Fenghuang Xincun 凤凰新村 | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Chinese name | |||||||||||
Simplified Chinese | 凤凰新村站 | ||||||||||
Traditional Chinese | 鳳凰新村站 | ||||||||||
Literal meaning | Fenghuang New Village Station | ||||||||||
| |||||||||||
General information | |||||||||||
Location | Haizhu District, Guangzhou, Guangdong China | ||||||||||
Operated by | Guangzhou Metro Co. Ltd. | ||||||||||
Line(s) | Line 8 | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
History | |||||||||||
Opened | 3 November 2010 | ||||||||||
Services | |||||||||||
| |||||||||||
Fenghuang Xincun Station (Chinese: 凤凰新村站) is a station on Line 8 of the Guangzhou Metro. The underground station is located on Gongye Avenue North (工业大道北) in the Haizhu District. The station opened on November 3, 2010 after a delay caused by the cooling tower at Shayuan Station. It was the terminus of the line until December 28, 2019 when the line was extended to Cultural Park station.
Station layout
G | - | Exits |
L1 Concourse |
Lobby | Customer Service, Shops, Vending machines, ATMs |
L2 Equipment Area |
- | Station equipment |
L3 Platforms |
Platform 1 | 8 towards Jiaoxin (Tongfuxi) |
Island platform, doors will open on the left | ||
Platform 2 | 8 towards Wanshengwei (Shayuan) |
Exits
Exit number | Exit location | |
---|---|---|
Exit A | Gongye Dadaobei | |
Exit B | Nantian Lu |
References
- 沙园站冷却塔昨复工 (in Simplified Chinese). 2010-09-02.
23°05′41″N 113°15′21″E / 23.09480°N 113.25589°E / 23.09480; 113.25589
Categories: