Kazarman hydropower cascade | |
---|---|
Approximate location in Kyrgyzstan | |
Country | Kyrgyzstan |
Location | Jalal-Abad Region |
Coordinates | 41°35′N 73°56′E / 41.583°N 73.933°E / 41.583; 73.933 |
Status | Proposed |
Dam and spillways | |
Impounds | Naryn |
Power Station | |
Installed capacity | 1160 MW |
The Kazarman hydropower cascade (Russian: Казарманский каскад ГЭС) is a future hydropower project near Kazarman in Jalal-Abad Region, Kyrgyzstan. When completed, it will consist of 4 hydropower plants on the river Naryn: Ala-Buga, Kara-Bulung-1, Kara-Bulung-2 and Toguz-Toro, with a total installed capacity of 1160 MW.
References
- National Energy Holding (2020). "Promising investment projects in the energy sector" (PDF) (in Russian).
- State Committee for Industry, Energy and Subsoil Usage of the Kyrgyz Republic (2019). "Hydropower of the Kyrgyz Republic" (PDF) (in Russian).
- "CMD projects in the Kyrgyz Republic. Hydropower" (PDF). 2011.
This article about a hydroelectric power plant is a stub. You can help Misplaced Pages by expanding it. |