Misplaced Pages

Kenya Pipeline Company

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these messages)
This article relies excessively on references to primary sources. Please improve this article by adding secondary or tertiary sources.
Find sources: "Kenya Pipeline Company" – news · newspapers · books · scholar · JSTOR (February 2009) (Learn how and when to remove this message)
This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.
Find sources: "Kenya Pipeline Company" – news · newspapers · books · scholar · JSTOR (October 2011) (Learn how and when to remove this message)
(Learn how and when to remove this message)
Kenya Pipeline Company
Logo of KPC.jpg
Company typeGovernment-owned corporation
Founded1977
HeadquartersNairobi, Kenya
Key peopleFaith Boinett,
Chairperson of the Board of Directors
Joe Sang,
Managing Director
Websitewww.kpc.co.ke

Kenya Pipeline Company (KPC) is a state corporation that has the responsibility of transporting, storing and delivering petroleum products to the consumers of Kenya by its pipeline system and oil depot network.

Overview

The Kenya Pipeline Company was incorporated on 6 September 1973 and started commercial operations in 1978. The company is a state corporation under the Ministry of Energy with 100% government shareholding.

Kenya Pipeline Company operates a pipeline system for transportation of refined petroleum products from Mombasa to Nairobi and western Kenya towns of Nakuru, Kisumu and Eldoret. Working closely with the National Oil Corporation of Kenya, KPC operates 5 storage and distribution depots for conventional petroleum products, located in Eldoret, Kisumu, Mombasa, Nairobi and Nakuru. Depots are fed by domestic-manufactured product from the Kenya Petroleum Refinery near Nairobi and imported, refined petroleum product from the Kipevu Oil Storage Facility near Mombasa. The company operates two aviation fuel depots at Jomo Kenyatta Airport, Nairobi, and Moi International Airport, Mombasa.

In collaboration with the Government, KPC facilitates the implementation of Government policies:

  • Acts as a Government agent in specific projects as directed through the Ministry of Energy. To this end, the company works with the government in the implementation of key projects such as the extension of the Oil Pipeline to Uganda and the LPG import handling and storage facilities.
  • Assists in the fight against fuel adulteration and dumping.
  • Ensures efficient operation of petroleum sub-sector.

Unlike some state corporations, KPC does not depend on government subsidies, but is a source of revenue to the government in terms of dividends and taxes. It is supported by major petroleum companies which are signatories to the network, including Dalbit Petroleum.

In 2011, the government of newly independent South Sudan expressed interest to building a pipeline connecting the oil fields in that country to the existing South-Eldoret-Mombasa pipeline in Kenya.

In 2016, it was announced that KPC has secured $350 million to install a new 865-kilometers long pipeline from Mombasa to Nairobi. KPC is the largest consumer of electricity in Kenya.

In November 2023, Kenya pipeline was listed among 11 other state corporations that were to be privatised by the Kenyan government.

Accidents

Corruption scandal

On 7 December 2018, Joe Sang, the CEO of the Kenya Pipeline Company (KPC), was arrested with four other senior officials in connection with the loss of an unspecified amount of money during the construction of an oil jetty in the western city of Kisumu.

See also

References

  1. "Kenya Pipeline Company". Retrieved 2020-05-29.
  2. "Dalbit Petroleum Kenya | About Us". www.dalbitpetroleum.com. Archived from the original on 2017-04-19. Retrieved 2017-04-18.
  3. "South Sudan to link to Kenya oil pipeline". Reuters. 6 July 2011. Archived from the original on 14 May 2012. Retrieved 19 October 2011.
  4. "Kenya Will Begin Constructing Its Crude Oil Pipeline in 2018". Bloomberg.com. 2016-06-29. Retrieved 2017-04-18.
  5. Kajilwa, Graham (2017-12-18). "Why Bamburi cement put off mega plans for alternative solar energy". The Standard. Retrieved 2017-12-18.
  6. Mwangi, Denis (December 7, 2018). "Kenya Pipeline CEO Joe Sang Arrested". Kenyans.co.ke. Retrieved December 9, 2020.
  7. "UPDATE 1-Kenya Pipeline Company's CEO arrested over loss of funds". Reuters. December 7, 2018. Retrieved December 9, 2020.

External links

Categories: