–Rome high-speed railway line is a link in the Italian high-speed rail network. It is known as the ferrovia direttissima Firenze-Roma in Italian—meaning "most direct Florence–Rome railway" (abbreviated DD); this name reflects the naming of the Rome–Formia–Naples Direttissima opened in 1927 and the Bologna–Florence Direttissima opened in 1934. The line was the first high-speed line opened in Europe when more than half of it opened on 24 February 1977. It was completed on 26 May 1992, reducing the time of the fastest trains between the two cities to 1 hour and 20 minutes. The old line is referred to by Ferrovie dello Stato (the State Railways) as the Linea Lenta (meaning "slow line", abbreviated LL) to distinguish it from the parallel high-speed line.

In 2016 a contract was let for resignalling with ETCS level 2. The line is part of Corridor 1 of the European Union's Trans-European high-speed rail network, which connects Berlin and Palermo.

History

This section does not cite any sources. Please help improve this section by adding citations to reliable sources. Unsourced material may be challenged and removed.
Find sources: "Florence–Rome high-speed railway" – news · newspapers · books · scholar · JSTOR (July 2022) (Learn how and when to remove this message)

The 254-kilometre (158 mi) railway between Rome and Florence developed from several different lines by several different companies for different purposes and as a result was curvy and slow. Over the years there had been many studies, proposals and projects for deviations to straighten the line but nothing came of them. After World War II, it was finally decided to build a new line that was straighter, faster and especially shorter (237.5 kilometres (147.6 mi)) than the old Florence-Rome line; it was also to be well-integrated with the existing line, rather than replace it. The project was approved and funded in late 1968 and early 1969. This was the first high-speed rail project—in the sense that "high-speed" is now used—to be commenced in Europe.

On 25 June 1970, work began on the most important element of the project: the 5,375-metre-long (17,635 ft) Paglia viaduct over the Paglia river, which is made up of 205 25-metre-long (82 ft) linear spans of and five 50-metre-long (160 ft) arched spans and is the longest viaduct in Europe. It was expected that the first 138-kilometre (86 mi) section of the line from Roma Termini to Città della Pieve would take five years to complete, but it was not in fact opened until 24 February 1977. It was a milestone in the history of Italian railways, but progress was subsequently slowed by numerous obstacles, some of a political nature. The line had to be rerouted near Arezzo due to problems in driving a tunnel. The official opening took place with a train consisting of an FS Class E444 locomotive and Gran Comfort coaches.

The 51-kilometre (32 mi) section of line between Città della Pieve and Arezzo was completed on 29 September 1985; the 20-kilometre (12 mi) section between Valdarno and Florence was opened on 30 May 1986 and finally on 26 May 1992 the 44-kilometre (27 mi) section between Arezzo and Valdarno was opened.

Route

This section relies largely or entirely on a single source. Relevant discussion may be found on the talk page. Please help improve this article by introducing citations to additional sources.
Find sources: "Florence–Rome high-speed railway" – news · newspapers · books · scholar · JSTOR (July 2022)
Direttissima from the A1 near Orte

The line has a largely straight path with a maximum grade of 0.8%, no level crossings or intersections of any kind with road or rail traffic, and the centre of tracks 4 metres (13 ft) apart to counteract the dynamic effects created by trains passing each other. Communication with drivers consists of an adaptation of the Italian RS4 Codici train protection system with in-cabin repetition of signals using nine codes and earth to train telephone communication. The minimum radius of curves is 3,000 metres (9,800 ft), enabling an operating speed of 250 km/h (155 mph). Connections between the two tracks in both directions every 16.2 kilometres (10.1 mi) allow trains to use either track in either direction or for all operations to operate on a single track if necessary.

The rails are laid using a UIC 60 kilograms per metre (40 lb/ft) rail profile, with electrically welded rails attached to 2.30-metre-long (7 ft 7 in) prestressed reinforced concrete sleepers, spaced 60 centimetres (24 in) apart with Pandrol clips. The interconnections between the high-speed lines and the old Florence–Bologna lines are implemented through grade-separated crossings above or below the line rather than crossing over the opposing track on the level. The switches between the two running lines are capable of supporting speeds of up to 100 km/h (62 mph), while the 15 switches to connecting lines support speeds of up to 160 km/h (99 mph). The line is electrified at 3 kV DC, and supplied by substations at 16 kilometres (9.9 mi) intervals.

Signalling upgrade

Ansaldo STS upgraded the signalling and train protection system with ETCS level 2, and it was first activated on the section between PM Rovezzano - Arezzo South interconnection in December 2020. This was the first phase of the adjustment plan to AV/AC (High Speed/High Capacity) standards proposed by RFI.

Future

It is proposed to raise the maximum speed from 250 km/h (155 mph) to 270 or 280 km/h (170 or 175 mph). It has additionally been proposed to re-electrify the line at 25 kV AC in the past but this has been abandoned.

See also

References

Footnotes

  1. Atlante ferroviario s'Italia e Slovenia [Italian and Slovenian railway atlas)] (1 ed.). Schweers + Wall. 2010. pp. 52–3, 58–9, 64–5, 69, 145, 147. ISBN 978-3-89494-129-1.
  2. "Special report: A European high-speed rail network". op.europa.eu. Retrieved 2023-07-22.
  3. ^ "40 Years of the Direttissima". Today's Railways Europe (258): 36–9. June 2017.

Sources

  • Ascenzi, S. (1977). "La Roma Firenze tra cronaca e storia". Voci della Rotaia (in Italian). Rome: Ferrovie dello Stato.
  • Hardmeier, W.; Schneider, A. (1989). Direttissima Bologna-Firenze-Roma (in Italian). Turin: Edizioni Locovision.
  • Pallotta, T.; Mosca, M. (2007). Dalla Direttissima all'alta velocità (in Italian). Ponte San Nicolò.{{cite book}}: CS1 maint: location missing publisher (link)
  • Tiberi., G. (1989). "Gli investimenti ferroviari: 150 anni di altalena". La Tecnica Professionale (in Italian). Rome: CIFI.
  • 122 km de Direttissima - pp. 6-14 + pp. 39-43 - 26 photo - vie du rail n°1584 - 13/03/1977


Europe Berlin–Palermo railway axis
High-speed railway lines
Africa
Morocco
Asia
China
Indonesia
Japan
Saudi Arabia
South Korea
Taiwan
Turkey
Uzbekistan
Europe
Belgium
Denmark
Finland
France
Germany
Greece
Italy
Netherlands
Norway
PolandGrodzisk–Zawiercie*
Russia
Spain
SwedenBothnia Line
United Kingdom
North America
United StatesNortheast Corridor*
OceaniaNone
South AmericaNone
* An asterisk indicates overlap with conventional services.
Italy Major railway lines in Italy
High-speed
Standard-speed
Categories: