Misplaced Pages

Guaanzhuang station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Beijing Subway station For the 关庄 (Guānzhuāng) station on Line 15, see Guanzhuang station (Line 15).
Guaanzhuang
管庄Beijing Subway
Westbound platform
General information
LocationGuanzhuang, Chaoyang District, Beijing
China
Coordinates39°54′33″N 116°35′56″E / 39.9092°N 116.5990°E / 39.9092; 116.5990
Operated byBeijing Mass Transit Railway Operation Corporation Limited
Line(s)     Batong line (through operation to Line 1)
Platforms2 (2 side platforms)
Tracks2
Construction
Structure typeElevated
AccessibleYes
Other information
Station codeBT06
History
OpenedDecember 27, 2003; 21 years ago (2003-12-27)
Services
Preceding station Beijing Subway Following station
Shuangqiaotowards Gucheng Batong line (through operation to Line 1) Baliqiaotowards Universal Resort
Location
Guaanzhuang is located in BeijingGuaanzhuangGuaanzhuangLocation in Beijing

Guaanzhuang station (simplified Chinese: 管庄站; traditional Chinese: 管莊站; pinyin: Guǎnzhuāng zhàn) is a station on the Batong line (through operation to Line 1) of the Beijing Subway, and is located in the Guanzhuang area (管庄地区) of Chaoyang District.

In future, it will be a transfer station with Line 22 (Pinggu line) which is currently under construction.

History

Guaanzhuang Station (bottom), taken from Tongzhou district

Guaanzhuang station opened on December 27, 2003. The installation of automatic platform gates started on August 9, 2012, and finished in September 2012.

Guaanzhuang Station before the installation of platform screen doors

Name conflict

This station had the same English name as a station on Line 15, also part of the Beijing Subway system. In Chinese this is not a problem as the station on Line 15 is called and one on the Batong Line is called , but the government policy in China is to create English names from the pinyin transliteration of Chinese language, but without the tone markers; thus 关庄 (Guānzhuāng) and 管庄 (Guǎnzhuāng) are both rendered as Guanzhuang, making them look identical.

In December 2019, the 管庄 (Guǎnzhuāng) station on Batong line changed spelling to Guaanzhuang.

Station layout

The station has 2 elevated side platforms.

Exits

There are 6 exits, lettered A1, A2, A3, A4, B1, and B2. Exits B1 and B2 are accessible.

References

  1. ^ "JPG格式线路图下载 北京地铁官方网站". Archived from the original on 2022-12-31.
  2. (Chinese) 13号线、八通线加装屏蔽门工程试点站已于近日开工. Beijing Subway. Archived from the original on September 23, 2012. Retrieved September 15, 2012.
  3. (Chinese) 八通线、13号线试点站屏蔽门安装主体工程完工. Beijing Subway. September 28, 2012. Archived from the original on February 7, 2013. Retrieved November 8, 2012.

External links

Beijing Subway stations
Line 1 & Batong line
Stations that are proposed, under planning or under construction are shown in italics.


This article related to the Beijing Subway is a stub. You can help Misplaced Pages by expanding it.

Categories: