Metro line in Kunming, China
Line 3 Train of Line 3 leaving East Coach StationOverview Status Operational Locale Kunming , Yunnan Province , China Termini Stations 20 Service Type Rapid transit Operator(s) Kunming Rail Transit Corporation History Opened 29 August 2017; 7 years ago (2017-08-29) Technical Line length 19.16 km (11.91 mi) Number of tracks 2 Character Underground and elevated Track gauge 1,435 mm (4 ft 8+1⁄2 in)
Line 3 is a rapid transit line on the Kunming Metro , serving the city of Kunming , China . It links Line 2 at Dongfeng Square , and links Line 6 at East Coach Station. It is an east-west line of the system.
Phase I has a total length of 19.16 km (11.91 mi) and 17 stations. It opened in August 2017 along with Line 6.
Opening timeline
Segment
Commencement
Length
Station(s)
Name
Western Hills Park — East Coach Station
29 August 2017
23.36 km (14.52 mi)
20
Phase 1
Route
Line 3 runs in Xishan District , Wuhua District , Panlong District and Guandu District .
References
昆明地铁3号线、6号线一期8月29日开通载客试运营
网易. "昆明地铁3号线全线贯通 2017年上半年将投入运营(图)_网易新闻" . news.163.com . Retrieved 2016-07-16.
Public transportation in Yunnan Dianzhong Metropolitan Region (YN) Kunming Metro Lines in operation
Under construction
1 Northwest ext.
2 Phase II
Planned
Honghe Tram Wenshan Tram Lijiang Tram Baoshan TramTransportation hubs Int'l airports
Railway stations
Portal :
Categories :
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.
**DISCLAIMER** We are not affiliated with Wikipedia, and Cloudflare.
The information presented on this site is for general informational purposes only and does not constitute medical advice.
You should always have a personal consultation with a healthcare professional before making changes to your diet, medication, or exercise routine.
AI helps with the correspondence in our chat.
We participate in an affiliate program. If you buy something through a link, we may earn a commission 💕
↑