Combined heat and gas-fired power plant For the (1912) power station on Immingham dock, see Immingham dock powerstation.

Immingham Power Station
Immingham power station
Viewed from the south in April 2006
CountryEngland
LocationLincolnshire, Yorkshire and the Humber
Coordinates53°38′18″N 0°14′00″W / 53.63833°N 0.23328°W / 53.63833; -0.23328
StatusOperational
Commission date
  • 2004
Owner
OperatorsConoco Phillips Power Operations
(2004–present)
Thermal power station
Primary fuelNatural gas
Power generation
Units operational2004
Nameplate capacity730 MW
External links
Websitewww.vpi-i.com
CommonsRelated media on Commons
[edit on Wikidata]
grid reference TA169172

Immingham Combined Heat and Power Plant (also known as VPI Immingham) is a combined heat and power, gas-fired power plant adjacent to the Humber Oil Refinery near to South Killingholme North Lincolnshire, England.

The plant opened in 2004 with a 730 MW generating capacity, and was expanded to 1,180 MW in 2009; the station was developed by ConocoPhillips until its sale to Vitol in 2013.

History

Prince Andrew, Duke of York visited on the morning of Tuesday 5 July 2005, later visiting Grimsby, and the local police helicopter at Kirmington Airport.

Description

See main article Industry of the South Humber Bank § Industrialization in "ConocoPhillips"

A 734 MW power station was developed at a cost of £350 million by ConocoPhillips and opened in 2004 adjacent to the Humber Oil Refinery. The plant supplied 'waste' steam to both Humber and Lindsey Oil Refineries, and incorporated auxiliary boilers for steam supply to the refineries.

In 2009 the plant's capacity was raised to 1,180 MW, by the addition of a 285 MW gas turbine, and 200 MW heat recovery steam generator. In 2013 the plant was acquired by Vitol.

In August 2020, consent was given for the development of an additional gas-fired plant to be built next to the current facility. The expansion will increase Immingham's output to 1,240MW. The proposal was initially made in July 2018.

References

  1. Laister, David (10 August 2020). "Go-ahead for South Humber Bank power station expansion". Business Live. Retrieved 26 August 2021.
  2. Times Wednesday July 6 2005, page 61
  3. Prince Andrew visit
  4. "Go-ahead for £120m Immingham gas turbine power station". The Construction Index. 10 August 2020. Retrieved 26 August 2021.
  5. "Immingham gas-fired power station approved by government". BBC News. 19 August 2020. Retrieved 26 August 2021.
  6. "VPI Immingham proposes to build new gas-fired power station". Vitol. 6 July 2018. Retrieved 26 August 2021.

External links

Electricity generation in Yorkshire and the Humber
Power stations
Biomass
Active
Proposed/future
Closed
Coal
Closed
Proposed
Gas
Active
Hydro
Active
Proposed/futureNaburn
Incinerators
/waste
Active
Closed
Wind
Active
Proposed/future
Organisations
Phillips 66 Company
Predecessors
Brands
Subsidiaries
Current
Former
Facilities
Current
Former
Industrial disasters
Related topics
Categories: