Metro line in Changsha, China
Line 3 of the Changsha Metro (Chinese : 长沙地铁三号线; pinyin : Chǎngshā Dìtiě Sān Hào Xiàn ) is a rapid transit line in Changsha and Xiangtan . The first phase opened on 28 June 2020 with 25 stations.
The segment from Dawangshan to Xiangtan North Railway Station opened on 28 June 2023 in the name of Xihuan Line(西环线).
One year later, Xihuan Line is included in Line 3, the former name is cancelled.
Opening timeline
Segment
Commencement
Length
Station(s)
Name
Shantang — Guangsheng
28 June 2020
36.4 km (22.6 mi)
25
Line 3 (Phase 1)
Shantang — Xiangtan North Railway Station
28 June 2023
17.29 km (10.74 mi)
8
Xihuan Line(2023.6.28-2024.6.27)
Line 3(2024.6.27-)
Stations
References
^ "长沙地铁3号线5号线预计6月28日载客初期运营" . 2020-06-25.
"地铁即将直达湘潭!带你提前打卡长株潭城轨西环线湘潭北站" . VOC . 27 June 2023.
^ "长株潭城际轨道交通西环线一期工程通车试运行" . Archived from the original on 2023-04-22.
"长株潭西环线上半年将载客运营" .
External links
Public transportation in Hunan Changzhutan Metropolitan Region (HN) Changsha Metro Lines in operation
Under construction
2 (west extension)
6 (east extension)
7
Planned
Changsha Maglev Lines in operation
Under construction
Hengyang Metro Other rail transits CR C-trainTransportation hubs Int'l airports
Railway stations
Categories :
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.
**DISCLAIMER** We are not affiliated with Wikipedia, and Cloudflare.
The information presented on this site is for general informational purposes only and does not constitute medical advice.
You should always have a personal consultation with a healthcare professional before making changes to your diet, medication, or exercise routine.
AI helps with the correspondence in our chat.
We participate in an affiliate program. If you buy something through a link, we may earn a commission 💕
↑