Hiwada Station 日和田駅 | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Hiwada Station in July 2009 | |||||||||||
General information | |||||||||||
Location | Hiwada-machi Obitsu 42, Kōriyama, Fukushima-ken 963-0534 Japan | ||||||||||
Coordinates | 37°26′46″N 140°23′19″E / 37.4462°N 140.3885°E / 37.4462; 140.3885 | ||||||||||
Operated by | JR East | ||||||||||
Line(s) | ■ Tōhoku Main Line | ||||||||||
Distance | 232.4 km from Tokyo | ||||||||||
Platforms | 1 island + 1 side platforms | ||||||||||
Tracks | 3 | ||||||||||
Other information | |||||||||||
Status | Unstaffed | ||||||||||
Website | Official website | ||||||||||
History | |||||||||||
Opened | June 1, 1897 | ||||||||||
Passengers | |||||||||||
Services | |||||||||||
| |||||||||||
|
Hiwada Station (日和田駅, Hiwada-eki) is a railway station in the city of Kōriyama, Fukushima Prefecture, Japan operated by East Japan Railway Company (JR East).
Lines
Hiwada Station is served by the Tōhoku Main Line, and is located 232.4 rail kilometers from the official starting point of the line at Tokyo.
Station layout
The station has two opposed side platforms connected to the station building by a footbridge. The station is unattended.
Platforms
1 | ■ Tōhoku Main Line | for Kōriyama |
2 | ■ Tōhoku Main Line | for Fukushima |
History
Hiwada Station opened on June 1, 1897. The station was absorbed into the JR East network upon the privatization of the Japanese National Railways (JNR) on April 1, 1987.
Surrounding area
See also
External links
Media related to Hiwada Station at Wikimedia Commons
- Official website (in Japanese)
References
- Ishino, Tetsu (1 October 1998). 停車場変遷大事典 国鉄・JR編 Ⅱ [Station Transition Directory – JNR/JR II] (in Japanese) (1st ed.). JTB. p. 400.
This Fukushima Prefecture railroad station-related article is a stub. You can help Misplaced Pages by expanding it. |