(Redirected from Line 4, Hangzhou Metro )
Metro line of the Hangzhou Metro system in China
Line 4 4 A train of Hangzhou Metro Line 4Overview Status Operational Owner City of Hangzhou Locale Hangzhou , Zhejiang , China Termini Stations 33 (32 in operation) Service Type Rapid transit System Hangzhou Metro Operator(s) Hangzhou Metro Corporation Depot(s) Qibao Stabling Yard Gouzhuang Depot Rolling stock PM082 PM174 Daily ridership 422,800 (2019 Peak) History Opened 2 February 2015; 9 years ago (2015-02-02) Technical Line length 46.85 km (29.11 mi) Number of tracks 2 Character Underground Track gauge 1,435 mm (4 ft 8+1⁄2 in) Electrification Overhead line , 1500 V DC Operating speed 80 km/h (50 mph)
Line 4 of the Hangzhou Metro (Chinese : 杭州地铁四号线; pinyin : Hángzhōu Dìtiě Sìhào Xiàn ) is a rapid transit line in Hangzhou .
Description
Phase 1
Phase 1 of the line started operation since 2015. Running northeast–southwest, the line connects Hangzhou East railway station , Qianjiang New City and Binjiang District . Part of the line (Qianjiang Road to Shuicheng Bridge) runs along the north bank of Qiantang River .
Phase 2
The second phase of Line 4 is 26 km in length. This extension was opened on 21 February 2022.
Opening timeline
Segment
Commencement
Length
Station(s)
Name
Pengbu — Jinjiang
2 February 2015
9.6 km (6.0 mi)
9
Phase 1 (initial section)
Xintang
28 June 2015
Infill station
1
Jinjiang — Puyan
9 January 2018
11.2 km (7.0 mi)
7
Phase 1 (final section)
Lianzhuang
6 June 2018
Infill station
1
Pengbu — Chihua Street
21 February 2022
26 km (16 mi)
14
Phase 2 (exclude Ducheng Ecopark Station)
Stations
Legend
- Operational
- Under construction
^ Out-of-station interchange with East Railway Station (East Square)
To scale map of Hangzhou Metro Line 4
Rolling stock
Stock
Class
Year built
Builder
Number built
Numbers
Formation
Depots
Line assigned
Notes
PM082
B
2013-2015
CSR Nanjing Puzhen
174 (29 sets)
04 001 - 04 029 (040011-040296)
Tc+Mp+M+M+Mp+Tc
Gouzhuang Yard Qibao Depot
4
PM174
2020-2022
CRRC Nanjing Puzhen
192 (32 sets)
04 030 - 04 061 (040301-040616)
See also
References
^ "杭州地铁4号线二期又迎新进展" . 2021-04-25.
"杭州市人民政府关于杭州地铁4号线二期工程、8号线一期工程、9号线一期工程车站站名的批复" . 2021-03-11.
Categories :
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.
**DISCLAIMER** We are not affiliated with Wikipedia, and Cloudflare.
The information presented on this site is for general informational purposes only and does not constitute medical advice.
You should always have a personal consultation with a healthcare professional before making changes to your diet, medication, or exercise routine.
AI helps with the correspondence in our chat.
We participate in an affiliate program. If you buy something through a link, we may earn a commission 💕
↑